Range Update - Auger Sampling Commenced On Gold Targets
Released
Released
Announcement PDF
ASX : TEM
2025-09-25 | Range Update - Auger Sampling Commenced On Gold Targets
TEM | Range Update - Auger Sampling Commenced On Gold Targets
Key Points
●
●
●
Auger sampling program commenced
Sampling targeting further prospective targets
RC Drilling to commence before end of September 2025
Summary
Tempest Minerals Ltd (TEM) advises it has commenced a program of auger sampling at its 100%
owned Range Project to gather high priority subsurface geochemistry in the southern half of the
project area.
With the recent gold in rock chips at a number of prospects aligning with newly understood
geological prospectivity, the Company is progressing gold exploration in the area and further
definition of drill targets at the project.
This work is in addition to the planned ~1,500m reverse circulation drilling program, of which
preparation is nearing completion.
Figure 01: Range Project upcoming Auger (Yellow) and RC Drilling (Green)
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 4
ASX : TEM
2025-09-25 | Range Update - Auger Sampling Commenced On Gold Targets
Range Project
Background
The Range project is 20km2 of highly prospective ground sitting within the greater Mt Magnet region which is
a premier multi-million-ounce gold mining centre with numerous large-scale, long-life open pit and
underground mines currently in operation. The Range Project sits within 5km of major mining houses as well
as recent high profile exploration successes 1 2 3 4.
TEM has been exploring the Range project for some time, including analysing historical data leading to a
number of exploration prospects being generated 5. TEM previously discovered gold and tourmaline-bearing
felsic volcanics along strike from the adjacent Britannia Open Pit 6 known as the Wrangler Target, and this is
among the current high-priority drill targets being planned by TEM.
Recent fieldwork identified a number of gold exploration targets along a 7km strike length, which are being
progressed through mapping, geochemical sampling, mineralogical analyses and drill planning. The targets
are located in several different geological settings 7 .
Additionally, gold rock chips from the Cherokee Prospect yielded grades of up to 1gpt gold which has
increased the strike length of prospective mineralisation to approximately 1km 8 . This has opened the
possibility of further prospects along strike to the south as outlined in the recent geological reinterpretation.
Field Programs
Auger Sampling
TEM has a number of field programs planned at the Range Project for the remainder of 2025. The Company
has commenced a broad subsurface auger sampling testing the southern portion of the project (as shown in
Figure 01).
It is expected that this program will provide a stronger geological understanding in areas where surficial cover
do not allow direct outcrop observation and the resulting geochemistry will rapidly progress further drill target
generation and definition at the project.
RC Drilling
The reverse circulation drill program 9 is expected to commence in the coming days. This program is
primarily to drill test the Wrangler and several other possible mineralised target zones.
Next Steps
- Auger Sampling in southern portion of Range Project
- Earthworks in progress for drilling
- RC Drilling at Wrangler to commence in coming week
- Results anticipated in mid Q4
Page 2 | 4
ASX : TEM
2025-09-25 | Range Update - Auger Sampling Commenced On Gold Targets
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian-based mineral exploration company with a diversified portfolio of projects in Western
Australia, where its iron ore project is moving towards development in addition to exploring for precious, base and energy
metals. The Company has an experienced board and management team with a history of exploration, operational and corporate
success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to maximise
shareholder value through focused, data-driven, risk-weighted exploration and development of our assets.
Investor Information
investorhub.tempestminerals.com
TEM welcomes direct engagement and encourages shareholders and interested parties to visit the TEM Investor hub, which
provides additional background information, videos and a forum for stakeholders to communicate with each other and with the
company.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
Website
Instagram
LinkedIn
X Twitter
Youtube
Facebook
+61 892000435
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on certain
assumptions and involve known and unknown risks, uncertainties and other factors, many of which are beyond the company’s
control. Actual events or results may differ materially from the events or results expected or implied in any forward-looking
statement. The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to
the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be fulfilled. Tempest
undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date of this
document (subject to securities exchange disclosure requirements). The information in this document does not take into
account the objectives, financial situation or particular needs of any person or organisation. Nothing contained in this document
constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project comments is based on information
compiled by Don Smith who is the Managing Director to Tempest Minerals Ltd. Don is a Member of AusIMM, AIG and GSA and
has sufficient experience relevant to the style of mineralisation under consideration and to the activities undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Don consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results
information included in this report from previous Company announcements as referenced in the body of this announcement and
further confirms that all material assumptions underpinning the exploration results contained in those market releases continue
to apply and have not materially changed.
Page 3 | 4
ASX : TEM
2025-09-25 | Range Update - Auger Sampling Commenced On Gold Targets
Appendix A: References
1. Ramelius Resources Ltd Website (accessed 2025-07-16) ➢
2. Ordell Minerals Ltd Website (accessed 2025-07-16) ➢
3. RMS ASX Announcement dated 13 May 2024 “Eridanus Resource up 64%” ➢
4. ORD ASX Announcement dated 19 May 2025 “Aircore Drilling Expands Prospective Barimaia Intrusion
to +7km Strike” ➢
5. TEM ASX Announcement dated 22 July 2025 “Exploration Work Commences at Mt Magnet” ➢
6. TEM ASX Announcement dated 13 Nov 2023 “Mt Magnet - New Gold Bearing Structures At The Range
Project” ➢
7. Gneiss Results “Mapping Stratigraphy and gold Targets, Wrangler Project, Mount Magnet” July 2025
8. TEM ASX Announcement dated 10 September 2025 “Gold IN Rock Chips and Expanded Drilling” ➢
9. TEM ASX Announcement dated 04 August 2025 “Drilling Imminent Targeting Gold In Mt Magnet” ➢
Page 4 | 4
Share your feedback
Discover