HIGHLIGHTS
•
•
•
•
•
•
•
Large coincident Base Metals zone identified in potential Golden
Grove setting
25 kilometre long newly-identified greenstone belt mapped and
sampled
Above-background gold identified along 5 km of strike
Two of three regional mapping and soil geochemical surveys now
completed
Assays received for 319 samples from Program 1
Assays pending for 224 samples from Program 2
Infill follow up program being planned for gold and base metals
Base Metal anomaly identified – 100% owned Warriedar Project
Lithium Consolidated Ltd (Li3) is now exploring an extensive landholding of 510 km2 in the
Mount Magnet and Yalgoo mineral fields of the Murchison Province, Western Australia, some
500 km northeast of Perth. The first of 2 Programs of mapping and geochemical sampling
have been completed with assays received for the first program.
The first program focussed on a previously unidentified 25 km long greenstone belt, wrapping
around the eastern margin of a monzonite intrusion. The second program focussed on the
south-western corner of the intrusion, in an area of alteration, quartz veining and small-scale
gold mining in adjacent tenements.
A coincident copper, lead and zinc zone has been identified in the north-western area of the
tenement from hand auger sampling. Surface sampling in between auger lines also revealed
some anomalism, but of a less definitive nature than the hand auger results.
LITHIUM CONSOLIDATED LTD │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Warriedar Project
The eastern side has more than 25 km of previously unrecognized (and unexplored)
greenstone - considered highly prospective for volcanogenic massive sulphides (VMS) and
gold.
Figure 1. Elevated Lead from hand auger samples on Warriedar schematic geology
Figure 2. Elevated Copper from hand auger samples on Warriedar schematic geology
2
Figure 3. Elevated Zinc from hand auger samples on Warriedar schematic geology
2
Figure 4. Elevated Gold from hand auger samples on Warriedar schematic geology
3
Program 2 – South Western Warriedar Gold sampling program
The Warriedar Project is flanked by greenstones and volcanics and a possible intrusion related
gold system (IRGS) in the south-western corner. The adjacent area has been surface sampled
with grades up to 8 g/t Au.
Figure 5. Warriedar schematic geology
Assay results from 224 samples collected from the Warriedar Southwest (Program 2) are
awaited.
4
Figure 6. Sample location map Warriedar SouthWest - results awaited
Warriedar Project
The Project is based on 333 km2 of granted tenure located in the Warriedar Fold Belt of the
Yalgoo-Singleton Greenstone Belt.
The Eastern side has more than 25 km of previously unrecognized (and unexplored)
greenstone and felsic volcanics - considered highly prospective for volcanogenic massive
sulphides (VMS) and gold.
5
Reported historical production at the Warriedar Mining Centre and State Battery in the period
1913 - 1935 was at an average grade of 10.7g/t Au. The Warriedar Mine produced copper
between 1958-1969 at a grade of 9.83% Cu.
Figure 7. Tenement location map
The Board of the Company has authorised the release of this announcement to the market.
For more information, please contact:
Andrew Haythorpe
Managing Director
Phone: +61 (0) 8 9200 0435
Please visit us at: www.li3limited.com
6
Cautionary Statements
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only
predictions, based on certain assumptions and involve known and unknown risks,
uncertainties and other factors, many of which are beyond the company’s control. Actual
events or results may differ materially from the events or results expected or implied in any
forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or
prediction with respect to the accuracy of the underlying assumptions or that any
forward-looking statements will be or are likely to be fulfilled. Li3 undertakes no obligation to
update any forward-looking statement to reflect events or circumstances after the date of this
document (subject to securities exchange disclosure requirements).
The information in this document does not take into account the objectives, financial situation
or particular needs of any person or organisation. Nothing contained in this document
constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project
comments is based on information compiled by Nicholas Revell, a Competent Person who is
a Member of The Australian Institute of Geoscientists. Mr. Revell is a geologist consultant to
Lithium Consolidated. Mr. Revell has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr. Revell consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
7
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
● Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
● Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
● Aspects of the determination of mineralisation that are Material to the
Public Report.
● In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
●
Sampling was conducted in the following manner:
a) Conventional soil geochemical samples excavated using
shovel or mechanical post hole digger
b) 1-2kg samples of bottom of hole were collected in calico
bags
c) Sieved to <2mm
d) 100g subsamples placed into standard geochemical
satchels
e) Submitted for laboratory analysis (Intertek Perth)
Drilling
techniques
● Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
●
Not applicable
Drill sample
recovery
● Method of recording and assessing core and chip sample recoveries
and results assessed.
● Measures taken to maximise sample recovery and ensure
representative nature of the samples.
● Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
●
Not applicable
Logging
● Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
●
Sampling not applicable to mineral resource estimation or mining
studies
●
All sample sites were photographed and/or geologically logged
8
● Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
● The total length and percentage of the relevant intersections logged.
Sub-sampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification of
sampling and
assaying
Location of
data points
for lithology, alteration, structure and other factors
● If core, whether cut or sawn and whether quarter, half or all core
taken.
● If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
● For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
● Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
● Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
● Whether sample sizes are appropriate to the grain size of the material
being sampled.
●
Soil samples were sampled dry (1-2 kg) and sieved to <2 mm
●
100g subsamples placed into packaged geochemical sample
bags
●
Samples were submitted for laboratory analysis (Intertek
Genalysis Perth)
A 3 directional representative sample of each fine fraction
subsample was taken using a trowel
● The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
● For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
● Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
● The verification of significant intersections by either independent or
alternative company personnel.
● The use of twinned holes.
● Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
● Discuss any adjustment to assay data.
● Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
● Specification of the grid system used.
●
●
All equipment was brushed and air blown after each sieving
process
●
Approximately 5% of samples were taken for QAQC (duplicates
etc)
●
Laboratory assays were carried out at the Intertek Genalysis
facility in Perth, Western Australia.
●
Up to 300 grams (g) of the sieved sample was pulverised. At
least 85% of the sample was pulverised to 75 microns.
●
Twenty five grams of the pulverised sample was then taken for
aqua regia digestion (considered a partial digest).
●
The partial digest was then analysed for 33 elements using an
inductively coupled plasma mass spectrometer (ICP-MS).
●
Intertek lab codes are PU01 and AR25/MS33.
●
Data entry procedures were standardised using a predetermined
list of appropriate soil and rock description codes, digitally
captured and uploaded to a cloud server on a daily basis.
●
The sample description was collected on a combined digital
entry and GPS device so that no sample mismatch could occur.
●
The assay data were unadjusted.
●
Soil sample sites were defined using a conventional GPS device.
Sample location errors were typically +/- 3 meters, which is
considered as appropriate for the nature of this geochemical
survey.
9
Data spacing
and
distribution
● Quality and adequacy of topographic control.
●
Coordinates were collected using a WGS 84 coordinate
reference system and collected in decimal longitude and latitude
values.
● Data spacing for reporting of Exploration Results.
● Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
● Whether sample compositing has been applied.
●
Sample sites were defined along east-west oriented lines. The
line spacing was a nominal 1000 meters and sample points
along each line was a nominal 500 meters.
●
This data distribution is considered appropriate for the intended
geochemical survey.
●
No sample compositing has been applied.
Orientation of
data in
relation to
geological
structure
● Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
● If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
●
Not applicable.
Sample
security
● The measures taken to ensure sample security.
●
Sample names were pre-recorded on each sample bag and
digitally geolinked in the field whilst sampling, ensuring no
sample mismatch could occur.
●
Samples were stored appropriately to avoid any damage or
contamination during transit to the assay laboratory.
●
No audit results available.
Audits or
reviews
● The results of any audits or reviews of sampling techniques and data.
10
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
● Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
● The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
●
E59 /2224, E59 /2308, E59 /2375
●
100% Warrigal Mining Pty Ltd (a subsidiary of Li3)
●
Granted tenure, Western Australia
Exploration
done by other
parties
● Acknowledgment and appraisal of exploration by other parties.
●
Not applicable
Geology
● Deposit type, geological setting and style of mineralisation.
●
The geological setting is most likely an ancient submarine setting
that has since undergone burial, polyphase deformation and
metamorphism followed by exhumation. Associated rock likely
comprises altered felsic magmatic rocks and sedimentary
sequences.
●
The targeted styles of mineralisation are volcanogenic massive
sulphide (VMS) and orogenic vein- and shear zone-associated
gold.
●
Not applicable.
Drill hole
Information
● A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
● If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
11
Data
aggregation
methods
● In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
● Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
● The assumptions used for any reporting of metal equivalent values
should be clearly stated.
●
Not applicable.
Relationship
between
mineralisation
widths and
intercept
lengths
● These relationships are particularly important in the reporting of
Exploration Results.
● If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
● If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
●
Not applicable.
Diagrams
● Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
●
Not applicable.
Balanced
reporting
● Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
●
Not applicable.
Other
substantive
exploration
data
● Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
●
Schematic geologic interpretation maps accompany the
geochemical assay data.
Further work
● The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
● Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
●
Further work has been assessed within the press release and
diagrams indicate where ongoing work will be concentrated.
12
Share your feedback
Discover