Key Points
●
●
●
●
Remaining composite metallurgical test results received
Davis Tube Recoveries up to 70% Fe (in concentrate)
Results confirm future development potential
Exploration for gold, base metals and additional iron resources ongoing
Summary
Tempest Minerals Ltd (TEM) is pleased to update the market on the further metallurgical results received
from the Remorse Iron discovery in Western Australia. The Company has received the remaining (8) Davis
Tube Recovery (DTR) testing results in the initial metallurgical testwork campaign. The results include up to
70% Iron in concentrate (P80 25μm grind) and low impurity levels. This continues to solidify Remorse as an
exceptional iron ore development prospect.
Yalgoo Project
Background
Remorse is part of TEM’s
flagship Yalgoo Project in
Western Australia.
It totals
more than 1,000 km2 and is
located
near
high-profile
neighbours across multiple
commodities, including Base
Metals
(29
Metals
Ltd—ASX:29M; Tungsten Mining
NL —ASX:TGN), Gold (Spartan
Resources Ltd—ASX:SPR; Vault
Minerals
Ltd—ASX:VAU;
Capricorn
Metals
Ltd—ASX:CMM), and Iron (Fenix
Resources Ltd—ASX:FEX; Karara
Mining Ltd and Sinosteel
Midwest Group).
The Remorse Deposit, located
on the eastern side of the
Yalgoo Project, is a large
magnetite iron deposit discovered in 2024 1 while drilling the initial 21-hole 4,005m reverse circulation drilling
program targeting a VMS-style base metal target 2. Results intersected included high-grade magnetite zones
yielding high-grade iron (up to 39%) 3.
TEM has subsequently continued to develop the project, releasing an exploration target 4, an inaugural
inferred resource estimate 5 and steps such as signing of a memorandum of understanding with burgeoning
mid-west steel developer GreenSteel and Iron Pty Ltd 6 to commence work to assess potential processing
synergies between the two companies.
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse
Metallurgy
Sampling
TEM previously announced the commencement of metallurgical sampling 7 and the excellent results from
metallurgical Composite 01 8 at the Remorse deposit.
Approximately 5 tonnes of mineralisation samples were taken from site and delivered to Independent
Metallurgical Operations Pty Ltd (IMO) for various metallurgical analyses including Davis Tube Recovery.
A total of 9 composite samples were generated from a total of 6 drillholes that intercepted this mineralised
material; the sampling locations are shown in plan and section views in Figures 2 and 3 respectively.
Figure 02: Plan view of Remorse Deposit with drill intercepts and metallurgical sampling locations
Figure 03: Long section of Remorse Deposit with drill intercepts and metallurgical sampling locations
Page 2 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse
Procedure
The test work was designed by IMO and performed at the SGS Metallurgy laboratory in Welshpool, WA. A
representative flowsheet is shown in Figure 04.
Composites 01 - 09 (approximately 50 kg each) were generated by combining representative splits from
continuous 1m RC drill hole intervals. Each composite was stage crushed to minus 3.35 mm and
homogenised and split thrice, using a rotary splitter, into 1 kg representative head samples. For each
composite, a head sample was assayed by XRF Extended Iron Ore Suite, while other head samples underwent
grind size determinations.
Grind size determinations for composites 01 - 06 were P80 425, 250, 106, 75, 53, 38 and 25 μm, using a 1 kg
ball mill and sieve screens. Composite sample 7 had 5 grind size determinations (P80 25, 38, 53, 75, 106μm)
and composites 08 & 09 P80 25 μm, also using a 1 kg ball mill and sieve screens.
One standard Davis Tube Recovery (DTR) test was performed at each grind size, for each composite, totalling
49 DTR tests. All DTR products (mags and non-mags) were dried, weighed and assayed by XRF Extended Iron
Ore Suite.
Figure 04: Metallurgical Testing Workflow
Page 3 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse
Results
TEM considers the results of the metallurgical testwork to be extremely robust with a majority of DTR
recovery numbers at P80 25μm to be above 68% Fe and one sample being above 70%. Overall, the sampling
also contains very low levels of contaminants. These results confirm the veracity of the Remorse Deposit for
further study and progression towards further potential development.
Table 01: Summary of DTR testwork for Fe% and significant contaminants.*
Composite
P80 25μm
Fe %
Al203 %
Si02 %
S%
P%
1
68.79
0.12
3.82
0.08
0.031
2
68.88
0.19
3.55
0.86
0.015
3
70.08
0.08
2.16
0.10
0.009
4
68.95
0.05
3.22
0.25
0.007
Comment
High iron, low contaminants.
High iron. Up to 0.9% Sulphur provides
an exploration vector for additional gold
and base metal mineralisation.
Outstanding iron result in the thickest
and most central part of the deposit
High iron, low contaminants
Excellent iron result with very low
contaminants
5
69.17
0.04
3.54
0.02
0.009
6
65.71
0.01
7.39
0.11
0.080
7
69.42
0.05
2.71
0.21
0.008
8
63.00
0.60
10.24
0.10
0.070
Good iron result despite being distal, thin
mineralisation currently not considered
for mining or economic analyses
0.048
Good iron result despite being distal, thin
mineralisation currently not considered
for mining or economic analyses
Acceptable iron, moderate silica.
9
63.91
0.07
9.20
0.55
Excellent iron result with low
contaminants
*At the optimal P80 25μm grind size. Detailed DTR testwork results for all grind sizes and assayed elements are presented in Appendix E.
Next Steps
-
-
-
-
Further internal studies regarding potential future development
Infill drilling being considered
Extensional drill planning in progress
Exploration at the Companies gold exploration projects continuing
Page 4 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian based mineral exploration company with a diversified portfolio of projects in
Western Australia considered highly prospective for precious, base and energy metals. The Company has an
experienced board and management team with a history of exploration, operational and corporate success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to
maximise shareholder value through focussed, data-driven, risk-weighted exploration and development of our
assets.
Investor Information
investorhub.tempestminerals.com
TEM welcomes direct engagement and encourages shareholders and interested parties to visit the TEM
Investor hub which provides additional background information, videos and a forum for stakeholders to
communicate with each other and with the company.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
Website
Instagram
LinkedIn
Twitter
Youtube
Facebook
+61 892000435
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on certain assumptions
and involve known and unknown risks, uncertainties and other factors, many of which are beyond the company’s control. Actual events
or results may differ materially from the events or results expected or implied in any forward-looking statement. The inclusion of such
statements should not be regarded as a representation, warranty or prediction with respect to the accuracy of the underlying
assumptions or that any forward-looking statements will be or are likely to be fulfilled. Tempest undertakes no obligation to update any
forward-looking statement to reflect events or circumstances after the date of this document (subject to securities exchange disclosure
requirements). The information in this document does not take into account the objectives, financial situation or particular needs of any
person or organisation. Nothing contained in this document constitutes investment, legal, tax or other advice.
Competent Persons’ Statement
The information in this announcement that relates to Exploration Results and general project comments is based on information
compiled by Jirka Just who is Geology Manager to Tempest Minerals Ltd. Jirka is a Member of AIG and has sufficient experience
relevant to the style of mineralisation under consideration and to the activities undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Jirka consents
to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to metallurgy and metallurgical test work has been reviewed by Dr Andrew Dowling.
Dr Dowling is not an employee of Tempest Minerals Ltd but is employed by Independent Metallurgical Operations (IMO) who are
providing services as a consultant. Dr Dowling is a Fellow of the AusIMM (FAusIMM) and has sufficient experience with the style of
processing response and type of deposit under consideration, and to the activities undertaken, to qualify as a competent person as
defined in the 2012 edition of the “Australian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves” (The
JORC Code). Dr Dowling consents to the inclusion in this report of the contained technical information in the form and context as it
appears.
Page 5 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse
The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results
and Mineral Resources information included in this report from previous Company announcements as referenced in the
body of this announcement and at Appendix A. The Company further confirms in the case of estimates of mineral
resources that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcements continue to apply and have not materially changed.
Page 6 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse
Appendix A: References
1. TEM ASX Announcement dated 24 October 2024 “Yalgoo Update - High-Grade Iron Intercepted In
Early Drilling At Remorse” ➢
2. TEM ASX Announcement dated 21 November 2024 “Yalgoo Update - Further Excellent Iron Results” ➢
3. TEM ASX Announcement dated 19 August 2024 “Remorse Sampling Indicates Further
Prospectivity”➢
4. TEM ASX Announcement dated 03 December 2024 “High-Grade Magnetite Deposit Emerging at
Remorse” <Amended 16 January 2025 > ➢
5. TEM ASX Announcement dated 08 May 2025 “Yalgoo - Remorse Positioned For Rapid Development
With Inaugural Resource - Amended” ➢
6. TEM ASX Announcement dated 07 February 2025 “MOU signed with WA Developer Green Steel and
Iron” ➢
7. TEM ASX Announcement dated 13 February 2025 “Remorse Metallurgical Testing Commences” ➢
8. TEM ASX Announcement dated 12 May 2025 “Excellent First Remorse Metallurgy Result” <Amended
15 May 2025> ➢
Page 7 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse | JORC TABLE 1
Appendix B: JORC Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
●
●
●
●
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Commentary
Metallurgical Sampling Techniques
●
●
●
●
The complete, intact, ‘green bag’ 1m bulk-reject RC samples were collected from the drill-site to be
used for the metallurgical test work, i.e. all available sample was collected.
Sample Preparation of Master Composites 1 - 9
For each Master Composite, dry material from continuous 1m RC drill hole intervals were each
homogenised and representatively split to produce sub-samples, which were combined to generate each
composite; each weighing 50.0 kg. Each composite was stage crushed to P100 3.35 mm using a
crusher, then mixed (x3) using a rotary sample divider and split into 1 kg charges for further testwork.
The continuous 1m RC drill hole intervals for each composite are presented in Appendix D, below.
Grind Establishment Analysis
A 1 kg sub-sample of each Master Composite was wet ground using 19 stainless steel (SS) rods in a
laboratory SS rod mill 250 mm diameter at 50% solids w/w in Perth tap water for different time intervals.
The mill products for composites 1 - 6 were sieved at 25, 38, 53, 75, 106, 250, and 425 micron using
mesh sieve screens and the results were plotted to interpolate the grind time necessary to achieve 80%
passing at the target grind size. Composite 7 (due to low volume) was sieved at 25, 38, 53, 75, 90 micron
using mesh sieve screens and the results were plotted to interpolate the grind time necessary to achieve
80% passing at the target grind size. Composites 8 and 9 were only sieved at 25 micron using mesh
sieve screens and the results were also plotted to interpolate the grind time necessary to achieve 80%
passing at the target grind size.
Davis Tube Wash (DTW)
A 20 g sub-sample at the target grind size was subjected to a Davis Tube test under the conditions
presented in the Table below. The standard DTW procedure is as follows:
1. The composite sample was stage ground to the required P80 size and a representative 20 g
samples split out;
Page 8 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse | JORC TABLE 1
Criteria
JORC Code explanation
Commentary
2. Davis tube stroke frequency, stroke length, magnetic field strength, tube angle and water flow
rate adjusted;
3. After setup complete a 20 g sample is added to the glass tube and timer set for 15 minutes;
4. The non-magnetic sample is collected in a bucket and once the timer has expired the mag
sample is collected continuously in a separate bucket;
5. Both magnetic and non-magnetic samples dried at 70°C.
●
Davis Tube Operating Conditions
Test Condition
Setpoint
Units
Stroke Frequency
60
/min
Stroke Length
38
mm
Magnetic Field Strength
3 000
Gauss
Tube Angle
45
Degrees
Water Flow
540
mL/min
Washing Duration
10
min
Feed Weight
20
g
Drying Temperature
70
o
C
RC Drilling Sampling Techniques:
●
●
●
No drilling is reported in this announcement.
Industry standard sample preparation and analysis methods were used.
Each 1 m sample was split directly off the cyclone using a rig-mounted, conical, dual shoot splitter to
deliver a 2-3 kg primary split sample into a numbered calico bag with the bulk reject passed into a
green plastic RC bag and stored at the drill site.
Page 9 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse | JORC TABLE 1
Criteria
JORC Code explanation
Commentary
●
●
●
●
●
●
●
●
Drilling
techniques
Drill sample
recovery
Sieved fines (unwashed) of each metre drilled were collected separately for first-pass geochemical
analysis on BoxscanTM (Geotek Limited) which includes a mounted portable X-ray Fluorescence (XRF)
spectroscopy which acquires elemental abundance from the surface of the material analysed.
To ensure the quality of the RC samples collected, every effort was made to drill all samples dry.
Water incursion is noted in the drill logs. The sampling system, rods and cyclone were cleaned at least
after every rod (6 m).
Drilling was completed dry using dust suppression without any water injection.
Metre delineation was controlled by means of visual marks on the mast chain on rig. The metre marks
were checked for accuracy at the start of the drilling deposit.
Sample intervals which returned iron grade (>10%) from the BoxscanTM were submitted for laboratory
analysis.
The sampling methodology is industry standard and considered both representative and appropriate.
Independent certified assay laboratories were used for analysis. Samples were analysed at Intertek
Genalysis Laboratory in Perth where samples were dried, crushed and pulverised (90% passing 75
microns). A 100 g sample was retained from the pulverised sample for a four-acid (complete) digest
and analysed by Induced Couple Plasma Mass Spectroscopy (ICP-MS) for 48 elements including iron
(Fe), alumina (Al2O3), titanium dioxide (TiO2), sulphur (S) and phosphorus (P).
●
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method,
etc).
●
●
No drilling is reported in this announcement.
RC drilling was conducted using a track-mounted Hydco 1000H rig with an onboard 1150CFM/351psi
air compressor and a similarly rated external compressor /booster combined delivered 2400CFM/
900psi to the bit face through 6 m rods (41⁄2 inch diameter) and a face sampling percussion hammer (5
to 53/4 inch diameter).
●
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
●
Recoveries from each metre of drilling were not measured, but visual inspection and monitoring of
samples in the field indicated that recoveries were high, visually consistent, and any variations were
recorded. The drill string was monitored to minimise dust, and metre delineation was kept in check by
monitoring marks on the chain. No material bias is expected in grade or recovery between the
preferential loss/gain of fine/coarse media.
●
●
Page 10 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse | JORC TABLE 1
Criteria
Logging
JORC Code explanation
●
●
●
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
Commentary
●
●
●
●
●
●
Sub-samplin
g techniques
and sample
preparation
●
●
●
●
●
●
If core, whether cut or sawn and whether quarter, half
or all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including
for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
●
●
No new logging is reported in this announcement.
All drill hole data including geological logging was captured in GRID data acquisition software in real time
on logging laptop or field phones and sent to the company SQL database. Data collected included:
metadata, location data, downhole surveys, lithology, mineralogy, structures, groundwater information and
photography.
The logging process enables a thorough understanding of the geological features present in the drill holes
This information is critical for making informed decisions regarding exploration, resource estimation,
mining and metallurgical studies.
100% logging coverage ensures a thorough dataset, supporting accurate and reliable assessments in
subsequent studies.
Reverse circulation chip samples were sieved and placed into chip trays and are logged to a degree that
facilitates robust resource estimation and comprehensive study.
Drill holes were logged to a level of detail to support this Mineral Resource Estimation. Any
inconsistencies in logging or log availability is reflected in the Mineral Resource classification.
The IMO Senior Metallurgist selected all the relevant RC 1m bulk-reject samples to be compiled to
create representative composite samples for the purpose of orebody characterisation.
The IMO Senior Metallurgist assessed the RC 1m bulk-reject samples for suitability for metallurgical
test work.
Assays related to Metallurgical testwork
●
●
Analytes: Al2O3, As, Ba, CaO, Cl, Co, Cr2O3, Cu, Fe, K2O, MgO, Mn, Na2O, Ni, P, Pb, S, SiO2, Sn, Sr, TiO2,
V, Zn , Zr, LOI (LOI determined by Thermo Gravimetric Analyzer (TGA) at 1000oC)
Method: Determination of Elements in Iron Ore by Borate Fusion with XRF instrument finish - extended
suite. The sample is fused in a platinum crucible using lithium metaborate / tetraborate flux and the
resultant glass bead is irradiated with X Rays and the elements of interest quantified.
Assays related to RC Drilling
●
●
●
●
No new drilling or new drill results are reported in this announcement.
A rig-mounted, conical splitter was used for all drill samples delivered from the rig.
Composited-samples for analysis were collected where chosen, by means of a sampling spear from
metre-interval plastic bags..
At the laboratory, the samples are dried, crushed and pulverised (90% passing 75 microns). A 100g
sample was retained from the pulverised sample for a four acid (complete) digest and 48 elements
were read on ICPMS. Gold was assayed by 25g fire assay.
Page 11 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse | JORC TABLE 1
Criteria
JORC Code explanation
Commentary
●
●
●
●
●
●
●
Quality
o
assay data
and
laboratory
tests
●
●
●
Verification
of sampling
and assaying
●
●
●
●
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie
lack of bias) and precision have been established.
●
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
●
●
●
●
●
●
●
●
Quality control included inserting CRM samples into the sampling chain at a rate of approximately 1
CRM sample for every 50 original samples.
Both blank and duplicate samples were each inserted at a rate of 1 in 50 samples.
The total population of control samples for soils and drilling was 5%.
None of the CRM types contain enough data points to carry out a statistically significant analysis. A
basic graphical assessment of the CRM assay results did not show significant bias.
The laboratory blanks show no contamination.
The drilling sample size (2 - 3kg) and the soil sample size (<1kg) is regarded as appropriate for the
nature and type of material sampled.
No studies have been undertaken to determine whether sample size was appropriate of the material
sampled.
Assay methods are considered appropriate for mineral resource estimation of the style and type of
mineralisation.
Quality Assurance and Quality Control (QA/QC) procedures included insertion of field duplicates
collected as a second split (field duplicate) direct from the drill rig at a rate of 1 in 75 samples.
Samples were analysed following four acid digest by Inductively Coupled Plasma Mass Spectrometry.
No check samples were submitted to independent laboratories.
Fe certified reference materials or blanks were not utilised.
Assessment of the field duplicate assay results did not show significant bias.
All drill hole data including geological logging was captured in GRID data acquisition software in real
time on logging laptop or field phones and sent to the company SQL database.
Leapfrog Geo Version 2024.1.2 upon importing the assays into the software, employs algorithms to
detect and highlight any errors, overlaps, or duplications in intervals, ensuring an accurate dataset.
Assay files are received electronically from the laboratory and securely filed on the company's server.
These files are then provided to the database manager who loads the data into the company's
database. Rigorous validation checks are performed at this stage, ensuring that the integrity and
accuracy of the assay data are maintained throughout the entire process.
Page 12 | 31
ASX : TEM
2025-06-16 | Yalgoo Update - Further Excellent Metallurgical Results From Remorse | JORC TABLE 1
Criteria
Location o
data points
JORC Code explanation
●
●
●
Data spacing
and
distribution
●
●
●
Orientation
of data in
relation
to
geological
structure
Sample
security
●
●
●
Commentary
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
●
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
●
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
●
The measures taken to ensure sample security.
●
●
●
●
●
●
●
●
●
●
●
All drill hole collar locations were determined by conventional GPS and/or accuracy improvements
from hybrid techniques native to the Android operating system.
The grid system applied is WGS84 zone 50.
Down-hole survey data was collected on all angled and vertical drillholes at the time of drilling using a
gyro.
Topographic surface control data is a UAV-collected DEM.
Initial selection and collection of 1m bulk-reject samples (from the Tempest Minerals 2024 RC drilling
program) for potential metallurgical testing was conducted by the Tempest Minerals Geology
Manager.
Samples were taken from all of the four mineralised intercepts from the Main Magnetite Layer.
A representative selection of mineralised samples was taken from the lesser, parallel, magnetite
layers.
The IMO Senior Metallurgist then selected all relevant 1m bulk-reject samples to be compiled to
create representative composite samples for the purpose of orebody characterisation. Seven
composite samples were selected from the Main Magnetite Layer and two from the lesser, parallel,
magnetite layers. Each composite sample was taken from single drill holes (not a composite of a
number of drill holes).
The units and lenses have a near-vertical dip and so drill holes were orientated to ensure drill
intersections were approximately perpendicular to the strike of the ore lenses and overall geological
sequence. Due to the capabilities of the RC drilling rig, holes were drilled at 60o giving typical dip
intersections to the plane of mineralisation of 33°.
The objective of drilling was directly to intercept mineralised lenses and structures.
Drill spacing is considered regular.
No potential sampling bias is expected. The drilling pattern and orientation is deemed to have
appropriately intercepted the ore lenses and stratigraphy.
Samples for metallurgical testing were collected, stored and personally delivered to the laboratory by
Tempest Minerals staff. Chain of custody was maintained throughout the sample collection, storage
and delivery process, although not stric