Full Year Statutory Accounts
Released
Released
Announcement PDF
ACN 612 008 358
CONSOLIDATED FINANCIAL REPORT
FOR THE YEAR ENDED
30 JUNE 2025
TEMPEST MINERALS LIMITED ACN 612 008 358
Phone: +61 8 9200 0435 Fax: +61 8 9380 6761 Address: Level 2, Suite 9 389 Oxford Street, Mount Hawthorn WA 6016
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Contents
Cautionary Statements
2
Corporate Information
3
Letter from the Chairman
4
Review of Operations
5
Directors’ Report
21
Auditor’s Independence Declaration
32
Consolidated Statement of Profit or Loss and Other Comprehensive Income for the
Year Ended 30 June 2025
33
Consolidated Statement of Financial Position as at 30 June 2025
34
Consolidated Statement of Changes In Equity for the Year Ended 30 June 2025
35
Consolidated Statement of Cash Flows for the Year Ended 30 June 2025
36
Notes to the Consolidated Financial Statements for the Year Ended 30 June 2025
37
Consolidated Entity Disclosure Statement
52
Directors’ Declaration
53
Independent Auditor’s Report
54
Shareholder Information
58
Interests in Tenements
60
Annual Mineral Resources and Ore Reserves Statement
62
Page 1
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Cautionary Statements
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions,
based on certain assumptions and involve known and unknown risks, uncertainties and other factors,
many of which are beyond the Company’s control. Actual events or results may differ materially from the
events or results expected or implied in any forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or prediction with
respect to the accuracy of the underlying assumptions or that any forward-looking statements will be or
are likely to be fulfilled.
Tempest Minerals Limited undertakes no obligation to update any forward-looking statement to reflect
events or circumstances after the date of this document (subject to securities exchange disclosure
requirements).
The information in this document does not take into account the objectives, financial situation or particular
needs of any person or organisation. Nothing contained in this document constitutes investment, legal,
tax or other advice.
Competent Person Statement
The information in this report that relates to Exploration Results is based on, and fairly represents information
compiled by Mr Don Smith, a Competent Person who is a member of AusIMM and the Australian Institute
of Geoscientists (AIG). Mr Smith is the Managing Director of the Company and has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Smith consents to the
inclusion in this report of the matters based on his information in the form and context in which it appears.
Information relating to Previous Disclosure
This report contains information extracted from previous ASX market announcements reported in
accordance with the 2012 JORC Code and is available for viewing at www.tempestminerals.com.
The information in this report that relates to exploration results and exploration targets as reported above
were last reported by the Company in compliance with the 2012 Edition of the JORC Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The Company confirms that it is
not aware of any new information or data that materially affects the information included in the market
announcements referred to above and further confirms that all material assumptions and technical
parameters underpinning the exploration results and exploration target contained in those market
releases continue to apply and have not materially changed.
Compliance Statement
The information in this operations report that relates to the Mineral Resource for the Remorse Project are
extracted from the ASX Announcement listed below which is available on the Company website at
www.tempestminerals.com and the ASX website ( ASX code: TEM):
Date
8 May 2025
Announcement
Inaugural JORC Mineral Resource - Remorse Project - Amended
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements and that all material assumptions and
technical parameters underpinning the estimates in the market announcements continue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market
announcement.
Page 2
TEMPEST MINERALS LIMITED - ACN 612 008 358
Corporate Information
Directors and Company Secretary
Brian Moller (Non-Executive Chairman)
Don Smith (Managing Director)
Andrew Haythorpe (Non-Executive Director)
Owen Burchell (Non-Executive Director)
Paul Jurman (Company Secretary)
Head Office and Registered Office
Tempest Minerals Limited
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn, WA 6016
Tel: +61 8 9200 0435
www.tempestminerals.com
Auditors
HLB Mann Judd
Level 4, 130 Stirling Street
Perth WA 6000
Share Registry
Automic Pty Ltd
Level 5, 126 Phillip Street
Sydney NSW 2000
Tel: 1300 288 664
www.automicgroup.com.au
Stock Exchange Listing
Australian Securities Exchange Ltd
ASX Code: TEM
Australian Company Number
612 008 358
Solicitor
HopgoodGanim Lawyers
Level 8, Waterfront Place
1 Eagle Street
Brisbane QLD 4000
Tel: +61 7 3024 0000
Fax: +61 7 3024 0300
www.hopgoodganim.com.au
Page 3
ANNUAL REPORT 2025
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Letter from the Chairman
Dear Shareholders
On behalf of the board of directors of Tempest Minerals Ltd (Tempest or the Company), I take
pleasure in presenting the Annual Report for 2025.
During the past year we have focussed on iron, gold and copper exploration in Western Australia.
At Yalgoo we have progressed our iron ore discovery at Remorse, with release of a mineral resource
estimate, positive metallurgical testing and continue to work with Green Steel & Iron Pty Ltd with a
view to progressing establishment of a green steel production facility in the region. A new iron target
at Halo has also been identified.
We are also progressing work on our highly prospective Range gold project at Mt Magnet and drilling
is set to begin.
We also continue to look at other opportunities, in the best interests of our shareholders.
I would like to extend my thanks to Mr Don Smith, the Company’s Managing Director, my fellow
directors and the management team for their ongoing efforts in progressing the Company’s projects
and look forward to being able to update all shareholders with the progress on exploration of our
projects over the course of the company year.
On behalf of the Board, I thank you for your continued support and look forward to bringing our
further news as our exploration efforts continue.
We also respectfully acknowledge the Traditional Custodians of the land in which we operate and
pay our respect to all the elders, past, present and emerging, who carry deep knowledge of these
lands. We commit to being open to receive this knowledge and incorporate it into the work we do.
We recognise their continuing connection to the land, waters and culture in the area in which we
operate.
Yours faithfully
Brian Moller
Chairman
Page 4
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Yalgoo
Tempest’s flagship project is the Company’s holding in the Yalgoo region of Western Australia. It totals
more than 1,000 km2 and is located near high-profile neighbours across multiple commodities,
including Base Metals (29 Metals Ltd—ASX:29M; Tungsten Mining NL —ASX:TGN), Gold (Spartan
Resources Ltd—ASX:SPR; Vault Minerals Ltd—ASX:VAU; Capricorn Metals Ltd—ASX:CMM), and Iron
(Fenix Resources Ltd—ASX:FEX; Karara Mining Limited and Sinosteel Midwest Group).
Figure 01: Yalgoo Projects Overview
Tempest has used data-driven processes to identify poorly or unexplored areas of highly prospective
geology. This approach has had considerable success and includes the discovery of multiple
instances of new mineralisation including the substantial Remorse magnetite deposit in 2024.
The project contains a number of different geological domains, though much of these have
considerable overlap. Within these domains, exploration targets continue to be identified through
ongoing exploration and data analysis and are being explored systematically according to
prioritisation based on geological and other criteria.
Remorse Iron Deposit
Drilling
In August 2024, after weather related delays, Tempest commenced earthworks at the Remorse
target followed by the first round of exploration drilling at Remorse in September. Work was
completed in November for a total of 4,005m of RC (reverse circulation) drilling. The drilling was
targeted at the substantial base metal prospect previously outlined, however, early drilling also
encountered multiple thick zones of magnetite iron including maximum sample grades of in excess
of 39% Iron.
Page 5
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Discovery
Upon completion of drilling, it was established that the concentration of magnetite iron is substantial
and multiple drillholes reported potentially economic intercepts.
Geologically, it also became evident that there are numerous layers of iron concentration over
approximately a 5km strike length with widely spaced drilling showing consistent mineralisation over
more than 2 kilometres.
WARDH00160 32m @ 30% Fe from 96m (including 7m @ 37% Fe).
WARDH00180 17m @ 34% Fe from 134m
WARDH00169 20m @ 32% Fe from 120m
and 11m @ 30% Fe from 182m
WARDH00166 7m @ 32% Fe from 96m
WARDH00171 8m @ 30% Fe from 130m
Figure 02: Section through iron mineralisation WARDH00169 and WARDH00163-165
Intercepts from lesser parallel magnetite units.
SITE_ID
FROM (m)
To (m)
Length (m)
Fe_%
WARDH00160
58
61
3
34.1
WARDH00163
85
87
2
30.0
WARDH00163
194
200
6
29.8
WARDH00164
24
27
3
30.3
WARDH00165
80
84
3
27.9
Page 6
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
SITE_ID
FROM (m)
To (m)
Length (m)
Fe_%
WARDH00166
81
85
4
29.5
WARDH00167
76
78
2
30.6
WARDH00172
198
200
2
32.1
WARDH00173
110
113
3
30.0
WARDH00178
117
123
6
30.5
WARDH00180
97
102
5
32.5
WARDH00180
105
108
2
30.9
Exploration Target
Following on from the multiple magnetite units (up to 6 mapped at the surface) being intersected
with up to 27m true thickness and composite grades in excess of 30% Iron with maximum grades of
up to 39% Iron, Tempest released an exploration target indicating the potential deposit size.
Due to:
a) the consistency of results encountered during drilling in terms of geometry, thickness and grade;
b) the very strong correlation of the modelling present prior to drilling;
c) the extensive outcrop on site which the drilling and model match exceptionally well and is
definable over multiple kilometres;
the confidence in the deposit is already above that often considered for an ‘Exploration Target’ and,
as such, considered conservative.
Table 01: Exploration Target Summary.
Tonnage Range
Fe Grade Range
Tonnes - Upper (mt)
Tonnes - Lower (mt)
%Fe - Upper
%Fe - Lower
110
50
32
30
Note: The potential quantity and grade of the Exploration Target is conceptual in nature and as such
there has been insufficient exploration drilling conducted to estimate a mineral resource. At this stage,
it is not guaranteed further exploration will result in the estimation of a mineral resource. The Exploration
Target has been prepared in accordance with the JORC Code (2012) and the Valmin Code (2015).
Resource Estimate
In May 2025, Tempest completed an inaugural mineral resource estimate for the Remorse
Deposit. The estimate comprises an Inferred category total of 63.5 Mt @ 30.6% Fe (JORC 2012) at a
28% Fe cutoff.
The estimate matches well with the previously released initial Exploration Target for Remorse which
was based on the entire known outcropping area of the deposit whereas the resource estimate was
constrained by areas drilled and conservative estimate parameters. Further drilling and different
cutoff grades provide substantial upside and will likely result in a substantial increase in the total
resource estimate for the deposit.
Page 7
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Figure 03: Remorse location, resource model and estimate.
Figure 04: Remorse Resource Estimation vs outcropping and identified mineralisation.
Page 8
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Figure 05: Remorse Resource Estimation Grade tonnage curve
Table 02: Grade tonnage curve data: Mt at selected cut-off grades
Cut-off Grade
Tonnes ≥ Cut-off
Average Grade ≥ Cut-off
Material Content
Fe%
Mt
Fe%
%
28
63.5
30.6
59.8
26
79.7
29.9
73.3
24
94.4
29.2
84.7
22
99.6
28.9
88.4
20
106.5
28.4
92.8
Metallurgy
In February 2025, Tempest announced the commencement of metallurgical testing for the
magnetite mineralisation at the Remorse Deposit. Over 5 tonnes of sample were collected, and a
total of 9 composite samples were generated and submitted for a variety of metallurgical laboratory
tests.
Page 9
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Final data was received and announced in June 2025 with outstanding results including a Davis Tube
Recovery of 70.1% Fe.
Table 03: Summary of DTR testwork for Fe% and significant contaminants. *
Composite
Al203
%
Si02
%
S% P%
1
68.79 0.12
3.82
0.08 0.031
2
68.88 0.19
3.55
High iron. Up to 0.9% Sulphur provides an exploration
0.86 0.015 vector for additional gold and base metal
mineralisation.
3
70.08 0.08
2.16
Outstanding iron result in the thickest and most central
0.10 0.009 part of the deposit.
4
68.95 0.05
3.22
0.25 0.007
P80 25μm
Fe %
Comment
High iron, low contaminants.
High iron, low contaminants.
Excellent iron result with very low contaminants.
5
69.17 0.04
3.54
0.02 0.009
6
65.71 0.01
7.39
0.11 0.080
7
69.42 0.05
2.71
0.21 0.008
8
63.00 0.60
Good iron result despite being distal, thin
10.24 0.10 0.070 mineralisation currently not considered for mining or
economic analyses.
9
63.91 0.07
9.20
Acceptable iron, moderate silica.
Excellent iron result with low contaminants.
Good iron result despite being distal, thin
0.55 0.048 mineralisation currently not considered for mining or
economic analyses.
*At the optimal P80 25μm grind size. Detailed DTR testwork results for all grind sizes and assayed
elements are included in the ASX announcement dated 16 June 2025 - Yalgoo Update - Further
Excellent Metallurgical Results From Remorse.
Page 10
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Figure 06: Plan view of Remorse Deposit with drill intercepts and metallurgical sampling locations
Figure 07: Long section of Remorse Deposit with drill intercepts and metallurgical sampling locations
Steel Developer MOU
In February 2025, Tempest signed a binding MOU with steel developer Green Steel and Iron Pty
Ltd. This established a collaboration framework between Tempest and Green Steel to explore
potential development opportunities and natural synergies for the Remorse deposit, with a focus on
producing high-grade magnetite concentrate for use in green steelmaking processes.
Page 11
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Development Potential
The outstanding geology, exploration target, resource estimate, metallurgy and commercial
agreement with a nascent steel developer in the region confirms the Company’s belief that the
Remorse Deposit has high potential to be rapidly developed into a low-cost, from surface, open pit
operation with major infrastructure including rail to port as well as multiple processing options
available within short haulage distance.
Remorse Base Metal Potential
Remorse sits nearby a number of historical gold, iron and base metal occurrences. Previous sampling
at the target (which defined the target) indicated a particularly coherent core of copperzinc. Notably, the copper and zinc anomalism appears as ‘layered’ with a predominance of copper
to the NorthEast and increased and a more dispersed zinc halo to the SouthWest.
The target also exhibits nickel, rare earth zones which are sometimes found within peripheral
alteration halos in some other large VMS systems.
This type of zonation is typically seen within VMS deposits and is related to the preferential
crystallisation of mineralisation relative to the proximity of a local heat source and the metal
concentration source.
Prior to the 2024 drilling, the Company completed an additional extension geochemical survey that
further enlarged and defined the target.
Surface geochemical sampling was also combined with advanced multi sensor array analysis which
showed matching geological features including alteration halos and a likely matching proxy for
temperature gradient of the mineralising system.
Page 12
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Although first-pass exploration drilling discovered a substantial iron deposit at Remorse has rightly
taken much of the focus in FY24-25, Tempest considers much of the base metal potential at the
project to be largely untested.
Additionally, (while highly anomalous copper was intercepted in several drillholes) the drilling results
received overall to date do not adequately explain the accumulated evidence of VMS-style base
metal geology - particularly the tenor of copper and zinc in the surface geochemistry.
Tempest will continue to assess the base metal potential in tandem with the development of the
Remorse Iron Deposit.
Figure 08: Remorse Copper/Zinc Anomaly
Page 13
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Figure 09: Remorse ASD Data (Copper Minerals - Top) (Alteration Minerals - Bottom)
Page 14
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Figure 10: Cross-Section through initial iron mineralisation WARDH160-162
Sanity
At the Sanity Prospect, Tempest undertook further geochemical sampling. The goal of the work was
to provide further enhanced definition of the previously identified gold anomaly to assist potential
drill designs. The sampling density was increased from 200m x 200m to 100m x 100m, significantly
improving the resolution of the geochemical data and highlighting a more coherent and continuous
gold anomaly and increase the confidence of a potential for a large-scale mineralised system.
Gold peaks of up to 294ppb further confirm the robustness of the anomaly where individual rock
chips from nearby mine workings (shafts) within the same geology trends have returned results of up
to 7g/t gold and 0.2% copper and >60% Iron as well as elevated nickel and other elements above
standard crustal levels.
Page 15
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Figure 11: Sanity Target, magnetics and surface sampling results - Gold
Mt Magnet
Mt Magnet Region
Mt Magnet is a premier multi-million-ounce gold mining centre with numerous large-scale, long-life
open pit and underground mines currently in operation. The region hosts major resources companies
such as Ramelius Resources Ltd and Westgold Ltd as well as considerable current exploration success
by companies such as Ordell Minerals Ltd.
Historically, like much of Western Australia, exploration in the Mt Magnet field has focussed primarily
on a narrow mineralisation model.
More recent geological understandings show the presence of other mineralisation types in the region
with examples such as the Quasar, the significant Eridanus and the developing Barimaia deposits.
Page 16
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Figure 12: Overview of Mt Magnet major tenement holdings
Range Project
Located in the heart of the Mount Magnet mineral field and 5km along strike of the prolific +6Moz
Mount Magnet Operations, the Range Project consists of 17 tenements covering 20km2.
Tempest has been exploring the Range project for some time, including analysing historical data,
leading to a number of exploration prospects being generated. Tempest previously discovered gold
and tourmaline-bearing felsic volcanics along strike from the adjacent Britannia Open Pit known as
the Wrangler Target.
Tempest anticipates drill testing Wrangler and other more recently identified high-priority drill targets
within calendar Q3 2025.
Figure 13: Wrangler Target relative to existing Open Pit (Tempest tenure in red)
Page 17
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Five Wheels
The Five Wheels Project is 266km2 of granted tenure in the Earaheedy region of Western Australia
proximal to the high-profile world-class Rumble Resources Ltd (ASX:RTR) discoveries. The project
remains largely under-explored (or unexplored for base metals) and shares similar geology to both
the nearby Rumble Resources Chinook deposit and the emerging Strickland Metals Ltd (ASX:STR)
zinc-lead-copper discoveries.
The Project is located in the Earaheedy Basin, where a major geological unconformity surrounding
the edge of the basin hosts the initial Rumble Resources discoveries. More recent exploration implies
that multiple key geological sequences are or have the potential to be mineralised, and the
prospectivity is more widespread than originally considered.
Figure 14: Five Wheels Project Overview
During FY 2024-25, Tempest completed reconnaissance geological mapping, surface geochemistry
sampling and worked closely with the various regional heritage partners.
Page 18
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Figure 15: Five Wheels Project historic target areas
Elephant
The Elephant Project comprises 194km2 (135km2 granted - 59km2 application) of highly prospective
exploration leases. The location on the edge of a geological block with (the suture between the
Yilgarn and Albany-Fraser) is a favourable location for major discoveries as evidenced by the
presence of multiple world class deposits in similar environments along this trend.
The project was pegged primarily due to a strong geophysical anomaly and coincident
geochemical data from nearby previous exploration. The large scale and nature of the anomaly
bear similarities to other world class deposits in the regions such as Tropicana of which Tropicana
peak soil was 31pbb with 0-15m cover while the Elephant Target is 5-10pbb with 100-150m of cover.
Figure 16: Elephant Project with geophysics and historic gold bearing drillhole
Page 19
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Review of Operations
Tolu Investment (PNG)
Tolu Minerals Ltd (Tolu) successfully completed their Initial Public Offering (IPO) on the ASX on 9
November 2023. Tolu highlight assets are the Tolukuma Gold Mine and Mt Penck Projects in Papua
New Guinea.
Tempest previously subscribed for 2,702,703 Shares at an issue price of A$0.37 for a total investment
of A$1 million which assisted in the final stage of acquisition of the Tolukuma Gold mine and brought
exciting exposure to high grade pre-production projects into Tempest’s portfolio.
During the period Tempest sold the balance of its Tolu shares for proceeds amounting to $639,108.
The sale of the profitable investment in Tolu provided further working capital to progress exploration
works at the Company’s existing projects including initial focus on the Remorse copper target in
Yalgoo.
Australian Lithium
During the period, Tempest relinquished all West Australian granted and pending lithium targeted
tenure applications as other projects have been prioritised for exploration and development.
African Lithium
Tempest previously entered into a sale agreement with African focussed multi-commodity explorer
Premier African Minerals Limited (AIM listed under the ticker PREM) to purchase the African projects.
Tempest retains exposure to the projects and Premier through this equity holding of 25,000,000 shares.
USA Lithium
The Company sold its 80% interest in the Tonopah Lithium Project in Nevada, United States of America,
to ASX listed Argosy Minerals Ltd (ASX: AGY) in 2020. Tempest retains exposure to the project through
an agreed milestone payment of $250,000 payable upon Argosy announcing a JORC compliant
reserve at the project of at least one million tonnes of lithium carbonate equivalent product or the
commencement of commercial production of lithium product at the Tonopah Lithium Project.
Corporate
Capital Raising
On 31 May 2024, the Company announced a non-renounceable entitlement offer to eligible
shareholders of one new fully paid ordinary share for every five shares held at an issue price of $0.008
per share, to raise approximately $830,602 (before costs). On 10 July 2024, after the close of the
entitlement offer and achieving a 23.36% take-up rate, the Company issued a total of 24,251,886
shares to raise a total of $194,015 (before costs). On 7 August 2024, the Company announced it
completed the placement of the Shortfall arising from the non-renounceable entitlement offer and
issued 79,573,471 shares raising a further $636,587. For managing the Shortfall, the facilitator as part
of its compensation, subscribed for 9,946,684 options exercisable at $0.016, expiring on or before 6
August 2026 at an issue price of $0.00001.
In May 2025, Tempest announced it had raised $400,000 (before costs) via a placement of 100 million
fully paid ordinary shares at an issue price of A$0.004 per share together with 25 million free attaching
options with an exercise price of $0.01 and expiry date of 31 May 2027.
In May 2025, Tempest announced a non-renounceable rights issue to Eligible Shareholders of one (1)
New Share for every two (2) Shares held at an issue price of $0.004 per New Share (together with freeattaching options exercisable at $0.01 on or before 31 May 2027 to be issued on the basis of one (1)
option for every four (4) New Shares issued) to raise approximately $1,469,061 (before costs)
(Entitlement Offer).
The Entitlement Offer was made by way of a prospectus prepared in accordance with section 713
of the Corporations Act 2001 (Cth) lodged with ASIC and ASX on 9 May 2025.
In June 2025, Tempest advised it accepted applications for a total of 143,273,067 New Shares and
35,818,318 New Options, amounting to $573,093. The resulting shortfall from the Entitlement Offer
was 223,992,131 New Shares and 55,998,035 New Options (Shortfall), which was successfully placed
later in June 2025 raising a further $895,968 (before costs).
Page 20
TEMPEST MINERALS LIMITED - ACN 612 008 358
ANNUAL REPORT 2025
Directors’ Report
The directors submit their report on the consolidated entity (“Group”) consisting of Tempest Minerals
Limited and the entities it controlled at the end of, and during, the financial year ended 30 June 2025.
Directors
The following persons were directors of Tempest Minerals Limited during the financial year and up to the
date of this report, unless otherwise stated:
Brian Moller
Don Smith
Andrew Haythorpe
Owen Burchell
Information on Directors
The board has a strong combination of technical, managerial and capital markets experience. Expertise
and experience include operating and mineral exploration. The names and qualifications of the current
directors are summarised as follows:
Brian Moller – Non-Executive Chairman LL.B (Hons)
Brian specialises in capital markets, mergers and acquisitions and corporate restructuring, and has acted
in numerous transactions and capital raisings in the industrial, resources and energy sectors. He was a
partner at the legal firm, HopgoodGanim until 30 June 2024 and lead the Corporate Advisory and
Governance practice and remains a consultant to the firm. Mr Moller acts for many publicly listed
companies in Australia and regularly advises boards of directors on corporate governance and related
issues.
Brian is a solicitor of the Supreme Court of Queensland and Solicitor and Barrister of the Supreme Court of
Western Australia.
During the past three years, Mr Moller has also served as a director of the following listed companies:
DGR Global Ltd* (since 2 October 2002)
Clara Resources Limited (appointed1 December 2006, resigned 8 March 2025)
Newpeak Metals Limited* (since 22 January 2003)
Platina Resources Ltd* (since 30 January 2007)
Mineral Commodities Limited* (since 23 December 2022)
Tolu Minerals Limited (admitted to the official list on ASX on 9 November 2023, appointed 24
February 2022, resigned 16 June 2024)
*denotes current directorship
Brian is a member of the Audit & Risk Management Committee.
Don Smith – Managing Director
Don is a geologist and entrepreneur with over 20 years in the mining industry. He has worked in operational,
development, exploration and consultant roles for junior through to multinational firms spanning over 10
countries and numerous commodities including base metals, precious metals and energy minerals.
Don has a Bachelor of Science from Newcastle University and a Master of Business Administration from the
Australian Institute of Business. Don is a member of the Australasian Institute of Mining and Metallurgy
(AusIMM), the Australian Institute of Geoscientists (AIG) and the Geological Society of Australia (GSA).
Don sits on the board of TSX-V listed International Prospe
Share your feedback
Discover