Half Year Accounts
Released
Released
Announcement PDF
ACN 612 008 358
CONSOLIDATED FINANCIAL REPORT
FOR THE HALF-YEAR ENDED
31 DECEMBER 2023
TEMPEST MINERALS LIMITED ACN 612 008 358
Phone: +61 8 9200 0435 Fax: +61 8 9380 6761 Address: Level 2, Suite 9 389 Oxford Street, Mount Hawthorn WA 6016
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Contents
Cautionary Statements ..................................................................................................................................................2
Corporate Information ...................................................................................................................................................3
Directors’ Report .............................................................................................................................................................4
Auditor's Independence Declaration ……………………………………………………………………………………… 19
Consolidated Statement of Profit or Loss and Other Comprehensive Income .....................................................20
Consolidated Statement of Financial Position ..........................................................................................................21
Consolidated Statement of Changes in Equity .........................................................................................................22
Consolidated Statement of Cash Flows .....................................................................................................................23
Notes to the Financial Statements ..............................................................................................................................24
Directors’ Declaration ..................................................................................................................................................29
Independent Auditor’s Review Report .......................................................................................................................30
Cautionary Statements
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based
on certain assumptions and involve known and unknown risks, uncertainties and other factors, many of which
are beyond the company’s control. Actual events or results may differ materially from the events or results
expected or implied in any forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or prediction with
respect to the accuracy of the underlying assumptions or that any forward-looking statements will be or are
likely to be fulfilled.
Tempest Minerals Limited undertakes no obligation to update any forward-looking statement to reflect events
or circumstances after the date of this document (subject to securities exchange disclosure requirements).
The information in this document does not take into account the objectives, financial situation or particular
needs of any person or organisation. Nothing contained in this document constitutes investment, legal, tax or
other advice.
Competent Person Statement
The scientific and technical information contained within this Report is based on, and fairly represents
information prepared by Mr Don Smith, a Competent Person who is a member of AusIMM and the Australian
Institute of Geoscientists (AIG).
Mr Smith is the Managing Director of the Company and has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resource and Ore Reserves”. Mr Smith consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears.
2|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Corporate Information
Directors and Company Secretary
Brian Moller (Non-executive Chairman)
Don Smith (Managing Director)
Andrew Haythorpe (Non-executive Director)
Owen Burchell (Non-executive Director)
Mr Paul Jurman (Company Secretary)
Head Office and Registered Office
Tempest Minerals Limited
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn, WA 6016
Tel: +61 8 9200 0435
www.tempestminerals.com
Auditor
HLB Mann Judd (WA Partnership)
Level 4, 130 Stirling Street
Perth WA 6000
Share Registry
Automic Pty Ltd
Level 5, 126 Philip Street
Sydney NSW 2000
Tel: 1300 288 664
www.automicgroup.com.au
Stock Exchange Listing
Australian Securities Exchange Ltd
ASX Code: TEM, TEMOA
Solicitor
HopgoodGanim Lawyers
Level 8, Waterfront Place
1 Eagle Street
Brisbane QLD 4000
3|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Directors’ Report
The directors submit their report on the consolidated entity (“Group”) consisting of Tempest Minerals Limited
(“Company”, “Tempest” or “TEM”) and the entities it controlled at the end of, and during, the half-year ended
31 December 2023.
Directors
The following persons were Directors of the Company at all times during and since the end of the financial
period:
Brian Moller
Don Smith
Andrew Haythorpe
Owen Burchell
Results
The Group’s operating loss for the financial period, after applicable income tax was $276,433 (2022: $304,142).
Review of Operations
During the period, the Company’s principal activity was mineral exploration and identification of new
exploration opportunities.
Projects
Yalgoo Region
Tempest’s flagship project is the Company’s holding in the Yalgoo region of Western Australia, totalling more
than 1,000km2 and located near high profile neighbours including: 29 Metals Ltd (ASX:29M) - Golden Grove
Copper, Zinc, Gold, Silver Mine; Spartan Resources Ltd (ASX:SPR) - Yalgoo Gold Project; Silverlake (ASX:SLK) Deflector and Rothsay Gold Mines, Capricorn Metals Ltd (ASX:CMM) Gold, EMU NL (ASX:EMU) - Gnows Nest
Gold Project; Tungsten Mining (ASX:TGN) - Mt Mulgine Project; Fenix (ASX:FEX) - Iron Ore Operations, and
Karara and Sino Iron ore operations and more.
Figure 1: Overview of TEM Yalgoo projects
Tempest has used data driven processes to identify poorly or unexplored areas of highly prospective
geology. This approach has had considerable success and includes the discovery of multiple instances of
new mineralisation.
4|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
The project contains different geological domains referred to by four different areas – namely: Messenger,
Meleya, Warriedar West and Euro - though much of these have considerable geological overlap.
Regional Geophysical Survey
Results from the regional electromagnetic (EM) survey were announced during the period. EM surveys are
extensively utilised in the industry for identifying mineralisation and the aim of this survey was delineating high
priority exploration targets including potential VMS (volcanogenic massive sulphide) style mineralisation as
seen at the nearby Golden Grove Mine Camp.
The survey included over 300 lines of 200m spacing for more than 2,000 kilometres of line survey measurements.
Figure 2: Schematic map of survey area and anomalies
Result
The survey was successful with high quality data generated across the entire project. The current reprocessed
data includes numerous zones of interest for exploration and several potential high priority drill targets.
Notably, among the zones detected, an appreciable EM anomaly exists directly coincident with the exciting
previously announced 4km long base metal ‘Remorse’ target.
5|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Project Areas
Messenger comprises five granted tenements located adjacent to the world class EMR Golden Grove base
and precious metal mine. The Messenger Project has outcrops of the key Golden Grove Unit and is
prospective for VMS and shear / lode hosted gold mineralisation. The ‘Messengers Patch’ is a well known
historic mining centre hosting numerous high-grade mines and a state battery (government built gold
processing facility) in the early 1900s. TEM has previously shown the presence of mineralisation at the central
part of the project and hosts multiple drill ready geophysical and geochemical targets.
Warriedar West is an exploration project targeting Intrusive Related Gold (IRG) and orogenic gold
mineralisation. Tempest has previously announced large multi-kilometre scale indicator geochemical
anomalies within the Warriedar Project. The discovery of gold at Warriedar West is within kilometres of
underutilised gold processing facilities with established haulage routes in place.
Previous drilling by Tempest focused on several target areas of shallow, outcropping zones of highly altered
silica rich intrusive and previously mapped large outcropping gold bearing quartz veins which discovered
covered greenstones and also confirmed the widespread presence of shallow gold within the silica rich
lithocap accompanied by high grade quartz vein swarms.
Meleya represents a previously unrecognised extension of the Yalgoo Greenstone belt identified through the
innovative use of data analysis. In 2021, TEM identified further easterly extensions to the belt. Tempest has for
some time considered the target zones at Meleya to represent one of the most exciting greenfields base and
precious metal upside exploration opportunities in the industry today. This view was strongly supported in 2022
by the discovery of multiple mineralisation occurrences at the Orion and Clover target areas.
Figure 3: Overview of current geochemical sampling completed at Remorse
6|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
The Remorse Target is on the eastern side of the Meleya zone in a zone of under or previous unexplored
ground.
Initial sampling at this target has highlighted a particularly copper-zinc zone which now defines the Remorse
target. Notably the copper and zinc anomalism appears as ‘layered’ with a predominance of copper to the
NorthEast and an increased and a more dispersed zinc halo to the SouthWest. This type of zonation is typically
seen within VMS deposits and is related to the preferential crystallisation of mineralisation relative to the
proximity of a local heat source and the metal concentration source.
TEM is planning and implementing further programs to further progress these exciting targets which will include
progressing regulatory approvals for potential drilling. As part of this process TEM has conducted a heritage
survey and several field programs.
Figure 4: Badimia People and TEM team in the field conducting heritage survey
In response to new tenement areas becoming available, extensional surface geochemistry programs were
launched to collect geochemistry data at a number of targets.
7|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Figure 5: Additional surface sampling completed during the period.
8|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Sanity Target
The Sanity Target sits in the eastern portion of the project area and is 2km south of the Remorse Target.
Geochemical surveys have delineated strong coherent zones for multiple elements with particular respect to
Gold, having soil peaks of up to 80ppb and individual rock chips within the same geology trends have returned
results of up to 7gpt gold and 0.2% copper and >60% Iron and are along strike from and likely part of a broader
mineralised system as the Barron Rothchild deposit. TEM plan to conduct further surface works and approvals
with the potential for drilling in calendar Q2 2024.
7gpt gold
Figure 6: Sanity Target surface sampling results (gold)
9|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Figure 7: Sanity Target surface sampling results (copper)
Figure 8: Sanity Target surface sampling results (zinc)
10 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Euro is part of the 100% Tempest owned tenements within the prospective Southern Yalgoo Greenstone Belt
located between the neighbouring Rothsay (Gold), Mt Mulgine (Tungsten/Gold) and the Karara (Iron/Gold)
Mines. The majority of the project area is underexplored / unexplored however the northern portion has thick
gold intercepts in legacy drilling that were never thoroughly assessed by previous explorers. Tempest drilled
multiple polymetallic intercepts in 2022 showing the area to be highly prospective for precious, base metals
and other commodities.
During the reporting period, TEM announced the presence of silver in rock chips at the Calais Target which
further extend the known mineralisation in the area. A substantial change to the project area also occurred
during the period with TEM and Karara Mining Ltd terminating discussions on the MOU regarding nearby
tenements and TEM applying for a large extension to the project area to the south-east.
Figure 9: TEM Euro Project Tenure Overview
11 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Mount Magnet
Mt Magnet is a prolific multi-million ounce gold mining centre with numerous large scale, long life open pit
and underground mines currently in operation. It has been operated by major resources companies such as
Western Mining Corporation and Harmony Gold Ltd as well as more contemporary successful mid-tier
companies such as Ramelius Resources Ltd and Westgold Ltd.
Figure 10: Overview of Mt Magnet and the Range Project
Range
Located in the heart of the Mount Magnet mineral field and 5km along strike of the prolific +6Moz Mount
Magnet Operations, the Range Project consists of 17 tenements for 20km2.
12 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Reconnaissance Mapping
A review and re-interpretation of the project based on new information resulted in a hypothesis that key
geology found in the mineralised zone of the Britannia Well pit and other mining centres in Mount Magnet
may continue in a newly recognised orientation. Field verification saw rock chip samples from multiple
outcrops yielding anomalous gold results. Highlights include:
●
●
●
●
●
Wrangler Target: 1gpt Gold. 170m along strike of the Brittania Well pit and a likely extension of the pit’s
mineralised zone. Found in heavily jointed smokey coloured tourmaline bearing, brecciated
Boogardie Formation chert and meta intrusives.
Cherokee Target: 0.5gpt Gold. New gold-bearing mineralisation zone, 1.5km along strike from the
Brittania Well Pit and a cluster of historic shafts and trenches. Heavily tourmalinised and brecciated
volcanics and felsic intrusive nearby outcropping interpreted Boogardie Formation.
Greenstone assemblage and felsic lithologies, many of which demonstrate strong brecciation and
tourmalinisation believed to be associated with gold mineralisation.
Extensive tourmalinisation across the project with 6 distal tourmaline-bearing samples containing
elevated gold and gold pathfinder elements (Sb and As).
Continuation of the key regional economic gold mineralisation hosting metasedimentary/ultramafic
volcanics that correspond to a feature present in magnetic geophysical datasets.
Britannia Pit
400,000t @2gpt
Wrangler Target
1gpt (rockchip)
Figure 11: Wrangler Target relative to existing Open Pit (TEM tenure in red)
13 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Five Wheels
In July, TEM announced the acquisition of the FiveWheels Project in Western Australia which is proximal (~36km)
to the high-profile world-class Rumble Resources Ltd (ASX:RTR) and the emerging Strickland Metals Ltd
(ASX:STR) zinc-lead-copper discoveries.
The Project is located in the Earaheedy Basin where key geology at the edge hosts the mineralisation and
potentially more widespread regionally.
Consideration for the FiveWheels Project was 4,561,828 ordinary fully paid shares in TEM and payment of
$36,000 cash as consideration for the purchase of 100% of the issued capital of Five Wheels Pty Ltd, which
owns the FiveWheels Project.
TEM commenced initial works at the project in October, which included project setup, initial reconnaissance
and geological mapping and sampling at selected areas.
Figure 12: Five Wheels Project Location
14 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Figure 13: Five Wheels Simplified Project Geology Map With RTR Project (original red - current blue)
15 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Elephant Project
TEM previously announced it had entered into a conditional non-binding term sheet to acquire the Elephant
Project.
The Elephant Project comprises 194km2 (135km2 granted - 59km2 application) of highly prospective exploration
leases. The location on the edge of a geological block with (the suture between the Yilgarn and AlbanyFraser) is a favourable location for major discoveries as evidenced by the presence of multiple world class
deposits in similar environments along this trend.
The project was pegged primarily due to a strong geophysical anomaly and coincident geochemical data
from nearby previous exploration. The large scale and nature of the anomaly bear similarities to other world
class deposits in the regions such as Tropicana of which Tropicana peak soil was 31pbb with 0-15m cover while
the Elephant Target is 5-10pbb with 100-150m of cover.
The acquisition was completed in January 2024, with TEM paying $36,000 cash and issuing 7,740,957 fully paid
ordinary TEM Shares to MAC3 (or its nominee) for 80% of Lusture Pty Ltd which holds the Elephant Project.
Elephant Project
Figure 14: Project Location within regional exploration context
16 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Tolu Investment (PNG)
Tolu Minerals Ltd (Tolu) successfully completed their Initial Public Offering (IPO) on the ASX on 9 November
2023. Tolu highlight assets are the Tolukuma Gold Mine and Mt Penck Projects in Papua New Guinea.
TEM previously subscribed for 2,702,703 Shares at an issue price of A$0.37 for a total investment of A$1 million
which assisted in the final stage of acquisition of the Tolukuma Gold mine and brings exciting exposure to high
grade pre-production projects into TEM’s portfolio.
Australian Lithium
Electra Minerals
Tempest is currently considering options to enable the company to unlock the value of its WA lithium projects.
Rocky Hill
The Rocky Hill Project is 100% TEM owned tenure, located approximately 100km from Perth within the exciting
new exploration front known as the South West Terrane and includes neighbours such as Newmont
Corporation.
The project is primarily a lithium exploration target however and there is potential for other minerals including
gold, magnesium and high purity alumina (HPA).
TEM previously completed reconnaissance field mapping and surface sampling with multiple anomalous
geochemical zones of lithium and pathfinder element signals.
A tenement (E7006134) was approved at the end of the reporting period.
YLP
The YLP consists of 2 pending tenements for a total of approximately 65 km2 in the
Yilgarn craton of Western Australia.
Tempest has previously conducted a review of the projects and confirmed the
Company view that these are highly prospective for Lithium and other commodities.
Work this quarter was focussed on progressing tenement applications.
International Lithium
In addition to the Company’s Australian focussed assets, Tempest has strong de-risked interests and exposure
to the international Lithium which include hard rock lithium exploration targets in Africa
and lithium brine in the USA.
Africa
Through a divestment deal in 2020, Tempest retains a sizable holding (25 million shares)
in London listed Premier African Minerals Ltd(AIM:PREM). PREM has significant market
upside through development of their portfolio.
USA
Argosy (ASX:AGY) is progressing its headline Tonopah Lithium Project (TLP) located in
a world class mining jurisdiction of Nevada, United States of America. Tempest retains
an interest in the project through a A$250,000 milestone based cash payment
entitlement.
17 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Subsequent Events
In January 2024, TEM confirmed the allotment of 7,740,957 ordinary fully paid shares (Shares) and payment of
$36,000 cash as consideration for the purchase of 80% of the issued capital of Lusture Pty Ltd, which owns the
Elephant Project.
Other than the matter noted above, there were no other material matters or circumstances that have arisen
since the end of the reporting date which significantly affected or may significantly affect the operations of
the Group, the results of those operations, or the state of affairs of the Group that required disclosure in this
financial report.
Auditor’s Independence Declaration
The auditor’s independence declaration under section 307C of the Corporations Act 2001 is included in this
financial report.
Signed in accordance with a resolution of the Board of Directors.
Don Smith
Managing Director
5 March 2024
Perth, WA
18 | P a g e
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the consolidated financial report of Tempest Minerals Limited for
the half-year ended 31 December 2023, I declare that to the best of my knowledge and belief, there
have been no contraventions of:
a)
the auditor independence requirements of the Corporations Act 2001 in relation to the review;
and
b)
any applicable code of professional conduct in relation to the review.
Perth, Western Australia
5 March 2024
L Di Giallonardo
Partner
19 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Consolidated Statement of Profit or Loss and Other Comprehensive Income
for the Half-Year Ended 31 December 2023
Note
Interest received
31 Dec 2023
31 Dec 2022
$
$
17,010
54,313
(341,453)
(291,343)
(2,610)
(3,549)
(130,000)
(130,000)
Exploration expenses expensed as incurred
(4,076)
(13,761)
Foreign exchange gain/(loss)
(5,183)
4,360
Legal expenses
(50,016)
(145,938)
239,895
221,776
(276,433)
(304,142)
-
-
(276,433)
(304,142)
-
-
(276,433)
(304,142)
(276,352)
(304,084)
(81)
(58)
(276,433)
(304,142)
(276,352)
(304,084)
(81)
(58)
(276,433)
(304,142)
Loss per share attributable to owners of the parent company
Cents
Cents
Basic and diluted loss per share
(0.05)
(0.06)
Corporate and administrative expenses
2
Depreciation
Employee benefits expense
Fair value gain on financial assets at FVTPL
2
11
Loss before income tax expense
Income tax expense
Loss for the period
Other comprehensive income
Other comprehensive income for the period net of tax
Total comprehensive loss for the period
Loss for the period attributable to:
Owners of the parent company
Non-controlling interests
Total comprehensive loss for the period attributable to:
Owners of the parent company
Non-controlling interests
The accompanying notes form part of these financial statements.
20 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Consolidated Statement of Financial Position
as at 31 December 2023
Note
31 Dec 2023
30 June 2023
$
$
CURRENT ASSETS
Cash and cash equivalents
1,500,284
2,644,501
Trade and other receivables
46,172
61,504
Prepayments
28,627
33,455
1,454,251
1,218,893
3,029,334
3,958,353
4,877
7,486
8,235,340
7,582,334
Total Non-Current Assets
8,240,217
7,589,820
TOTAL ASSETS
11,269,551
11,548,173
201,962
267,169
Total Current Liabilities
201,962
267,169
TOTAL LIABILITIES
201,962
267,169
11,067,589
11,281,004
23,457,990
23,394,972
494,205
494,205
(12,883,537)
(12,607,185)
11,068,658
11,281,992
(1,069)
(988)
11,067,589
11,281,004
Financial assets at fair value through profit or loss (FVTPL)
11
Total Current Assets
NON-CURRENT ASSETS
Plant and equipment
Exploration and evaluation assets
3
CURRENT LIABILITIES
Trade and other payables
4
NET ASSETS
EQUITY
Issued capital
9
Reserves
Accumulated losses
Equity attributable to owners of the parent company
Non-controlling interests
TOTAL EQUITY
The accompanying notes form part of these financial statements.
21 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Consolidated Statement of Changes in Equity
for the Half-Year Ended 31 December 2023
Attributable to Owners of Parent Company
Note
Balance at 1 July 2022
Issued Capital
Accumulated
Losses
Share-Based
Payments
Reserve
Total
Noncontrolling
Interests
Total Equity
$
$
$
$
$
$
23,341,683
(11,810,251)
766,605
12,298,037
(930)
12,297,107
Loss for the period
-
(304,084)
-
(304,084)
(58)
(304,142)
Other comprehensive income
-
-
-
-
-
-
Total comprehensive loss
-
(304,084)
-
(304,084)
(58)
(304,142)
Transfer of lapsed options
-
200,400
(200,400)
-
-
-
Balance at 31 December 2022
23,341,683
(11,913,935)
566,205
11,993,953
(988)
11,992,965
Balance at 1 July 2023
23,394,972
(12,607,185)
494,205
11,281,992
(988)
11,281,004
Loss for the period
-
(276,352)
-
(276,352)
(81)
(276,433)
Other comprehensive income
-
-
-
-
-
-
Total comprehensive loss
-
(276,352)
-
(276,352)
(81)
(276,433)
64,000
-
-
64,000
-
64,000
(982)
-
-
(982)
-
(982)
23,457,990
(12,883,537)
494,205
11,068,658
(1,069)
11,067,589
Issue of shares
9
Share issue costs
Balance at 31 December 2023
The accompanying notes form part of these financial statements.
22 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Consolidated Statement of Cash Flows
for the Half-Year Ended 31 December 2023
31 Dec 2023
31 Dec 2022
$
$
CASH FLOWS FROM OPERATING ACTIVITIES
Interest received
17,010
55,525
Payments to suppliers and employees
(572,851)
(561,105)
Net cash used in operating activities
(555,841)
(505,580)
Payments for exploration and evaluation assets
(551,394)
(1,690,762)
Payments for purchase of investments
(36,000)
(1,000,000)
Proceeds from sale of investments
-
179,054
Receipts from government funded drilling rebate
-
120,000
(587,394)
(2,391,708)
Share issue costs
(982)
(30,082)
Net cash used in financing activities
(982)
(30,082)
Net decrease in cash held
(1,144,217)
(2,927,370)
Cash at beginning of period
2,644,501
7,889,767
-
312
1,500,284
4,962,709
CASH FLOWS FROM INVESTING ACTIVITIES
Net cash used in investing activities
CASH FLOWS FROM FINANCING ACTIVITIES
Foreign exchange movement on cash balances
Cash at End of Period
The accompanying notes form part of these financial statements.
23 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2023
Notes to the Financial Statements
for the Half -Year Ended 31 December 2023
NOTE 1: SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
Basis of Preparation
These general purpose financial statements for the interim half-year reporting period ended 31 December
2023 have been prepared in accordance with the Corporations Act 2001 and Australian Accounting
Standard AASB 134 "Interim Financial Reporting". Compliance with AASB 134 ensures compliances with IAS 34
“Interim Financial Reporting”. The historical cost basis has been used, except for financial assets at fair value
and the valuation of share based payments. For the purpose of preparing the half-year financial report, the
half-year has been treated as a discrete reporting period.
This interim financial report does not include all notes of the type normally included in the Annual Report.
Accordingly, this report is to be read in conjunction with the Annual Report of Tempest Minerals Limited for the
year ended 30 June 2023, together with any public announcements made during the half-year.
Significant accounting judgments and key estimates
The preparation of half-year financial reports requires management to make judgments, estimates and
assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities,
income and expenses. Actual results may differ from these estimates.
In preparing this half-year report, the significant judgments made by management in applying the Group’s
accounting policies and the key sources of estimation uncertainty were the same as those that applied to the
Group when compiling its annual 30 June 2023 financial statements.
The same accounting policies and methods of computation have generally been followed in these half-year
financial statements as compared with the corresponding half-year financial statements and the most recent
annual financial statements except for the adoption of new and amended standards as set out below.
Going Concern
The financial statements have been prepared on a going concern basis which contemplates the continuity
of normal business activities and the realisation of assets and discharge of liabilities in the ordinary course of
business.
New and amended Standards and Interpretations applicable
In the half-year ended 31 December 2023, the Directors have reviewed all of the new and revised Standards
and Interpretations issued by the AASB that are relevant to its operations and effective for annual reporting
periods beginning on or after 1 July 2023.
It has been determined by the Directors that there is no impact, material or otherwise, of the new and revised
Standards and Interpretations on its business and, therefore, no change is necessary to the Group’s
accounting policies.
Standards and Interpretations on issue not yet effective
The Directors have also reviewed all of the new and revised Standards and Interpretations on issue not yet
effective for the half-year ended 31 December 2023. As a result of this review, the Directors have determine
Share your feedback
Discover