2022-01-30 | Quarterly Report December 2022
TEM | Quarterly Report - Period Ending 31 December 2022
Key Points
●
Diamond drilling at the Master Target
●
Diamond and RC drilling at the Clover Target
●
●
Regional Aircore program completed
Large surface geochemical sampling project commenced at Ktulu target
●
●
Investment in Tolu Minerals Ltd - set to list on ASX in February 2023
TEM intends to merge lithium assets with Nevada project and IPO Electra Minerals Ltd
Projects
Yalgoo Region
Tempest has 4 exciting project areas in the Yalgoo region of Western Australia totalling more than 900km2.
The projects are located within the prolific Yalgoo Greenstone Belt which hosts a number of world class
mines. Tempest has used data driven processes to identify poorly or unexplored areas of highly prospective
geology which includes multiple instances of proven mineralisation.
Figure 01: Overview of the TEM Yalgoo Projects
Meleya
The Meleya Project is part of Tempest Minerals’ flagship Yalgoo Portfolio with a
combined tenure of 4 exploration leases extending over more than 600km2 1.
Tempest has for some time considered the target zones at Meleya to represent
one of the most exciting greenfields base and precious metal upside exploration
opportunities in the industry today.
In 2019, the TEM technical team noted discordant geophysical signatures which
did not correlate with existing geological maps of the region 2. In 2020/21 ,
interpretations, based on extensive fieldwork, resulted in the identification of more
than 50 km of strike length of a previously unrecognised and unexplored segment
of the Yalgoo Greenstone Belt which currently hosts a number of world class
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
mines . The first drilling ever in the new mineralised region (state government co-funded 3 ) was conducted in
March 2022 for the purpose of establishing stratigraphic controls. WARDH 72 and 73 encountered multiple
zones of visual mineralisation zones 4,5. This was followed by an downhole electromagnetic (DHEM) survey on
the two holes which noted the presence of podiform sulphide mineralisation 6 which was confirmed by assays
received 7. The project prospectivity was further enhanced by the identification of numerous targets via an
EPR (electron para-magnetic) survey conducted in 2022.
8
Figure 02: Evolution of the Meleya Project (Legacy map, outcrop, 2021 interpreted geology and targets)
Figure 03: Overview of the Meleya Project
Tempest activities in the December quarter were dominated by work at the Meleya Project including:
-
A large regional surface geochemistry sampling project commenced during the quarter at the Ktulu
target
91 drillholes for 7,336 metres of drilling (diamond, reverse circulation and aircore) completed.
Widespread alteration and minor sulphides were intersected in multiple locations.
Assays are expected in Q1 of 2023.
Page 2 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Master Target
The Master Target is a magnetic high feature in the south of the Meleya Project with a blind surface
expression (thick overlying fluvial sediments).
Drilling (Diamond)
In the December quarter, TEM completed a diamond drilling program consisting of 1 hole (WARDH74) for
427.1m at the Master target 9. Drilling intersected 40m of cover and lateritic clay horizons underlain by
repeating sequences of greenstones sequestered by the emplacing intermediate intrusives. Intermittent
minor sulphides were intersected throughout the hole along with contained intermittent potassium-feldspar
epidote and silica flooding alteration.
FIgure 04: Shear zone with silica flooding and minor sulphides
Page 3 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Clover Target
The Clover Target is a magnetic low stratigraphic sequence 2.5km to the south east of the Orion target. TEM
consider this to likely represent a previously unrecognised geological sequence within the mineralised Meleya
Belt or potentially a strongly altered and ‘demagnetised’ zone such is typical of greenstone hosted
hydrothermal gold mineralisation in Western Australia.
Drilling (Diamond)
WARDH75
10
was drilled to 637.1m and
was designed to intersect the western
edge of the above-mentioned multi-km
low magnetism zone.
Geology encountered from 0-422m
included a thick (~68m) laterite zone of
weathered intrusives with extensive
highly sheared intermediate intrusives,
highly altered and mineralised fine
grained mafic to ultramafic sequences
and at least 3 mafic to ultramafic dyke
generations with alteration including
silicification, calcite veins and trace
sulphide species.
At
422m
greenstones
were
encountered with significant silica and
epidote
overprinting
until
569m
downhole.
The base of the hole was dominated by
dyke swarms and silica dominated
skarn-like alteration and trace sulphides
(<0.1%).
Figure 05: Silica and sulphide (pyrite and pyrrhotite) altered medium
grained dolerite with coarse pyroxene phenocrysts at 580m
Drilling (RC)
An RC drilling program to test the lateral thickness and several geological structures and geochemical
anomalies adjacent the diamond hole at the Clover target was completed for a single section. 20 holes of
variable depth were completed. All holes encountered comparable geology to WARDH75 with laterite
underlain by felsic granitoids intersected by mafic intrusions and strong alteration throughout.
Page 4 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Regional Drilling
The regional drilling project aim was to collect shallow geochemical data to augment the existing surface
sampling and mapping surrounding the Orion target for further geological knowledge and assist with
delineating additional drill targets in the future 11 .
Figure 06: Meleya Project Drilling Program Overview
Drilling was completed on nominal 500m x 500m spacing over an area of some 4km x 4km of the central
Meleya Belt and consisted of some 6,269 metres of aircore and reverse circulation drilling. This represents a
small fraction of the Meleya Project and phase 1 of a number of possible campaigns.
Sulphides and visible mineralised intervals were logged across all drill lines. The most prominent zone being
on the most northern line showed a unit similar to the Zinc rich zone noted previously in Orion Holes
WARDH72 and WARDH73. This zone is ~10m interval from 68 metres downhole of with average of 1% pyrite
and trace sphaelerite within a pervasive chlorite, silica halo.
Page 5 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Figure 07: WARDH156 75-77m Mafic schist with disseminated sulphides inc. trace sphaelerite associated
with silica and chlorite overprinting with greater interval spanning 68-77m.
Page 6 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Euro
The Euro Project comprises four (4) 100% Tempest owned tenements (more than
176km2) within the prospective Southern Yalgoo Greenstone Belt located between
the neighbouring Rothsay (Gold), Mt Mulgine (Tungsten/Gold) and the Karara
(Iron/Gold) Mines. The project has thick gold intercepts in legacy drilling, however
due to depressed metal prices at the time were never thoroughly assessed by
previous owners. While most of the greater Euro Project remains unexplored or
unexplored, significant gold mineralisation has been recorded previously in the
north of the project but not thoroughly tested for continuity. In addition to the
noted polymetallic intercepts in more recent drilling 12 , the project has also shown
itself to be highly prospective for precious, base metals and other commodities 13,
14
.
Work in the December quarter centered around interpretation of soil sampling and
previous drilling in addition to regulatory approval submissions for possible future drilling.
Messenger
The Messenger Project comprises five granted tenements located adjacent to the
world class EMR Golden Grove base and precious metal mine. The Messenger
Project has outcrops of the key Golden Grove Unit and is prospective for VMS
and shear / lode hosted gold mineralisation.
The ‘Messengers Patch’ is a well known historic mining centre hosting numerous
high-grade mines and a state battery (government built gold processing facility) in
the early 1900s.
TEM has previously shown the presence of mineralisation at the central part of
the project 15.
The project hosts multiple drill ready geophysical and geochemical targets.
During the December quarter, Tempest assessed the data from last quarter
mapping and continue to correlate geology to the current Meleya work.
Warriedar West
The Warriedar West Project is an exploration project targeting Intrusive Related
Gold (IRG) and orogenic gold mineralisation. Tempest has previously announced
large multi-kilometre scale indicator geochemical anomalies 16 within the
Warriedar Project. The discovery of gold at Warriedar West is within kilometres of
underutilised gold processing facilities with established haulage routes in place.
Previous drilling by Tempest focussed on several target areas of shallow,
outcropping zones of highly altered silica rich intrusive and previously mapped
large outcropping gold bearing quartz veins which discovered covered
greenstones 17 and also confirmed the widespread presence of shallow gold
within the silica rich lithocap accompanied by zones of quartz vein swarms with
grades of up to 5g/t 18 .
Work this quarter comprised assessing conceptual targets that arise from the new
geological framework and mineralisation along strike at Meleya.
Page 7 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Mount Magnet Region
Mt Magnet is a prolific multi-million ounce gold mining centre with numerous large scale, long life open pit and
underground mines currently in operation. It has been operated by major resources companies such as
Western Mining Corporation and Harmony Gold Ltd as well as more contemporary successful mid-tier
companies such as Ramelius Resources Ltd and Westgold Ltd.
Figure 08: Overview of Mt Magnet and the Range Project
Range
Located in the heart of the Mount Magnet mineral field and 5km along strike of the prolific +6Moz Mount
Magnet Operations, the Range Project consists of 17 tenements for 20km2.
Work completed during the quarter included assessing geological mapping completed last quarter and any
potential correlations to historic work or exploration targets this may generate.
Page 8 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Tolu Investment (PNG)
Tolu Minerals Ltd (Tolu) (formerly called Lole Mining Ltd) lodged a prospectus with ASIC on 30 December
2022 and is seeking to raise between $10 million and $15 million at an issue price of $0.50. Tolu have
appointed Blue Ocean Equities and Martin Place Securities, both based in Sydney, as joint lead managers for
the IPO. Commencement of trading on ASX is expected at the end of February 2023. 19. Tolu are progressing
the Tolukuma Gold Mine and Mt Penck Projects in Papua New Guinea.
In late September 2022, TEM subscribed for 2,702,703 Shares at an issue price of A$0.37 for a total
investment of A$1 million.20 The investment assisted in the final stage of acquisition of the Tolukuma Gold
mine and brings exciting exposure to high grade pre-production projects into TEM’s portfolio.
Figure 09: Overview of Lole Mining Projects
Page 9 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Australian Lithium
Electra Minerals - Lithium Projects To Merge With New Nevada Acquisition and IPO
In November 202222 , TEM announced the intention to combine the underexplored hard rock lithium
exploration projects in Western Australia held by 100% subsidiary, West Resource Ventures Pty Ltd (West
Resources) with the Smith Creek lithium brine Property in Nevada USA and IPO, with West Resources being
renamed Electra Minerals Ltd.
The deal proposes to acquire Australian based Lithium of Nevada Pty Ltd (LON) which has a binding
agreement with TSX-V listed Iconic Minerals Ltd for the rights to acquire up to 50% of the Smith Creek Project
and raise approximately $3.5M as pre-IPO capital and then A$10M as part of an Australian Listed IPO to
progress the projects.
Discussions between the parties involved continues and planning and documentation are in progress. TEM
will provide further information for the market as soon as practicable in Q1 2023.
Rocky Hill
The Rocky Hill Project is 100% TEM owned tenure (29km2 granted tenure, 250km2 pending) located
approximately 100km from Perth within the exciting new exploration front known as the South West Terrane
and includes neighbours such as Newmont Corporation.
The project is primarily a lithium exploration target however and there is potential for other minerals including
gold, magnesium and high purity alumina (HPA).
TEM previously completed reconnaissance field mapping and surface sampling with multiple anomalous
geochemical zones including lithium grades in soil of more than 60 ppm and strong pathfinder element signals
23
.
Work this quarter was focussed on review of previous data and progressing tenement applications.
Page 10 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
YLP
The YLP consists of 2 pending tenements (2 pending) for a total of approximately 65
km2 in the Yilgarn craton of Western Australia.
Tempest has previously conducted a review of the projects and confirmed the
Company view that these are highly prospective for Lithium and other commodities.
Work this quarter was focussed on progressing tenement applications.
International Lithium Exposure
Tempest maintains a strong de-risked position in the global lithium market 24 which it has been developing
since 2017 25. Tempest’s interests are both in Australia through its portfolio of Western Australian exploration
projects as well as Internationally through holdings or interests in projects in Africa and the USA.
In addition to the Company’s Australian focussed assets, Tempest has strong
de-risked interests and exposure to the international Lithium which include hard rock
lithium exploration targets in Africa and lithium brine in the USA.
Africa
Through a divestment deal in 2020 26, Tempest retains a sizable holding (45 million
shares) in London listed Premier African Minerals (AIM:PREM). PREM have
significant market upside through development of their portfolio 27.
USA
Argosy (ASX:AGY) are progressing 28 their headline Tonopah Lithium Project (TLP)
located in a world class mining jurisdiction of Nevada, United States of America.
Tempest retains an interest 29 in the project through a A$250,000 milestone based
cash payment entitlement.
Page 11 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Corporate
Growth
Tempest continues to actively investigate and evaluate new growth opportunities in a number of jurisdictions
and commodities which may bring added value to Tempest shareholders.
March 2023 Quarter Exploration
Exploration activities are anticipated to recommence in mid to late Q1 after results of drilling and other
activities completed in 2022 are received and analysed. Exploration activities planned in 2023 include:
-
Further geochem sampling at Meleya
Progression of further drilling at Meleya
Progression of regulatory approvals to commence drilling at targets at the Euro Project
Potential drilling activities at the Range Project
Progression of all projects
ASX Additional Information
1. ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure (excluding staff costs) during the
Quarter was $1,262,011. Full details of exploration activity during the Quarter are set out in this report.
2. ASX Listing Rule 5.3.2: $95,000 was paid to related parties during the quarter comprising the
Managing Director’s salary and Non-Executive Director fees. $485,339 was paid to Galt Mining
Solutions Pty Ltd, a company controlled by directors Don Smith and Owen Burchell for technical
consulting services regarding the exploration programs undertaken by the Company and for provision
of office space and storage. Legal fees amounting to $63,458 was paid to Hopgood Ganim Lawyers, a
legal firm where director Brian Moller is a partner in their Brisbane office.
Page 12 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Appendix A: References
1.
2.
3.
4.
5.
6.
TEM ASX Announcement dated 02 March 2022 “Meleya Update - Expansion of granted tenure”
LI3 ASX Announcement dated 06 August 2020 “Enhanced Prospectivity at the Meleya Zone”
TEM ASX Announcement dated 18 November 2021 “EIS Funding Granted”
TEM ASX Announcement dated 28 March 2022 “Meleya Update - Significant Discovery”
TEM ASX Announcement dated 02 April 2022 “Meleya Update - Further Mineralisation”
TEM ASX Announcement dated 07 July 2022 “Meleya Update - DHEM Survey Compliments Initial
Assays Results At Orion”
7. TEM ASX Announcement dated 08 September 2022 “Meleya Update - Orion DHEM Survey And
Assays Confirm Project Potential”
8. TEM ASX Announcement dated 14 September 2022 “Regional Electron Paramagnetic Resonance
Survey Completed”
9. TEM ASX Announcement dated 11 October “Meleya Update - Master Drilling Completion”
10. TEM ASX Announcement dated 20 October “Meleya Update - Drilling At Clover Target”
11. TEM ASX Announcement dated 09 December “Meleya Update - Completion of drilling 2022”
12. TEM ASX Announcement dated 23 May 2022 “Euro Update - Encouraging Gold And Polymetallic
Results Confirm Potential”
13. TEM ASX Announcement dated 08 July 2021 “Iron rich formations at Euro”
14. TEM ASX Announcement dated 10 March 2022 “Euro Update - Lithium Potential Identified”
15. TEM ASX Announcement dated 26 May 2021 “Broad Gold Mineralisation Intercepted at Messenger”
16. TEM ASX Announcement dated 22 April 2020 “Warriedar Exploration Update – Large gold anomaly
identified”
17. TEM ASX Announcement dated 23 December 2020 “Greenstone belt and sulphide intersected in
drilling at Warriedar”
18. TEM ASX Announcement dated 21 December 2020 “Gold at OK Corral & 2020 Drilling Completion”
19. Tolu Minerals Website http://www.toluminerals.com/prospectus/
20. TEM ASX Announcement dated 02 September 2022 “Lole Transaction Update”
21. TEM ASX Announcement dated 13 May 2022 “Rocky Hill Update - Multiple geochemical anomalies in
initial fieldwork”
22. TEM ASX Announcement dated 17 November 2022 “WRV Demerger With Nevada Acquisition Electra IPO”
23. TEM ASX Announcement dated 12 May 2022 “Rocky Hill Update - Multiple Geochem Anomalies”
24. TEM ASX Announcement dated 03 November 2021 “Tempest Maintains Exposure To Global Lithium
Market”
25. Li3 Initial Public Offering Documentation and Company Presentation dated April 2017
26. Li3 Announcement dated 11 June 2020 “Li3 Enters Sale Agreement for Disposal of African Projects”
27. Premier Africa Minerals website https://www.premierafricanminerals.com/ (Accessed 29 January
2022)
28. Argosy Website https://www.argosyminerals.com.au/ (Accessed 29 January 2022)
29. Li3 Announcement dated 11 September 2020 “Argosy completes purchase of Tonopah Lithium
Project”
Page 13 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
Appendix B: Title Summary
Tempest provides the following addendum in relation to additional information required by Listing Rule 5.3.3.
Mining Title, Beneficial Interests and agreements held as at the end of the quarter:
Australia
License
Status
TEM Interest %
Notes
E 5902350
Granted
100
-
E 5902381
Granted
100
-
M 5900495
Granted
50
JV with Michele Conti
P 5902276
Granted
100
-
E 5902507
Granted
100
-
E 5902689
Granted
100
-
E 5902224
Granted
100
-
E 5902308
Granted
100
-
E 5902374
Granted
100
-
E 5902375
Granted
100
-
E 5902465
Granted
100
-
E 5902479
Granted
100
-
E 5902319
Granted
100
-
E 5902410
Granted
100
-
E 5902418
Granted
100
-
E 5902419
Granted
100
-
E 5902498
Granted
100
-
E 5902785
Pending
100
Application during the quarter
E 5902786
Pending
100
Application during the quarter
Yalgoo Region
Mount Magnet Region
P 5801770
Granted
100
-
P 5801773
Granted
100
-
P 5801781
Granted
100
Page 14 | 15
ASX : Tempest
2022-01-30 | Quarterly Report December 2022
P 5801783
Granted
100
-
P 5801784
Granted
100
-
P 5801785
Granted
100
-
P 5801786
Granted
100
-
P 5801787
Granted
100
-
M 5800229
Granted
100
-
P 5801680
Granted
100
-
P 5801697
Granted
100
-
P 5801698
Granted
100
-
P 5801753
Granted
100
-
P 5801761
Granted
100
-
P 5801768
Granted
100
-
P 5801769
Granted
100
-
P 5801774
Granted
100
-
P 5801796
Granted
100
-
YLP (Yilgarn Lithium Project)
E 7005321
Granted
100
-
E 7006134
Pending
100
-
E 7702384
Pending
100
-
E 6301815
Pending
100
-
Page 15 | 15
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Tempest Minerals Limited
ABN
Quarter ended (“current quarter”)
32 612 008 358
31 December 2022
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (6
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs and board & senior
management fees
(95)
(226)
(e) administration and corporate costs
(166)
(318)
-
-
34
56
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other – due diligence costs
(18)
(51)
1.9
Net cash from / (used in) operating
activities
(245)
(539)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(1,262)
(1,697)
(e) investments
-
(1,000)
(f)
-
-
(d) exploration & evaluation including
applicable staff costs
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (6
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
179
179
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other – EIS grant
-
120
2.6
Net cash from / (used in) investing
activities
(1,083)
(2,398)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
(d) investments
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
9
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
9
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
6,290
7,890
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(245)
(539)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(1,083)
(2,398)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
9
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date (6
months)
$A’000
-
-
4,962
4,962
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,962
4,290
5.2
Call deposits
2,000
2,000
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
4,962
6,290
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
189
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
455
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(1,262)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,507)
8.4
Cash and cash equivalents at quarter end (item 4.6)
4,962
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
4,962
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.29
-
$A’000
(245)
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 January 2023
Authorised by: The Board of Directors
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Govern
Share your feedback
Discover