Key Points
●
●
●
Legacy exploration identifies:
○ 1,130ppm Copper and 847ppm Zinc in soils
○ Key geological units noted in iron ore exploration but unsampled
50km strike length of highly prospective target area identified
TEM commences fieldwork onsite with geological mapping and sampling planned
Summary
Tempest Minerals Ltd (TEM) is pleased to provide information on the status of the FiveWheels Project.
During preparation for fieldwork, TEM identified important data in legacy exploration which has added further
value and anticipation to the FiveWheels Project. Previous iron ore exploration drilling outlined the presence
of key geological units that are now associated with base metal mineralisation. Additionally, high grade soil
results (1,130ppm Copper and 847ppm Zinc in soils) were collected by other explorers. This has unlocked ~
50km strike length of highly prospective target area.
TEM has commenced fieldwork consisting of geological mapping and sampling.
Five Wheels Project
Background
In July 2023, Tempest announced the acquisition of the
FiveWheels Project 1.
The FiveWheels Project is located ~146 km north of
Wiluna in the Western Australian Warburton Mineral field
within the Nabberu Region.
The project is 266km2 of highly prospective ground
laying on the northern edge of the Earaheedy Basin. The
Earaheedy Basin has been explored for multiple
commodities for over a hundred years due to its relative
proximity to mining towns such as Wiluna.
This region has been reinvigorated in the 2020s since
Rumble Resources Earaheedy Project (ASX:RTR)
announced a major discovery on 19 April 2021 2. This
was recently followed up on 19 April 2023 with a globally
significant, pit-constrained, maiden inferred Mineral
Resource Estimate (MRE) of 94Mt @ 3.1% Zn + Pb and
4.2g/t Ag (at a 2% Zn + Pb cutoff)] 3. Neighbouring
Strickland Resources Ltd (ASX:STK) Iroquois Project
also has announced similar styled mineralisation in 2023
4
.
The FiveWheels Project is approximately 36 km north of
these major developments and is considered to exhibit
similar geological prospectivity.
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 65
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
Legacy Results
Historic exploration in the vicinity of the FiveWheels Project was primarily or solely focussed on iron ore
prospectivity. This exploration was prior to the understanding of the base metal prospectivity in the
Earaheedy Basin.
In the western portion of the project, legacy soil geochemistry collected very high grade samples including
1,130 ppm (~0.1%) Copper and 847 ppm Zinc5.
Whereas in the western side of the project, key geological units including the Yelma Formation and the Frere
Formation (notably associated with mineralisation in other parts of the Earaheedy Basin) have been
intersected in legacy drilling for iron ore but not assayed 6.
Tempest Commences Fieldwork
Tempest has commenced fieldwork at the FiveWheels Project. The initial fieldwork program includes project
setup, initial reconnaissance and geological mapping and sampling at selected areas for the remainder of
October.
Next Steps
- Project wide data compilation in progress
- Results of initial fieldwork expected late in Q4
- Fieldwork will inform further fieldwork and drill targeting for 2024
Page 2 | 65
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian based mineral exploration company with a diversified portfolio of projects in
Western Australia considered highly prospective for precious, base and energy metals. The Company has an
experienced board and management team with a history of exploration, operational and corporate success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to
maximise shareholder value through focussed, data-driven, risk-weighted exploration and development of our
assets.
Investor Information
investorhub.tempestminerals.com
TEM welcomes direct engagement and encourages shareholders and interested parties to visit the TEM
Investor hub which provides additional background information, videos and a forum for stakeholders to
communicate with each other and with the company.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
Website
Instagram
LinkedIn
Twitter
Youtube
Facebook
+61 892000435
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on certain
assumptions and involve known and unknown risks, uncertainties and other factors, many of which are beyond the company’s
control. Actual events or results may differ materially from the events or results expected or implied in any forward-looking
statement. The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to
the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be fulfilled. Tempest
undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date of this
document (subject to securities exchange disclosure requirements). The information in this document does not take into
account the objectives, financial situation or particular needs of any person or organisation. Nothing contained in this document
constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project comments is based on information
compiled by Don Smith who is the Managing Director to Tempest Minerals Ltd. Dpn is a Member of AusIMM, AIG and GSA and
has sufficient experience relevant to the style of mineralisation under consideration and to the activities undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Don consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
Page 3 | 65
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
Appendix A: References
1. TEM ASX Announcement dated 20 July 2023 “ Tempest to Acquire Earaheedy Base Metal Project”
2. Rumble Resources Ltd ASX Announcement dated 19 April 2021 “Major Zinc-Lead Discovery at
Earaheedy Project”
3. Rumble Resources Ltd ASX Announcement dated 19 April 2023 “Maiden Resource Confirms
Earaheedy's World Class Potential” - refer Appendix C.
4. Strickland Metals Ltd ASX Announcement dated 19 October 2021 “High Grade Mississippi Valley-Type
Zinc-Lead Discovery In Earaheedy Basin”
5. DMIRS WAMEX report number A92348
6. DMIRS WAMEX Report A100621
Page 4 | 65
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
Appendix B: JORC Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has been done this would be relatively
simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases
more explanation may be required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
●
●
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so,
by what method, etc).
●
●
Samples referenced in the east of the project did not involve drilling.
Drilling referenced in the west of the project. Drilling conducted by
legacy explorer and much detail is unavailable. It is understood that
drilling was RC.
●
Method of recording and assessing core and chip sample recoveries and results
assessed.
●
●
Samples referenced in the east of the project did not involve drilling.
Drilling referenced in the west of the project. Drilling conducted by
legacy explorer and much detail is unavailable. It is understood
●
●
●
●
Drilling
techniques
Drill
sample
recovery
Commentary
Page 5 | 65
●
Samples referenced in the east of the project. Collected by legacy
explorer and much detail is not available. It is understood that these
were collected as conventional soil samples.
Drilling referenced in the west of the project. Drilling conducted by
legacy explorer and much detail is unavailable. It is understood that
percussion material was logged on ground but not sampled due to lack
of iron ore prospectivity.
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
●
●
Logging
●
●
●
Sub-sampling
techniques and
sample
preparation
●
●
●
●
●
●
Quality of assay
data
and
laboratory tests
●
●
●
Measures taken to maximise sample recovery and ensure representative nature
of the samples.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
anecdotally from photographs that all sample piles appear well filled
and no apparent losses.
Whether core and chip samples have been geologically and geotechnically logged
to a level of detail to support appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel,
etc) photography.
The total length and percentage of the relevant intersections logged.
●
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled
wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
●
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of
bias) and precision have been established.
●
Page 6 | 65
●
●
●
Samples referenced in the east of the project did not involve drilling but
are understood from the available data not to have been logged.
Drilling referenced in the west of the project. Drilling conducted by
legacy explorer and much detail is unavailable. It is understood that
RC percussion chips were logged on surface.
Samples referenced in the east of the project did not involve drilling but
are understood to have been dug and sieved, stored in paper geochem
packets.
Drilling referenced in the west of the project. Drilling conducted by
legacy explorer and much detail is unavailable. It is understood that
RC percussion chips were logged on surface but not sampled.
Samples referenced in the east of the project did not involve drilling but
are understood to have been assayed using aqua regia.
Drilling referenced in the west of the project. Drilling conducted by
legacy explorer and much detail is unavailable. It is understood that
RC percussion chips produced were logged but not assayed
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
Verification of
sampling
and
assaying
The verification of significant intersections by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
●
None known.
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
●
It is understood the location data was produced using handheld GPS
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
●
●
Not applicable.
●
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
●
The measures taken to ensure sample security.
●
No information available on auditing.
●
The results of any audits or reviews of sampling techniques and data.
●
No information available on auditing.
●
●
●
●
Location of data
points
●
●
●
Data
spacing
and distribution
●
●
●
Orientation
of
data in relation
to
geological
structure
Sample security
Audits
reviews
or
●
Page 7 | 65
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral tenement
and land tenure
status
●
●
Exploration done by
other parties
Geology
Drill
Information
hole
●
Commentary
Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
●
Acknowledgment and appraisal of exploration by other parties.
●
●
●
E6903884 held 100% by 5 Wheels Pty Ltd which is a subsidiary of
Tempest Minerals Ltd.
The tenements fall on the lands of the Gingirana and Marputu who are
the traditional owners.
Drilling referenced in this announcement was generated by Cazaly
Resources Ltd
Geochem data referenced in this announcement was generated by
Zenith Minerals Ltd
●
Deposit type, geological setting and style of mineralisation.
●
MVT, other base metal mineralisation styles
●
A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
○ easting and northing of the drill hole collar
○ elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
○ dip and azimuth of the hole
○ down hole length and interception depth
○ hole length.
○ If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
●
Full dataset can be found at
https://geodocs.dmirs.wa.gov.au/Web/documentlist/10/Report_Ref/A1
00621
Page 8 | 65
●
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
understanding of the report, the Competent Person should clearly
explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off grades
are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and
longer lengths of low grade results, the procedure used for such aggregation
should be stated and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal equivalent values should be
clearly stated.
●
Not applicable
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is known,
its nature should be reported.
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
●
Not applicable
●
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
●
Map of sample and drilling areas included in announcement.
●
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
●
A variety of grades of different elements are recorded in the data from
negligible to the maximum grades quoted in the announcement text.
●
Other exploration data, if meaningful and material, should be reported including
(but not limited to): geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating substances.
●
Limited further exploration was conducted.
●
The nature and scale of planned further work (eg tests for lateral extensions or
depth extensions or large-scale step-out drilling).
●
●
Project wide data compilation in progress.
Results of initial fieldwork expected late in Q4.
●
●
●
Relationship
between
mineralisation
widths
and
intercept lengths
Diagrams
Balanced reporting
Other substantive
exploration data
Further work
●
●
●
Page 9 | 65
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
●
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
Page 10 | 65
●
Fieldwork will be inform further fieldwork and drill targeting for 2024
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
Appendix C: Technical Data
Rumble Resources Ltd - Earaheedy Project Resource Table
Page 11 | 65
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
Cazaly Resources Ltd - Legacy Geochem Sampling
Easting_MGA Northing_MGA Sample ID
Sample Type
Fe_%
SiO2_%
Al2O3_%
TiO2_%
Mn_%
CaO_%
P_%
S_%
MgO_%
K2O_%
Na2O_%
LOI_%
Zn_%
Pb_%
276170.33
7157639.13
260 rock
58.7
8.41
3.78
0.23
0.04
0.5
0.024
0.02
0.38
0.1
0.03
2.81
0
277069.1
7159511.08
261 rock
40.5
27.1
2.21
0.09
0.9
0.13
0.757
0.05
0.13
0.57
0.03
8.36
0.07
0
0
274889.52
7159439.24
262 rock
29.1
47.9
2.67
0.08
0.11
0.1
0.307
0.05
0.05
0.45
0.08
5.65
0.1
0.03
255231.61
7171287.65
263 rock
16.3
34.3
3.51
0.1
19
0.1
0.138
0.07
0.08
1.83
0.1
7.68
0.05
0
253928.79
7173095.51
264 rock
39.1
32.1
3.35
0.14
1.29
0.16
0.078
0.05
0.14
0.23
0.03
5.32
0.12
0
250580.74
7173193.4
265 rock
9.33
15.5
2.6
0.1
37
0.13
0.359
0.07
0.01
2.72
0.11
11
0.07
0
236752
7194800.32
268 rock
2.09
19.8
4.64
0.16
40.9
0.13
0.202
0.03
0.14
2.85
0.13
9.73
0.28
0
247451.92
7190954.32
269 rock
48.2
16.6
1.64
0.1
0.77
0.15
0.297
0.04
0.22
0.2
0.04
9.64
0.12
0.04
244736.4
7181369.86
270 rock
49
13.8
4.37
0.18
0.14
0.04
0.426
0.03
0.12
0.95
0.03
9.01
0.06
0
248122.17
7181120.24
271 rock
47.2
13.8
1.86
0.08
3.06
0.06
0.082
0.07
0.58
0.5
0.03
10.7
0.07
0
248368.98
7181432.5
272 rock
46
15.2
1.97
0.09
3.88
0.16
0.103
0.06
0.79
0.55
0.06
10
0.02
0
242888.69
7197469.26
276 rock
7.33
4.84
2.11
0.04
45.6
0.35
0.369
0.02
0.22
2.4
0.2
13.1
0.04
0.01
242995.56
7197527.61
277 rock
22.1
10
3.06
0.08
27.5
0.08
0.651
0.06
0.02
1.7
0.09
13
0.04
0
254005.3
7174973.56
278 rock
56.6
4.04
0.67
0.03
0.11
0.05
1.14
0.03
0.08
0.11
0.17
11.3
0.05
0
254203.79
7174708.6
279 rock
47.5
15.6
3.66
0.17
0.47
0.09
0.487
0.07
0.15
0.79
0.08
9.78
0.05
0
277027.61
7160579.38
280 rock
19.9
42.5
4.43
0.11
4.28
4.78
1.63
0.1
1.07
0.85
0.18
7.5
0
0
271240.95
7159486.44
281 rock
60.7
1.53
1.02
0.04
0.14
0.1
0.831
0.03
0.07
0.14
0.03
8.31
0.05
0
270493.63
7159276.17
282 rock
4.95
2.12
2.54
0.06
50.6
0.19
0.253
0.03
0.25
3.32
0.23
13.2
0.02
0
277079.36
7160533.53
283 rock
9.56
61.2
5.62
0.2
0.19
6.9
2.58
0.11
0.85
0.38
0.07
4.46
0.02
0
277072.56
7160541.27
284 rock
16.1
51
4.05
0.16
1.58
6.51
2.45
0.15
0.56
0.43
0.06
5.46
0.03
0
277062.15
7160547.97
285 rock
10.1
62.4
6.16
0.21
1.47
3.92
1.33
0.08
1.2
0.83
0.15
5.23
0
0
277039.24
7160554.19
286 rock
15.9
46.6
5.06
0.12
2.88
7.51
2.59
0.02
1.04
0.85
0.14
5.52
0.01
0.01
277029.22
7160559.63
287 rock
21.3
49.3
5.12
0.21
1.44
2.71
0.975
0.18
0.89
0.62
0.13
5.7
0
0.01
277079.6
7160569.35
288 rock
6.11
30
4.35
0.2
1.56
17.1
0.946
0.04
11.2
0.41
0.09
23.8
0
0
277073.68
7160572.29
289 rock
32.8
28.7
3.24
0.12
4.15
2.9
1.02
0.03
1.09
0.33
0.03
8.62
0.01
0
277082.11
7160578.37
290 rock
33.6
29.4
2.86
0.12
2.04
3.67
1.21
0.1
1
0.35
0.04
8.23
0.01
0.03
277037.66
7160561.47
291 rock
34
26.6
2.73
0.12
3.95
3.84
1.45
0.27
0.6
0.42
0.12
8
0
0
246085.29
7175581.53
292 rock
24.8
20.5
2.83
0.1
3.3
12.3
0.193
0.11
4.29
0.59
0.06
18.5
0.01
0
246022.42
7175556.32
293 rock
37.7
22.5
2.14
0.05
5.99
0.5
0.138
0.04
1.13
0.74
0.05
10.6
0.03
0
245934.02
7175478.34
294 rock
34.3
41.6
0.57
0.03
1.07
0.19
0.048
0.04
0.26
0.1
0.03
6.44
0.08
0
245905.01
7175421.35
295 rock
44.1
19.9
2.56
0.12
3.34
0.22
0.119
0.09
0.37
0.22
0.05
8.11
0.07
0
245898.12
7175410.23
296 rock
23.4
51.3
3.68
0.08
2.6
0.55
0.164
0.15
0.23
0.35
0.04
5.73
0.04
0.02
245655.76
7175336.41
297 rock
35.3
23.2
3.56
0.09
6.53
0.6
0.203
0.05
0.65
1.37
0.1
10.2
0.01
0
245534.35
7175287.97
298 rock
37.1
30.5
2.6
0.08
2.38
0.09
0.043
0.06
0.31
0.83
0.04
8.63
0.05
0.04
Page 12 | 65
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
Easting_MGA Northing_MGA Sample ID
Sample Type
Fe_%
SiO2_%
Al2O3_%
TiO2_%
Mn_%
CaO_%
P_%
S_%
MgO_%
K2O_%
Na2O_%
LOI_%
Zn_%
Pb_%
277064.91
7159536.19
299 rock
36.7
26
2.66
0.08
4.63
0.12
0.651
0.09
0.11
0.46
0.04
9.59
0.07
0.01
277060.27
7159521.99
300 rock
27.4
45.8
3.93
0.12
1.43
0.13
0.349
0.07
0.21
1.12
0.07
6.47
0.05
0.02
277068
7159519.43
457 rock
11.3
73.8
0.78
0.02
3.75
0.12
0.166
0.03
0.05
0.34
0.05
3.31
0.02
0.02
277078.18
7159500.75
458 rock
25
52.2
2.83
0.21
0.84
0.08
0.424
0.05
0.12
0.61
0.05
5.59
0.06
0.04
276473.75
7160176.02
459 rock
48
13.6
4.3
0.14
0.4
0.03
0.622
0.03
0.13
1.05
0.06
10.1
0.08
0
276478
7160179
460 rock
47.8
15.5
2.84
0.11
0.55
0.2
0.521
0.16
0.09
0.38
0.04
9.9
0.08
0.01
276468
7160184
461 rock
41.6
20.3
4.61
0.1
1.93
0.12
0.478
0.15
0.05
0.28
0.03
10.2
0.11
0
276491
7160186
462 rock
39.2
31.6
2.41
0.07
0.48
0.15
0.448
0.11
0.04
0.1
0.03
7.7
0.06
0
236041.4
7194679.02
463 rock
46.2
17.6
5.04
0.23
0.06
0.03
0.118
0.05
0.17
1.07
0.04
9.04
0.06
0
238342.63
7195841.48
464 rock
51.2
12.6
4.85
0.22
0.05
0
0.15
0.1
0.05
0.82
0.1
7.65
0.02
0
239882.62
7193922.72
465 rock
32.7
43.4
2.15
0.11
0.04
0.02
0.305
0.04
0.02
0.29
0.05
6.16
0.04
0
240603.81
7194826.36
466 rock
39.7
26.1
7.5
0.32
0.26
0.09
0.366
0.05
0.12
1.27
0.14
6.25
0.05
0
241568.69
7197374.68
467 rock
46.5
18.2
4.17
0.16
0.08
0.03
0.277
0.08
0.04
0.48
0.05
9.31
0.07
0
243244.01
7197740.45
468 rock
4.52
17.5
4.03
0.12
40
0.16
0.115
0.03
0.35
1.9
0.14
10.7
0.04
0
272191
7159567
479 rock
39.8
29.6
3.38
0.09
0.61
0.2
0.446
0.08
0.28
0.18
0.02
0
0.01
0
266882
7159079
480 rock
22.3
64.1
0.66
0.02
1.37
0.04
0.026
0.01
0.04
0.13
0.05
0
0
0
266621
7158816
481 rock
45.1
28.9
3.67
0.13
0.15
0.16
0.029
0.09
0.03
0.04
0.02
0
0
0
266973
7158547
482 rock
28.5
54.8
2.38
0.12
0.07
0.02
0.037
0.02
0.04
0.04
0
0
0
0
267546
7159550
483 rock
38.9
30
6.89
0.94
0.09
0.02
0.024
0.07
0.04
0.02
0.03
0
0
0
264460
7162055
484 rock
59.3
6.57
3.07
0.12
0.15
0.09
0.123
0.22
0.07
0.14
0.03
0
0
0
264625
7161905
485 rock
63.1
5.6
1.41
0.06
0.06
0.03
0.026
0.06
0.02
0.03
0
0
0
0
267422
7160519
486 rock
61.7
5.04
2.56
0.19
0.05
0.06
0.122
0.14
0.02
0.02
0.01
0
0
0
267066
7160751
487 rock
57.9
3.14
1.7
0.11
0.93
0.04
1.07
0.05
0.05
0.18
0.03
0
0.02
0
267062
7160658
488 rock
57
8.31
4.27
0.22
0.04
0.03
0.083
0.11
0.05
0.15
0.04
0
0
0
266737
7160734
489 rock
46.5
29.3
2.06
0.1
0.03
0.03
0.065
0.07
0.02
0.02
0.03
0
0
0
269234
7159542
490 rock
59
6.31
2.69
0.08
0.11
0.12
0.115
0.18
0.04
0.03
0.02
0
0
0
268775
7160130
491 rock
61.2
3.12
1.8
0.07
0.13
0.13
0.28
0.12
0.05
0.07
0.03
0
0
0.02
268599
7160181
492 rock
57.4
8.54
3.61
0.1
0.12
0.07
0.251
0.07
0.12
0.18
0.04
0
0
0
268453
7159878
493 rock
53
11.9
5.18
0.08
0.02
0.02
0.024
0.1
0.02
0.02
0.01
0
0
0
264898
7161803
494 rock
63.6
2.75
1.27
0.05
0.08
0.14
0.064
0.15
0.02
0.01
0.02
0
0
0
264952
7161646
495 rock
61
3.21
2.19
0.12
0.1
0.03
0.222
0.12
0.05
0.04
0.02
0
0
0.01
274906
7159446
496 rock
50.9
14.7
0.77
0.02
0.36
0.34
0.373
0.21
0.09
0.05
0.04
0
0.2
0.02
275184
7159260
497 rock
49.1
15.9
1.49
0.04
0.19
0.12
0.738
0.03
0.09
0.17
0.14
0
0.12
0.09
274915
7159434
498 rock
48.7
18.1
0.85
0.03
0.73
0.14
0.306
0.06
0.13
0.06
0.14
0
0.17
0.03
Page 13 | 65
ASX : TEM
2023-10-24 | FiveWheels Update - Initial Fieldwork Commences Onsite
Cazaly ResourcesLtd - Legacy Geochem Sampling
SampleID
Sample_Type Orig_Grid_ID
2S00082
ROCK-OUTCR MGA94_51
Orig_North
7202532
Orig_East
292529
Orig_RL
643 MGA94_51
GDA_Grid_ID
Date_Sampled
14/05/2008
Al2O3
5.11
CaO
0.46
50.81
0.008
5.64
0.87
0.02
0.038
0.117
11.01
3.52
2S00083
ROCK-OUTCR MGA94_51
7198007
301118
628 MGA94_51
14/05/2008
1.09
0.26
32.03
0.026
0.66
0.37
0.02
0.019
0.008
51.49
0.06
2S00084
ROCK-OUTCR MGA94_51
7197994
301113
630 MGA94_51
14/05/2008
2.28
0.2
61.52
0.013
4.8
0.51
0.02
0.037
0.079
3.99
0.07
2S00085
ROCK-OUTCR MGA94_51
7197534
302178
624 MGA94_51
14/05/2008
1.24
0.09
64.71
0.078
1.73
0.63
0.02
0.016
0.049
3.27
0.03
2S00086
ROCK-OUTCR MGA94_51
7197202
302829
633 MGA94_51
14/05/2008
1.31
0.29
44.01
0.026
1.87
0.38
0.02
0.016
0.021
32.65
0.05
2S00087
ROCK-OUTCR MGA94_51
7197201
302830
999 MGA94_51
14/05/2008
2.78
0.12
62.54
0.013
2.93
0.1 X
0.02
0.068
4.11
0.25
2S00088
ROCK-OUTCR MGA94_51
7192276
306936
612 MGA94_51
15/05/2008
3.26
0.13
60.9
0.182
3.92
0.1
0.05
0.033
0.107
4.6
0.1
2S00089
ROCK-OUTCR MGA94_51
7191626
307204
619 MGA94_51
15/05/2008
2.33
0.11
61.15
0.1
3.41
0.11
0.02
0.031
0.119
5.8
0.08
2S00090
ROCK-OUTCR MGA94_51
7197147
302877
626 MGA94_51
15/05/2008
2.59
0.07
60.08
0.013
1.88
0.12
0.02
0.053
0.052
5.11
4.06
2S00091
ROCK-OUTCR MGA94_51
7194348
305620
629 MGA94_51
17/05/2008
3.64
0.06
60.05
0.061
3.67
0.07 X
0.035
0.099
6.03
0.15
2S00092
ROCK-OUTCR MGA94_51
7196791
303397
630 MGA94_51
17/05/2008
3.18
0.04
61.85
0.021
3.41
0.06
0.02
0.027
0.06
4.52
0.17
2S00093
ROCK-OUTCR MGA94_51
7197134
302837
638 MGA94_51
17/05/2008
3.88
0.05
61.41
0.025
3.08
0.04
0.02
0.018
0.063
4.82
0.12
2S00094
ROCK-OUTCR MGA94_51