Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX : TEM
2025-07-31 | Quarterly Report June 2025
TEM | Quarterly Report - Period Ending 30 June 2025
Key Points
● Tempest progresses Remorse Deposit
○ Inaugural Mineral Resource Estimate (JORC 2012 Inferred) 63.5 Mt @ 30.6% Fe1
○ Metallurgical results received with Davis Tube Recoveries of up to 70% Fe
● Sanity
○ Geochemical survey highlights large coherent gold anomaly
● Private placement for $0.4M completed
● Entitlement issue for $1.469M completed with excellent shareholder take-up
Projects
Figure 01: Tempest Projects
1
Refer ASX release dated 8 May 2025 Yalgoo Update - Remorse Positioned For Rapid Development With Inaugural
Resource (Amended)
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Yalgoo
Tempest’s flagship project is the Company’s holding in the Yalgoo region of Western Australia. It totals more
than 1,000 km2 and is located near high-profile neighbours across multiple commodities, including Base
Metals (29 Metals Ltd—ASX:29M; Tungsten Mining NL —ASX:TGN), Gold (Spartan Resources Ltd—ASX:SPR;
Vault Minerals Ltd—ASX:VAU; Capricorn Metals Ltd—ASX:CMM), and Iron (Fenix Resources Ltd—ASX:FEX;
Karara Mining Limited and Sinosteel Midwest Group).
Figure 02: Yalgoo Projects Overview
Tempest has used data-driven processes to identify poorly or unexplored areas of highly prospective geology.
This approach has had considerable success and includes the discovery of multiple instances of new
mineralisation including the substantial Remorse magnetite deposit in 2024.
The project contains a number of different geological domains, though much of these have considerable
overlap. Within these domains, exploration targets continue to be identified through ongoing exploration and
data analysis and are being explored systematically according to prioritisation based on geological and other
criteria.
Page 2 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Remorse Deposit
The Remorse Deposit sits on the eastern side of the Yalgoo Project, near a number of historical gold, iron and
base metal occurrences. Work at the Remorse Target in 2023 and 2024 indicated a very strong base metals
signature at the Remorse Target and in Sept 2024 Tempest commenced drilling, which ultimately resulted in
the discovery of a large scale magnetite iron deposit 1, 2. Previously, Tempest has outlined an exploration
target 3, commenced metallurgical studies 4 and signed an MOU with prospective Mid-West GreenSteel
developer 5 Green Steel and Iron Pty Ltd (GISA), who have the intention to build a multi-billion dollar multi-user
iron processing hub nearby Tempest’s Yalgoo Project.
Figure 03: Regional infrastructure, Remorse Deposit and potential GreenSteel site
During the quarter, Tempest released an inaugural Mineral Resource Estimate (MRE) in accordance with the
JORC Code 2012 for the Remorse Deposit that comprised an inferred category total of some 63.5 Mt @
30.6% Fe 6.
Table 01: Mineral Resource Estimate for the Remorse Iron Deposit reported at 28% Fe cut-off grade.
Classification
Volume
thousand m3
Density
t/m3
Mass
Mt
Average Value
Fe%
Inferred
16 900
3.76
63.5
30.6
Total
16 900
3.76
63.5
30.6
Page 3 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Figure 04: Inaugural Remorse Resource viewed in plan (May 2025)
Tempest, in conjunction with IMO labs, also completed initial metallurgy testing of the magnetite ore from the
Remorse Deposit 7. Tempest considers the results of the metallurgical testwork to be extremely robust, with
the majority DTR numbers above 68% Fe and one sample being above 70%. Metallurgical testing also
confirmed low levels of contaminants and the veracity of the Remorse Deposit as a strong candidate for
potential further rapid development.
Table 01: Summary of DTR testwork for Fe% and significant contaminants.
Composite
P80 25μm
Fe %
Al203 %
Si02 %
S%
P%
1
68.79
0.12
3.82
0.08
0.031
2
68.88
0.19
3.55
0.86
0.015
3
70.08
0.08
2.16
0.10
0.009
4
68.95
0.05
3.22
0.25
0.007
5
69.17
0.04
3.54
0.02
0.009
6
65.71
0.01
7.39
0.11
0.080
7
69.42
0.05
2.71
0.21
0.008
8
63.00
0.60
10.24
0.10
0.070
9
63.91
0.07
9.20
0.55
0.048
*At the optimal P80 25μm grind size. Detailed DTR testwork results for all grind sizes and assayed elements are presented in Appendix E.
Page 4 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Figure 05: Plan view of Remorse Deposit with drill intercepts and metallurgical sampling locations
Figure 06: Long section of Remorse Deposit with drill intercepts and metallurgical sampling locations
Page 5 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Sanity Target
The Sanity Target sits in the eastern portion of the project area and is approximately 2 km south of the
Remorse Target.
Previous geochemical surveys and geological mapping have delineated multiple element zones of exploration
interest, with particular respect to Gold. Previous results include peaks of up to 80ppb, and individual rock
chips within the same geology trends have returned results of up to 7gpt gold, 0.2% copper and >60% Iron and
are along strike from and potentially part of a broader mineralised system as the Barron Rothchild deposit 8.
During the quarter, Tempest completed analysis of results from additional infill geochemical surveys at the
Sanity Target. The results show that the large coherent gold target remains after closer spaced sampling and
included soil results of up to 294ppb 9.
Figure 07: Sanity Target with sampling and anomaly outlines
Page 6 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Mount Magnet
Mt Magnet is a prolific multi-million-ounce gold mining centre with numerous large-scale, long-life open pit
and underground mines. It has been operated by major resources companies such as Western Mining
Corporation and Harmony Gold Ltd, and more contemporary successful mid-tier companies such as Ramelius
Resources Ltd and Westgold Ltd.
Range
Located in the heart of the Mount Magnet mineral field and 5km along strike from the prolific +6Moz Mount
Magnet Operations, the Range Project consists of 17 tenements for 20km2. The project is interpreted as
containing similar geology as the high-profile neighbouring Ordell Minerals Ltd’s Barimaia project to the east.
Wrangler Target
Wrangler is a near-mine exploration target born from predictive geological modelling conducted in 2023.
Field mapping confirmed the presence of blue quartz and tourmaline brecciate with rock chips up to 1gpt
Gold. The target sits 170m along strike of the legacy Brittania Well pit and may represent an extension of the
pit’s mineralisation.
During the quarter, Tempest completed planning for fieldwork announced subsequent to the end of the
reporting period 10.
Figure 08: Range Project Overview
Page 7 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Five Wheels
The Five Wheels Project is 266km2 of granted tenure in the Earaheedy region of Western Australia proximal to
the high-profile world-class Rumble Resources Ltd (ASX:RTR) discoveries. The project remains largely
under-explored (or unexplored for base metals) and shares similar geology to both the nearby Rumble
Resources Chinook deposit and the emerging Strickland Metals Ltd (ASX:STR) zinc-lead-copper discoveries.
The Project is located in the Earaheedy Basin, where a major geological unconformity surrounding the edge of
the basin hosts the initial Rumble Resources discoveries. More recent exploration implies that multiple key
geological sequences are or have the potential to be mineralised, and the prospectivity is more widespread
than originally considered.
No work was undertaken this quarter.
Figure 09: Five Wheels Project Overview
Page 8 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Elephant Project
The Elephant Project comprises 194km2 (135km2 granted - 59km2 application) of highly prospective
exploration leases. The location on the edge of a geological block (the suture between the Yilgarn and
Albany-Fraser) is a favourable location for major discoveries as evidenced by the presence of multiple
world-class deposits in similar environments along this trend.
The project was pegged primarily due to a strong geophysical anomaly and coincident geochemical data
from nearby previous exploration. The large scale and nature of the anomaly bear similarities to other
world-class deposits in the regions, such as Tropicana, of which Tropicana peak soil was 31pbb with 0-15m
cover while the Elephant Target is 5-10pbb with 100-150m of cover.
No work was undertaken this quarter.
Figure 10: Elephant Project Overview
Page 9 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Investment Portfolio
Africa
Through a divestment deal in 2020, Tempest retains a holding (25 million shares) in London listed Premier
African Minerals Ltd (AIM:PREM). At the end of the March 2025 quarter, PREM was priced at GBP0.035 and
the market value of Tempests’ holding was ~AUD$16,000.
USA
Argosy Minerals Ltd (ASX:AGY) are progressing their headline Tonopah Lithium Project (TLP) located in a
world class mining jurisdiction of Nevada, United States of America. Tempest retains an interest in the
project through a A$250,000 milestone based cash payment entitlement.
PNG
Tempest previously subscribed for 2,702,703 Shares at an issue price of A$0.37 for a total investment of A$1
million which assisted in the final stage of acquisition of the Tolukuma Gold mine Tolu and Mt Penck Projects
in Papua New Guinea prior to the successful IPO in 2023. During the quarter, Tempest sold its remaining Tolu
shares for proceeds amounting to $219,168..
Corporate
Capital Raising
In May 2025, Tempest announced it had raised $400,000 (before costs) via a placement of 100 million fully
paid ordinary shares at an issue price of A$0.004 per share together with 25 million free attaching options
with an exercise price of $0.01 and expiry date of 31 May 2027 11 .
During the quarter, Tempest announced a non-renounceable rights issue to Eligible Shareholders of one (1)
New Share for every two (2) Shares held at an issue price of $0.004 per New Share (together with
free-attaching options exercisable at $0.01 on or before 31 May 2027 to be issued on the basis of one (1)
option for every four (4) New Shares issued) to raise approximately $1,469,059.67 (before costs) (Entitlement
Offer) 12.
The Entitlement Offer was made by way of a prospectus prepared in accordance with section 713 of the
Corporations Act 2001 (Cth) lodged with ASIC and ASX on 9 May 2025 13.
In June 2025, Tempest advised it accepted applications for a total of 143,273,067 New Shares (35,818,318
New Options), amounting to $573,093. The resulting shortfall from the Entitlement Offer was 223,992,137
New Shares and 55,998,035 New Options (Shortfall), which was successfully placed later in June 2025
raising a further $895,968 (before costs) 14.
Tempest would like to thank all shareholders for their support and are excited to further progress our
exploration efforts at our Western Australian projects.
Growth
Tempest continues to actively investigate and evaluate new growth opportunities in a number of jurisdictions
and commodities that may bring added value to Tempest shareholders.
Sept 2025 Quarter Exploration
Exploration activities in the September 2025 quarter are anticipated to increase across the project portfolio,
with particular emphasis on fieldwork leading to potential drilling at the Range Project, as well as progressing
the development of the Remorse Magnetite Deposit.
Page 10 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
ASX Additional Information
1. ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure (excluding staff costs) during the
Quarter was $250,000. Full details of exploration activity during the Quarter are set out in this report.
2. ASX Listing Rule 5.3.2: There were no substantive mining production and development activities
during the Quarter.
3. ASX Listing Rule 5.3.5: $115,000 was paid to related parties during the quarter, comprising the
Managing Director’s salary and Non-Executive Director fees. During the quarter, $35,976 was paid to
Galt Mining Solutions Pty Ltd, a company in which Mr Burchell has a beneficial interest, for technical
consulting services regarding the exploration programs undertaken by the Company and for provision
of office space and storage. Legal fees amounting to $51,895 was paid to Hopgood Ganim Lawyers,
a legal firm where director Brian Moller was a partner (up to 30 June 2024) in their Brisbane office.
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian based mineral exploration company with a diversified portfolio of projects in
Western Australia considered highly prospective for precious, base and energy metals. The Company has an
experienced board and management team with a history of exploration, operational and corporate success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to
maximise shareholder value through focused, data-driven, risk-weighted exploration and development of our
assets.
Investor Information
investorhub.tempestminerals.com
Tempest welcomes direct engagement and encourages shareholders and interested parties to visit the
Tempest Investor hub which provides additional background information, videos and a forum for stakeholders
to communicate with each other and with the company.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
Website
Instagram
LinkedIn
Twitter
Youtube
Facebook
+61 892000435
Page 11 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on certain
assumptions and involve known and unknown risks, uncertainties and other factors, many of which are beyond the company’s
control. Actual events or results may differ materially from the events or results expected or implied in any forward-looking
statement. The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to
the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be fulfilled. Tempest
undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date of this
document (subject to securities exchange disclosure requirements). The information in this document does not take into
account the objectives, financial situation or particular needs of any person or organisation. Nothing contained in this document
constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project comments is based on information
compiled by Don Smith who is the Managing Director of Tempest Minerals Ltd. Don is a Member of AusIMM, AIG and GSA and
has sufficient experience relevant to the style of mineralisation under consideration and to the activities undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Don consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
The information in this report that relates to Estimation and Reporting of Mineral Resources at the Remorse Iron Deposit is
based on information compiled by Mr Chris Grove, who is a Member of The Australasian Institute of Mining and Metallurgy
(AusIMM). Mr Grove is a full-time employee of Measured Group Pty Ltd. Mr Grove has sufficient experience that is relevant to
the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Grove consents to the inclusion in the report of the matters based on the information in the
form and context in which it appears.
References to previous ASX releases
The information in this report that relates to Exploration results, Mineral Resources and Exploration Target as reported above
and referenced at Appendix A were last reported by the Company in compliance with the 2012 Edition of the JORC Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The Company confirms that it is not aware of
any new information or data that materially affects the information included in the market announcements referred to above
and further confirms that all material assumptions and technical parameters underpinning the Exploration results, Mineral
Resources and Exploration Target contained in those market releases continue to apply and have not materially changed.
Page 12 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Appendix A: References
1. TEM ASX Announcement dated 24 October 2024 “Yalgoo Update - High-Grade Iron Intercepted In
Early Drilling At Remorse” ➢
2. TEM ASX Announcement dated 21 November 2024 “Yalgoo Update - Further Excellent Iron Results” ➢
3. TEM ASX Announcement dated 03 December “High-Grade Magnetite Deposit Emerging at Remorse”
<Amended 16 January 2025 > ➢
4. TEM ASX Announcement dated 13 February 2025 “Remorse Metallurgical Testing Commences” ➢
5. TEM ASX Announcement dated 07 February 2025 “MOU signed with WA Developer Green Steel and
Iron” ➢
6. TEM ASX Announcement dated 08 May 2025 “Remorse Positioned For Rapid Development With
Inaugural Resource - Amended” ➢
7. TEM ASX Announcement dated 16 June 2025 “Further Excellent Metallurgical Results From Remorse
- Amended” ➢
8. WA8 Website https://warriedarresources.com.au/golden-range-and-fields-find-projects <accessed
2025-07-29>
9. TEM ASX Announcement dated 28 May 2025 “Further Geochemical Sampling Extends Sanity Gold
Anomaly” ➢
10.TEM ASX Announcement dated 22 July 2025 “Range Update - Exploration Work Commences In Mt
Magnet” ➢
11.TEM ASX Announcement dated 28 April 2025 “Capital Raising To Progress Iron And Gold Projects” ➢
12.TEM ASX Announcement dated 09 May 2025 “Non-renounceable Pro-Rata Entitlement Offer” ➢
13.TEM ASX Announcement dated 19 May 2025 “Dispatch of Entitlement Offer Prospectus” ➢
14.TEM ASX Announcement dated 10 June 2025 “Entitlement Offer Results” ➢
Page 13 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
Appendix B: Title Summary
Tempest provides the following addendum in relation to additional information required by Listing Rule 5.3.3.
Mining Title, Beneficial Interests and agreements held as at the end of the quarter:
Australia
License
Status
TEM Interest %
Notes
E 5902308
Granted
100
-
E 5902319
Granted
100
-
E 5902350
Granted
100
-
E 5902374
Granted
100
-
E 5902375
Granted
100
-
E 5902381
Granted
100
-
E 5902410
Granted
100
-
E 5902418
Granted
100
-
E 5902419
Granted
100
-
E 5902465
Granted
100
-
E 5902479
Granted
100
-
E 5902493
Granted
100
-
E 5902498
Granted
100
-
E 5902507
Granted
100
-
E 5902689
Granted
100
-
E 5902785
Granted
100
-
E 5902786
Granted
100
-
E 5902787
Pending
100
-
E 5902805
Pending
100
-
E 5902896
Pending
100
M 5900495
Granted
50
-
P 5902276
Granted
100
-
P 5902366
Pending
100
-
Yalgoo Region
Mount Magnet Region
P 5801770
Granted
100
-
P 5801773
Granted
100
-
P 5801781
Granted
100
-
P 5801783
Granted
100
-
P 5801784
Granted
100
Page 14 | 15
ASX : TEM
2025-07-31 | Quarterly Report June 2025
P 5801785
Granted
100
-
P 5801786
Granted
100
-
P 5801787
Granted
100
-
M 5800229
Granted
100
-
P 5801680
Granted
100
-
P 5801697
Granted
100
-
P 5801698
Granted
100
-
P 5801753
Granted
100
-
P 5801761
Granted
100
-
P 5801768
Granted
100
-
P 5801769
Granted
100
-
P 5801774
Granted
100
-
P 5801796
Granted
100
-
M5800372
Granted
100
-
M5800373
Granted
100
-
Five Wheels Project
E 6903884
Granted
100
-
E 6904224
Pending
100
-
E 6904225
Pending
100
-
E 2803057
Granted
80
-
E 2803145
Pending
80
-
Elephant Project
Page 15 | 15
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Tempest Minerals Limited
ABN
Quarter ended (“current quarter”)
32 612 008 358
30 June 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (12
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs and board & senior
management fees
(171)
(613)
(e) administration and corporate costs
(148)
(606)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
2
19
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives – R
& D refund
-
254
1.8
Other – due diligence costs
-
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(317)
(946)
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(9)
(250)
(1,836)
-
-
(d) exploration & evaluation including
applicable staff costs
(e) investments
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
(f)
Year to date (12
months)
$A’000
-
-
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
219
639
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other – Rental Bond
-
(2)
2.6
Net cash from / (used in) investing
activities
(31)
(1,208)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
1,869
2,700
2.2
other non-current assets
Current quarter
$A’000
Proceeds from the disposal of:
(d) investments
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(143)
(228)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
1,726
2,472
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
405
1,465
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(317)
(946)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(31)
(1,208)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
1,726
2,472
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date (12
months)
$A’000
-
-
1,783
1,783
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,783
405
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,783
405
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
169
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
34
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(317)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(250)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(567)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,783
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,783
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.14
-
$A’000
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 July 2025
Authorised by: The Board of Directors
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, t