Half Year Accounts
Released
Released
Announcement PDF
ACN 612 008 358
CONSOLIDATED FINANCIAL REPORT
FOR THE HALF-YEAR ENDED
31 DECEMBER 2022
TEMPEST MINERALS LIMITED ACN 612 008 358
Phone: +61 8 9200 0435 Fax: +61 8 9380 6761 Address: Level 2, Suite 9 389 Oxford Street, Mount Hawthorn WA 6016
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Contents
Cautionary Statements ..................................................................................................................................................2
Corporate Information ...................................................................................................................................................3
Directors’ Report .............................................................................................................................................................4
Auditor's Independence Declaration ……………………………………………………………………………………… 12
Consolidated Statement of Profit or Loss and Other Comprehensive Income .....................................................13
Consolidated Statement of Financial Position ..........................................................................................................14
Consolidated Statement of Changes in Equity .........................................................................................................15
Consolidated Statement of Cash Flows .....................................................................................................................16
Notes to the Financial Statements ..............................................................................................................................17
Directors’ Declaration ..................................................................................................................................................23
Independent Auditor’s Review Report .......................................................................................................................24
Cautionary Statements
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based
on certain assumptions and involve known and unknown risks, uncertainties and other factors, many of which
are beyond the company’s control. Actual events or results may differ materially from the events or results
expected or implied in any forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or prediction with
respect to the accuracy of the underlying assumptions or that any forward-looking statements will be or are
likely to be fulfilled.
Tempest Minerals Limited undertakes no obligation to update any forward-looking statement to reflect events
or circumstances after the date of this document (subject to securities exchange disclosure requirements).
The information in this document does not take into account the objectives, financial situation or particular
needs of any person or organisation. Nothing contained in this document constitutes investment, legal, tax or
other advice.
Competent Person Statement
The scientific and technical information contained within this Report is based on, and fairly represents
information prepared by Mr Don Smith, a Competent Person who is a member of AusIMM and the Australian
Institute of Geoscientists (AIG).
Mr Smith is the Managing Director of the Company and has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resource and Ore Reserves”. Mr Smith consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears.
2|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Corporate Information
Directors and Company Secretary
Brian Moller (Non-executive Chairman)
Don Smith (Managing Director)
Andrew Haythorpe (Non-executive Director)
Owen Burchell (Non-executive Director)
Mr Paul Jurman (Company Secretary)
Head Office and Registered Office
Tempest Minerals Limited
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn, WA 6016
Tel: +61 8 9200 0435
www.tempestminerals.com
Auditor
HLB Mann Judd (WA Partnership)
Level 4, 130 Stirling Street
Perth WA 6000
Share Registry
Automic Pty Ltd
Level 5, 126 Philip Street
Sydney NSW 2000
Tel: 1300 288 664
www.automicgroup.com.au
Stock Exchange Listing
Australian Securities Exchange Ltd
ASX Code: TEM, TEMO, TEMOA
Solicitor
HopgoodGanim Lawyers
Level 8, Waterfront Place
1 Eagle Street
Brisbane QLD 4000
3|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Directors’ Report
The directors submit their report on the consolidated entity (“Group”) consisting of Tempest Minerals Limited
(“Company”, “Tempest” or “TEM”) and the entities it controlled at the end of, and during, the half-year ended
31 December 2022.
Directors
The following persons were Directors of the Company at all times during and since the end of the financial
period:
Brian Moller
Don Smith
Andrew Haythorpe
Owen Burchell
Results
The Group’s operating loss for the financial period, after applicable income tax was $304,142 (2021: $481,059).
Review of Operations
During the period, the Company’s principal activity was mineral exploration and identification of new
exploration opportunities.
Projects
Yalgoo Region
Tempest has 4 exciting project areas in the Yalgoo region of Western Australia totalling more than 900km2.
The projects are located within the prolific Yalgoo Greenstone Belt which hosts a number of world class mines.
Tempest has used data driven processes to identify poorly or unexplored areas of highly prospective geology
which includes multiple instances of proven mineralisation.
Figure 1: Overview of TEM Yalgoo projects
4|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Meleya
The Meleya Project is part of Tempest Minerals’ flagship Yalgoo Portfolio with a
combined tenure of 4 exploration leases extending over more than 600km2. Tempest
has for some time considered the target zones at Meleya to represent one of the
most exciting greenfields base and precious metal upside exploration opportunities
in the industry today.
In 2019, the TEM technical team noted discordant geophysical signatures which did
not correlate with existing geological maps of the region. In 2020/21, interpretations
based on extensive fieldwork, resulted in the identification of more than 50 km of
strike length of a previously unrecognised and unexplored segment of the Yalgoo
Greenstone Belt which currently hosts a number of world class mines. The first drilling
ever in the new mineralised region (state government co-funded) was conducted in
March 2022 for the purpose of establishing stratigraphic controls. WARDH 72 and 73
encountered multiple zones of visual mineralisation zones. This was followed by an
downhole electromagnetic (DHEM) survey on the two holes which noted the
presence of podiform sulphide mineralisation which was confirmed by assays
received. The project prospectivity was further enhanced by the identification of numerous targets via an
EPR (electron para-magnetic) survey conducted in 2022.
Tempest activities during the period were dominated by work at the Meleya Project including:
-
A large regional surface geochemistry sampling project commenced at the Ktulu target;
91 drillholes for 7,336 metres of drilling (diamond, reverse circulation and aircore) completed; and
Widespread alteration and minor sulphides were intersected in multiple locations.
Assay results from the diamond drilling at the Master and Clover Target are expected in Q1 of 2023.
Master Target
The Master Target is a magnetic high feature in the south of the Meleya Project with a blind surface expression
(thick overlying fluvial sediments). During the period, TEM completed a 1 diamond drill hole (WARDH74) for
427.1m. Drilling intersected 40m of cover and lateritic clay horizons underlain by repeating sequences of
greenstones sequestered by the emplacing intermediate intrusives. Intermittent minor sulphides were
intersected throughout the hole along with contained intermittent potassium-feldspar epidote and silica
flooding alteration.
Clover Target
The Clover Target is a magnetic low stratigraphic sequence 2.5km to the south east of the Orion target. TEM
consider this to likely represent a previously unrecognised geological sequence within the mineralised Meleya
Belt or potentially a strongly altered and ‘demagnetised’ zone such is typical of greenstone hosted
hydrothermal gold mineralisation in Western Australia.
Drilling (Diamond)
WARDH75 was drilled to 637.1m and was designed to intersect the western edge of the above-mentioned
multi-km low magnetism zone.
Geology encountered from 0-422m included a thick (~68m) laterite zone of weathered intrusives with
extensive highly sheared intermediate intrusives, highly altered and mineralised fine grained mafic to
ultramafic sequences and at least 3 mafic to ultramafic dyke generations with alteration including
silicification, calcite veins and trace sulphide species.
At 422m greenstones were encountered with significant silica and epidote overprinting until 569m downhole.
The base of the hole was dominated by dyke swarms and silica dominated skarn-like alteration and trace
sulphides (<0.1%).
5|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Drilling (RC)
An RC drilling program to test the lateral thickness and several geological structures and geochemical
anomalies adjacent the diamond hole at the Clover target was completed for a single section. 20 holes of
variable depth were completed. All holes encountered comparable geology to WARDH75 with laterite
underlain by felsic granitoids intersected by mafic intrusions and strong alteration throughout.
Regional Drilling
The regional drilling project aim was to collect shallow geochemical data to augment the existing surface
sampling and mapping surrounding the Orion target for further geological knowledge and assist with
delineating additional drill targets in the future.
Drilling was completed on nominal 500m x 500m spacing over an area of some 4km x 4km of the central
Meleya Belt and consisted of some 6,269 metres of aircore and reverse circulation drilling. This represents a
small fraction of the Meleya Project and phase 1 of a number of possible campaigns.
Subsequent to the end of the period, TEM reported the assay results received from the drilling mentioned
above. Assays from 6,346 metres of aircore and reverse circulation drilling have returned with the remaining
diamond drill program results expected during Q1 2023. The initial review of results shows highly anomalous
results for a number of critical metals including Nickel, Tungsten, Cobalt and Rare Earths Elements (REE).
Conclusions
Visibly altered domains correlate well with anomalous metal endowment. Unexpected high levels of nickel,
tungsten and rare earth elements in particular may relate to zones of potential VMS style mineralisation hosted
within the interpreted greenstone belt or potential Skarn style mineralisation.
The drill program has highlighted critical mineral mineralisation is concentrated along many major lithological
and structural contacts. In particular some of the highest grades of Copper, Zinc, Tungsten, Cobalt and REE
are positioned around the Clover target in the southern portion of the drill program. Furthermore, the northern
lines also showed notable grades of Nickel and REO (Rare Earth Element Oxide).
This program has vectored in on the prospectivity of the “Anaesthesia” target (Figure 2), coincidently this
target falls on a large bullseye aeromagnetic target. Initial data indicates that there is a relationship between
anomalous geochemical anomalies present around the Clover target increase proportionally to the density
of structures.
The Anaesthesia target is a point within the interpreted greenstone belt that has bifurcated, likely from intense
faulting and may provide an ideal host environment for major deposits. This same fault is aligned with some of
the broadest zones of copper and zinc on the eastern end of the Clover line while also appearing along strike
of the same interpreted stratigraphic horizon as the Orion and Clover Cu-Zn enhanced greenstones. The zone
also has been interjected by two east-west striking dykes and the large belt concordant mafic intrusion
interpreted to have influenced the intense alteration responsible for the highest tungsten grades.
This program has tested laterally and to base of regolith along high priority surface features (including Orion
and Clover). Results have indicated that the subsurface is similarly elevated and that further science and
technology is required to narrow down and further enhance prospective targets. To date all Meleya diamond
holes have been scanned using a Geotek Boxscan which “delivers consistent, non-subjective, automated
depth registered imagery, geochemistry, mineralogy, and structural parameters from one mobile core
scanning system”. Moreover, priority reverse circulation and aircore hole box scanning will be fast tracked to
better understand the complex mineralised alteration encountered across the recent program, applying this
data to the wider area will ensure targets are ranked to their utmost potential.
6|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Figure 02: Meleya Project Drilling Program Overview
Euro
The Euro Project comprises four (4) 100% Tempest owned tenements (more than
176km2) within the prospective Southern Yalgoo Greenstone Belt located between
the neighbouring Rothsay (Gold), Mt Mulgine (Tungsten/Gold) and the Karara
(Iron/Gold) Mines. The project has thick gold intercepts in legacy drilling, however
due to depressed metal prices at the time were never thoroughly assessed by
previous owners. While most of the greater Euro Project remains unexplored or
unexplored, significant gold mineralisation has been recorded previously in the north
of the project but not thoroughly tested for continuity. In addition to the noted
polymetallic intercepts in more recent drilling 12 , the project has also shown itself to
be highly prospective for precious, base metals and other commodities.
Work during the period centred around interpretation of soil sampling and previous
drilling in addition to regulatory approval submissions for possible future drilling.
7|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Messenger
The Messenger Project comprises five granted tenements located adjacent
to the world class EMR Golden Grove base and precious metal mine. The
Messenger Project has outcrops of the key Golden Grove Unit and is
prospective for VMS and shear / lode hosted gold mineralisation.
The ‘Messengers Patch’ is a well-known historic mining centre hosting
numerous high-grade mines and a state battery (government built gold
processing facility) in the early 1900s.
TEM has previously shown the presence of mineralisation at the central part
of the project and believes the project hosts multiple drill ready geophysical
and geochemical targets.
During the period, TEM assessed data from previous mapping campaigns
and continue to correlate geology to the current Meleya work.
Warriedar West
The Warriedar West Project is an exploration project targeting Intrusive
Related Gold (IRG) and orogenic gold mineralisation. TEM has previously
announced large multi-kilometre scale indicator geochemical anomalies.
The discovery of gold at Warriedar West is within kilometres of underutilised
gold processing facilities with established haulage routes in place.
Previous drilling focussed on several target areas of shallow, outcropping
zones of highly altered silica rich intrusive and previously mapped large
outcropping gold bearing quartz veins which discovered covered
greenstones and also confirmed the widespread presence of shallow gold
within the silica rich lithocap accompanied by zones of quartz vein swarms
with grades of up to 5g/t.
Work during the period comprised assessing conceptual targets that arise
from the new geological framework and mineralisation along strike at
Meleya.
8|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Mount Magnet Region
Mt Magnet is a prolific multi-million ounce gold mining centre with numerous large scale, long life open pit
and underground mines currently in operation. It has been operated by major resources companies such as
Western Mining Corporation and Harmony Gold Ltd as well as more contemporary successful mid-tier
companies such as Ramelius Resources Ltd and Westgold Ltd.
Figure 3: Overview of Mt Magnet and the Range Project
Range
Located in the heart of the Mount Magnet mineral field and 5km along strike of the prolific +6Moz Mount
Magnet Operations, the Range Project consists of 17 tenements for 20km2.
Work completed during the period included geological mapping and assessing any potential correlations to
historic work or exploration targets this may generate.
9|Page
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Lithium
Tempest maintains a strong de-risked position in the global lithium market which it has been developing since
2017. Tempest’s interests are both in Australia through its portfolio of Western Australian exploration projects
as well as Internationally through holdings or interests in projects in Africa and the USA.
Electra Minerals - Lithium Projects To Merge With New Nevada Acquisition and IPO
In November 2022, TEM announced the intention to combine the underexplored hard rock lithium exploration
projects in Western Australia held by 100% subsidiary, West Resource Ventures Pty Ltd (West Resources) with
the Smith Creek lithium brine Property in Nevada USA and proceed with an Initial Public offering (IPO), with
West Resources being renamed Electra Minerals Ltd.
The deal proposes for West Resources to acquire Australian based Lithium of Nevada Pty Ltd (LON) which has
a binding agreement with TSX-V listed Iconic Minerals Ltd for the rights to acquire up to 50% of the Smith Creek
Project and raise approximately $3.5M as pre-IPO capital and then A$10M as part of an Australian Listed IPO
to progress the projects.
Discussions between the parties involved continues and planning and documentation are in progress. TEM will
provide further information for the market as soon as practicable in Q1 2023.
International Exposure
In addition to the Company’s Australian focussed assets, Tempest has strong de-risked interests and exposure
to the international lithium market which include hard rock lithium exploration targets
in Africa and the lithium brine lithium in the USA.
Africa
Through a divestment deal in 2020, Tempest retains a sizable holding (~40 million shares)
in London listed Premier African Minerals (AIM:PREM). PREM is enjoying a significant
premium to the deal price due to ongoing developments and potential upside in the
portfolio.
USA
In late 2019, the Company sold its 80% interest in the Tonopah Lithium Project in
Nevada, United States of America, to ASX listed Argosy Minerals Ltd (ASX:AGY).
Tempest retains exposure to the project through an agreed milestone payment of
$250,000 payable upon Argosy announcing a JORC compliant reserve at the project
of at least one million tonnes of lithium carbonate equivalent product or the
commencement of commercial production of lithium product at the Tonopah
Lithium Project.
Corporate
Tolu Investment (PNG)
In late September 2022, TEM subscribed for 2,702,703 Shares at an issue price of A$0.37 in Tolu Minerals Ltd
(Tolu) (formerly called Lole Mining Ltd) for a total investment of A$1 million. The investment assisted in the final
stage of acquisition of the Tolukuma Gold mine and brings exciting exposure to high grade pre-production
projects into TEM’s portfolio.
Tolu lodged a prospectus with ASIC on 30 December 2022 and is seeking to raise between $10 million and $15
million at an issue price of $0.50. Tolu has appointed Blue Ocean Equities and Martin Place Securities, both
based in Sydney, as joint lead managers for the IPO. Commencement of trading on ASX is expected in Q2
2023. Tolu is progressing the Tolukuma Gold Mine and Mt Penck Projects in Papua New Guinea.
10 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Subsequent Events
There were no material events subsequent to reporting date that required disclosure in this financial report.
Auditor’s Independence Declaration
The auditor’s independence declaration under section 307C of the Corporations Act 2001 is included in this
financial report.
Signed in accordance with a resolution of the Board of Directors.
Don Smith
Managing Director
15 March 2023
Perth, WA
11 | P a g e
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the consolidated financial report of Tempest Minerals Limited for
the half-year ended 31 December 2022, I declare that to the best of my knowledge and belief, there
have been no contraventions of:
a)
the auditor independence requirements of the Corporations Act 2001 in relation to the review;
and
b)
any applicable code of professional conduct in relation to the review.
Perth, Western Australia
15 March 2023
L Di Giallonardo
Partner
12 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Consolidated Statement of Profit or Loss and Other Comprehensive Income
for the Half-Year Ended 31 December 2022
Note
Interest received
31 Dec 2022
31 Dec 2021
$
$
54,313
4,004
(291,343)
(202,167)
(3,549)
(2,258)
(130,000)
(210,000)
(13,761)
-
4,360
2,809
(145,938)
(8,266)
221,776
(65,181)
(304,142)
(481,059)
-
-
(304,142)
(481,059)
-
-
(304,142)
(481,059)
(304,084)
(481,004)
(58)
(55)
(304,142)
(481,059)
(304,084)
(481,004)
(58)
(55)
(304,142)
(481,059)
Loss per share attributable to owners of the parent company
Cents
Cents
Basic and diluted loss per share
(0.06)
(0.15)
Corporate and administrative expenses
2
Depreciation
Employee benefits expense
2
Exploration expenses expensed as incurred
Foreign exchange gain/(loss)
Legal expenses
Fair value gain / (loss) on financial assets at FVTPL
11
Loss before income tax expense
Income tax expense
Loss for the period
Other comprehensive income
Other comprehensive income for the period net of tax
Total comprehensive loss for the period
Loss for the period attributable to:
Owners of the parent company
Non-controlling interests
Total comprehensive loss for the period attributable to:
Owners of the parent company
Non-controlling interests
The accompanying notes form part of these financial statements.
13 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Consolidated Statement of Financial Position
as at 31 December 2022
Note
31 Dec 2022
30 June 2022
$
$
CURRENT ASSETS
Cash and cash equivalents
4,962,709
7,889,767
Trade and other receivables
249,385
254,322
Prepayments
36,281
25,234
1,407,551
359,790
6,655,926
8,529,113
10,170
13,719
6,817,595
4,140,550
Total Non-Current Assets
6,827,765
4,154,269
TOTAL ASSETS
13,483,691
12,683,382
1,490,726
386,275
Total Current Liabilities
1,490,726
386,275
TOTAL LIABILITIES
1,490,726
386,275
NET ASSETS
11,992,965
12,297,107
23,341,683
23,341,683
566,205
766,605
(11,913,935)
(11,810,251)
11,993,953
12,298,037
(988)
(930)
11,992,965
12,297,107
Financial assets at fair value through profit or loss
11
Total Current Assets
NON-CURRENT ASSETS
Plant and equipment
Exploration and evaluation assets
3
CURRENT LIABILITIES
Trade and other payables
4
EQUITY
Issued capital
9
Reserves
Accumulated losses
Equity attributable to owners of the parent company
Non-controlling interests
TOTAL EQUITY
The accompanying notes form part of these financial statements.
14 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Consolidated Statement of Changes in Equity
for the Half-Year Ended 31 December 2022
Attributable to Owners of Parent Company
Note
Balance at 1 July 2021
Issued Capital
Accumulated
Losses
Share-Based
Payments
Reserve
Total
Noncontrolling
Interests
Total Equity
$
$
$
$
$
$
13,628,282
(10,856,734)
200,400
2,971,948
(875)
2,971,073
Loss for the period
-
(481,004)
-
(481,004)
(55)
(481,059)
Other comprehensive income
-
-
-
-
-
-
Total comprehensive loss
-
(481,004)
-
(481,004)
(55)
(481,059)
1,941,208
-
-
1,941,208
-
1,941,208
-
-
72,000
72,000
-
72,000
Balance at 31 December 2021
15,569,490
(11,337,738)
272,400
4,504,152
(930)
4,503,222
Balance at 1 July 2022
23,341,683
(11,810,251)
766,605
12,298,037
(930)
12,297,107
Loss for the period
-
(304,084)
-
(304,084)
(58)
(304,142)
Other comprehensive income
-
-
-
-
-
-
Total comprehensive loss
-
(304,084)
-
(304,084)
(58)
(304,142)
-
200,400
(200,400)
-
-
-
23,341,683
(11,913,935)
566,205
11,993,953
(988)
11,992,965
Issue of shares
9
Share-based payments expensed
Transfer of lapsed options
Balance at 31 December 2022
9
The accompanying notes form part of these financial statements.
15 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Consolidated Statement of Cash Flows
for the Half-Year Ended 31 December 2022
31 Dec 2022
31 Dec 2021
$
$
CASH FLOWS FROM OPERATING ACTIVITIES
Interest received
55,525
4,004
Payments to suppliers and employees
(561,105)
(458,987)
Net cash used in operating activities
(505,580)
(454,983)
(1,690,762)
(562,823)
-
(15,688)
(1,000,000)
-
Proceeds from sale of investments
179,054
-
Receipts from government funded drilling rebate
120,000
-
(2,391,708)
(578,511)
-
2,143,864
Share issue costs
(30,082)
(130,656)
Net cash (used in) / provided by financing activities
(30,082)
2,013,208
(2,927,370)
979,714
7,889,767
785,206
312
(317)
4,962,709
1,764,603
CASH FLOWS FROM INVESTING ACTIVITIES
Payments for exploration and evaluation assets
Purchase of property, plant and equipment
Payments for purchase of investments
Net cash used in investing activities
CASH FLOWS FROM FINANCING ACTIVITIES
Proceeds from the issue of shares
Net (decrease) / increase in cash held
Cash at beginning of period
Foreign exchange movement on cash balances
Cash at End of Period
The accompanying notes form part of these financial statements.
16 | P a g e
TEMPEST MINERALS LIMITED – ACN 612 008 358
INTERIM FINANCIAL REPORT 2022
Notes to the Financial Statements
for the Half -Year Ended 31 December 2022
NOTE 1: SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
Basis of Preparation
These general purpose financial statements for the interim half-year reporting period ended 31 December
2022 have been prepared in accordance with the Corporations Act 2001 and Australian Accounting
Standard AASB 134 "Interim Financial Reporting". Compliance with AASB 134 ensures compliances with IAS 34
“Interim Financial Reporting”. The historical cost basis has been used, except for financial assets at fair value
and the valuation of share based payments. For the purpose of preparing the half-year financial report, the
half-year has been treated as a discrete reporting period.
This interim financial report does not include all notes of the type normally included in the Annual Financial
Report. Accordingly, this report is to be read in conjunction with the Annual Report of Tempest Minerals Limited
(the "Company") for the year ended 30 June 2022, together with any public announcements made during
the half-year.
Significant accounting judgments and key estimates
The preparation of half-year financial reports requires management to make judgments, estimates and
assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities,
income and expenses. Actual results may differ from these estimates.
In preparing this half-year report, the significant judgments made by management in applying the Group’s
accounting policies and the key sources of estimation uncertainty were the same as those that applied to the
Group when compiling its annual 30 June 2022 financial statements.
The same accounting policies and methods of computation have generally been followed in these half-year
financial statements as compared with the corresponding half-year financial statements and the most recent
annual financial statements except for the adoption of new and amended standards as set out below.
Going Concern
The financial statements have been prepared on a going concern basis which contemplates the continuity
of normal business activities and the realisation of assets and discharge of liabilities in the ordinary course of
business.
For the half-year ended 31 December 2022 the Group generated a consolidated loss of $304,142 and incurred
operating cash outflows of $505,580. As at 31 December 2022 the Group has cash and cash equivalents of
$4,962,709 and net assets of $11,992,965.
The Group’s ability to continue to adopt the going concern assumption will depend upon the Group being
able to manage its liquidity requirement and by taking some or all of the following actions:
1.
raising additional capital;
2.
successful exploration and subsequent exploitation of the Group’s tenements;
3.
reducing its working capital expenditure; and
4.
disposing of non-core projects.
The directors have concluded that based on the Group’s ability to raise further capital (evidenced by the
previous successful capital raisings completed during prior periods) the directors have a reasonable
expectation that the Group will
Share your feedback
Discover