2025-05-01 | Remorse Inaugural Resource
TEM | Yalgoo - Remorse Positioned For Rapid Development With Inaugural Resource
Key Points
●
●
●
Inaugural JORC 2012 Resource Estimate of 63.5 Mt @ 30.6% Fe (inferred category)
Resource provides platform to continue studies for potential development
Estimate based on limited drilling to date and significant exploration growth
expected
Summary
fi
fi
Tempest Minerals Ltd (TEM) is pleased to announce a signi cant milestone with the completion
of the inaugural inferred resource estimate for the Remorse Magnetite Iron Deposit. This
achievement marks the successful transition from exploration target to resource de nition,
providing a solid foundation for future development studies and potential mining operations at
the Yalgoo Project.
fi
fi
The inaugural resource estimation comprises 63.5 Mt @ 30.6% Fe. The resource is classi ed as
inferred due to a limited number of drillholes intersecting the key economic magnetite
iron-bearing geological layers. The tonnage and grade is based on a conservative cutoff grade
and TEM anticipates future signi cant increases as further drilling and project development
continues.
Managing Director Don Smith said regarding the resource estimation:
fi
fi
“This is an excellent outcome. We have gone from discovery to resource in a few short months - and this is
based on a relatively small number of drillholes. We have metallurgical and other studies well advanced
and we’ve already identi ed potential processing options and signed an MOU with GreenSteel and Iron. This
gives us con dence that we can progress from being an explorer to a developer as well.”
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Figure 01: Remorse location, resource model and estimate.
Page 1 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource
Remorse
Background
Remorse is part of TEM’s flagship Yalgoo Project in Western Australia. It totals more than 1,000 km2 and is
located near high-profile neighbours across multiple commodities, including Base Metals (29 Metals
Ltd—ASX:29M; Tungsten Mining NL —ASX:TGN), Gold (Spartan Resources Ltd—ASX:SPR; Vault Minerals
Ltd—ASX:VAU; Capricorn Metals Ltd—ASX:CMM), and Iron (Fenix Resources Ltd—ASX:FEX; Karara Mining Ltd
and Sinosteel Midwest Group).
The Remorse Deposit, located on the eastern side of the Yalgoo Project, is a large magnetite iron deposit
discovered in 2024 1 through drilling of a VMS style base metal target 2. While copper was intercepted and
considerable base metal potential remains within the project, the initial 4,005m reverse circulation drilling
program also intersected significant magnetite zones yielding high-grade iron (up to 39%) 3.
TEM subsequently released an exploration target for the Remorse Deposit 4 and commenced other activities
such as metallurgical testing 5.
TEM also signed a memorandum of understanding with burgeoning mid-west steel developer GreenSteel and
Iron Pty Ltd 6 to commence work to assess potential processing synergies between the two companies.
Resource Estimation
The inaugural resource estimate for the Remorse Magnetite Iron Deposit is 63.5 million tonnes at 30.6% iron
(Fe). The resource estimate was independently completed by respected resource estimation consultancy
Measured Group Pty Ltd and the work completed adheres to industry best practices and JORC (2012)
guidelines.
The utilisation of the latest technologies and modern software has benefited TEM’s exploration activities
previously. The Remorse discovery and subsequent resource estimation have also harnessed this approach,
including the use of advanced 3D modelling and efficient, centralised project management, enabling a rapid
turnaround with development of an inaugural resource only months after discovery.
Table 01: Mineral Resource Estimate for the Remorse Iron Deposit reported at 28% Fe cut-off grade.
Classification
Volume
thousand m3
Density
t/m3
Mass
Mt
Average Value
Fe%
Inferred
16 900
3.76
63.5
30.6
Total
16 900
3.76
63.5
30.6
All the estimated resources are classified as Inferred Resources. The Inferred Resources comprise the five (5)
parallel magnetite iron formation units that were drill-tested. 50mRL, which is equivalent to a depth of
approximately 275 m to 290 m below surface, has been used as a depth limit to the resource and is
considered an appropriate limit for consideration of reasonable prospect for eventual economic extraction
(RPEEE) via open pit mining methods. Resources have also been limited along strike to approximately half the
average drillhole spacing. The resulting resource has approximately 4000m of strike length with drillholes at
approximately 500m spacing.
Page 2 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource
A block model was developed using Leapfrog Geo Version 2024.1.2. The Inverse distance squared (ID2)
modelling method was used to estimate the Fe block grades. This method is considered appropriate for this
style of mineralisation, the relatively small number of drillholes and the category of resource being reported
(Inferred).
The tonnages were calculated by applying density values estimated from mineralogical compositions and the
percentage content of Fe. This has resulted in an average density of 3.76 t/m3 for the orebody. Further drilling
and analysis is required to refine these estimates and improve the resource categorisation.
Validation was undertaken using the following methods: Global mean checks to ensure the estimated block
was not significantly overestimated or underestimated; Visual checks to ensure that the block grades
honoured the sample grades by slicing through three different sections, i.e., easting, northing and elevation in relation to the visual checks, swath plots were also produced to assess any potential over-smoothing or
biases along the three different sections.
This inferred resource provides a substantial base for ongoing studies and potential development planning,
highlighting the significant scale of the Remorse discovery within TEM’s Yalgoo Project.
Figure 02: Block model longitudinal projection.
Page 3 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource
Further Potential
The current resource model demonstrates some sensitivity to cut-off grade, with relatively small reductions in
cut-off resulting in substantial increases in total tonnes. At a 28% Fe cut-off, the resource stands at 63.5 Mt;
however, reducing the cut-off to 26% increases the tonnage by over 25% to 79.7 Mt.
This trend continues progressively — reaching 106.5 Mt at a 20% Fe cut-off (Table 02), in line with the upper
range from the previously released exploration target. This highlights a 67% increase in tonnage relative to
the 28% cut-off, while the average grade decreases modestly with lower cut-offs more likely to be used in an
operational environment.
The independent consultants at Measured Group Pty Ltd responsible for the resource estimation consider
that the conservative 28% Fe cut-off is appropriate for reporting, reflecting an approach aligned with the
current stage of project development.
Figure 03: Remorse Resource Estimation Grade tonnage curve.
Table 02: Grade tonnage curve data: Mt at selected cut-off grades.
Cut-off Grade
Fe%
Tonnes ≥ Cut-off
Mt
Average Grade ≥ Cut-off
Fe%
Material Content
%
28
63.5
30.6
59.8
26
79.7
29.9
73.3
24
94.4
29.2
84.7
22
99.6
28.9
88.4
20
106.5
28.4
92.8
Page 4 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource
The inaugural resource estimate matches well when compared to the previously released exploration target
for the Remorse Deposit and provides excellent context for the current resource figures. This distinction
reflects the transition from a more conceptually defined exploration target to a more detailed resource, based
on verified geological and drilling information. The initial exploration target for Remorse was based on the
entire known outcropping area of the deposit. In contrast, the inaugural resource estimate is confined to
areas with drillhole data, providing a more robust and data-driven assessment.
There is potential for extensional growth to the resource base as it is also noted that the current estimate is
based on relatively limited drilling, further enhancing the project’s economic potential. This includes
extensional drilling along the known outcropping footprint, as well as testing undrilled units (at least 5) that
were not drill tested during the first drill program and are not included in the resource estimation.
The initial resource estimate confirms the Company’s belief that the Remorse Deposit has high potential to be
rapidly developed into a low-cost, from surface, open pit operation with major infrastructure including rail to
port as well as multiple processing options available within short haulage distance.
Figure 04: Remorse Resource Estimation vs outcropping and identified mineralisation.
Next Steps
-
Metallurgical Test Work - In progress
-
Planning for further drilling
-
Approvals for future works including environmental studies
-
Economics and Infrastructure studies
Page 5 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian based mineral exploration company with a diversified portfolio of projects in
Western Australia considered highly prospective for precious, base and energy metals. The Company has an
experienced board and management team with a history of exploration, operational and corporate success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to
maximise shareholder value through focused, data-driven, risk-weighted exploration and development of our
assets.
Investor Information
investorhub.tempestminerals.com
TEM welcomes direct engagement and encourages shareholders and interested parties to visit the TEM
Investor area of our website which provides additional background information, videos and a forum for
stakeholders to communicate with each other and with the company.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
Website
Instagram
LinkedIn
Twitter
Youtube
Facebook
+61 892000435
Page 6 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based
on certain assumptions and involve known and unknown risks, uncertainties and other factors, many of which
are beyond the company’s control. Actual events or results may differ materially from the events or results
expected or implied in any forward-looking statement. The inclusion of such statements should not be
regarded as a representation, warranty or prediction with respect to the accuracy of the underlying
assumptions or that any forward-looking statements will be or are likely to be fulfilled. Tempest undertakes
no obligation to update any forward-looking statement to reflect events or circumstances after the date of
this document (subject to securities exchange disclosure requirements). The information in this document
does not take into account the objectives, financial situation or particular needs of any person or
organisation. Nothing contained in this document constitutes investment, legal, tax or other advice.
Competent Person Statements
The information relating to the resource estimate in this announcement is based on information compiled by
Chris Grove who is a Principal Geologist at Measured Group Pty Ltd.
Christopher Grove is the Competent Person for this Report and:
● Has read and understood the requirements of the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code,
2012 Edition)
● Chris is a Competent Person as defined by the JORC Code 2012 Edition, having at least five years of
experience that is relevant to the style of mineralisation and type of deposit described in this Report,
and to the activity for which I am accepting responsibility.
● Chris is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM).
● Chris has reviewed the Report to which this Consent Statement applies.
Chris is a full-time employee of Measured Group Pty Ltd and has been engaged by Tempest Minerals Ltd to
prepare the documentation for the Remorse Iron Deposit on which the Report is based, for the period ending
March 2025.
Chris has more than 28 years of experience in the estimation of Mineral Resources both in Australia and
overseas. This expertise has been acquired principally through exploration and evaluation assignments at
operating mines and exploration areas.
Chris has disclosed to the reporting company the full nature of the relationship between himself and the
company, including any issue that could be perceived by investors as a conflict of interest.
Chris verifies that the Report is based on and fairly and accurately reflects in the form and context in which it
appears, the information in my supporting documentation relating to Mineral Resources.
Pursuant to the requirements of ASX Listing Rules 5.6, 5.22 and 5.24 and Clause 9 of the JORC Code 2012
Edition, Chris consents to the release of this Report and this Consent Statement by Tempest Minerals Ltd.
The information in this announcement that relates to Exploration Results, Exploration Targets and general
project comments is based on information compiled by Jirka Just who is the Geology Manager at Tempest
Minerals Ltd. Jirka is a Member of AIG and has sufficient experience relevant to the style of mineralisation
under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Jirka consents to the inclusion in the report of the matters based on his information in the form and context
in which it appears.
Page 7 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource
Appendix A: References
1. TEM ASX Announcement dated 24 October 2024 “Yalgoo Update - High-Grade Iron Intercepted In
Early Drilling At Remorse” ➢
2. TEM ASX Announcement dated 21 November 2024 “Yalgoo Update - Further Excellent Iron Results” ➢
3. TEM ASX Announcement dated 19 August 2024 “Remorse Sampling Indicates Further
Prospectivity”➢
4. TEM ASX Announcement dated 03 December 2024 “High-Grade Magnetite Deposit Emerging at
Remorse” <Amended 16 January 2025 > ➢
5. TEM ASX Announcement dated 13 February 2025 “Remorse Metallurgical Testing Commences” ➢
6. TEM ASX Announcement dated 07 February 2025 “MOU signed with WA Developer Green Steel and
Iron” ➢
Page 8 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource |
Appendix B: JORC Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
●
●
●
●
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Commentary
●
●
●
●
●
●
●
●
●
●
●
A maiden program of 21 RC holes reverse circulation (RC) drill holes for a total of 4,005 m was
completed in September and October 2024.
Year
Drilling method
Hole count
Metres drilled count
2024
RC
21
4,005
Industry standard sample preparation and analysis methods were used.
Each 1 m sample was split directly off the cyclone using a rig-mounted, conical, dual shoot splitter to
deliver a 2-3 kg primary split sample into a numbered calico bag with the bulk reject passed into a
green plastic RC bag and stored at the drill site.
Sieved fines (unwashed) of each metre drilled were collected separately for first-pass geochemical
analysis on BoxscanTM (Geotek Limited) which includes a mounted portable X-ray Fluorescence (XRF)
spectroscopy which acquires elemental abundance from the surface of the material analysed.
To ensure the quality of the RC samples collected, every effort was made to drill all samples dry.
Water incursion is noted in the drill logs. The sampling system, rods and cyclone were cleaned at least
after every rod (6 m).
Drilling was completed dry using dust suppression without any water injection.
Metre delineation was controlled by means of visual marks on the mast chain on rig. The metre marks
were checked for accuracy at the start of the drilling deposit.
Sample intervals which returned iron grade (>10%) from the BoxscanTM were submitted for laboratory
analysis.
The sampling methodology is industry standard and considered both representative and appropriate.
Independent certified assay laboratories were used for analysis. Samples were analysed at Intertek
Genalysis Laboratory in Perth where samples were dried, crushed and pulverised (90% passing 75
microns). A 100 g sample was retained from the pulverised sample for a four-acid (complete) digest
Page 9 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource |
Criteria
JORC Code explanation
Commentary
and analysed by Induced Couple Plasma Mass Spectroscopy (ICP-MS) for 48 elements including iron
(Fe), alumina (Al2O3), titanium dioxide (TiO2), sulphur (S) and phosphorus (P).
Drilling
techniques
Drill sample
recovery
●
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method,
etc).
●
RC drilling was conducted using a track-mounted Hydco 1000H rig with an onboard 1150CFM/351psi
air compressor and a similarly rated external compressor /booster combined delivered 2400CFM/
900psi to the bit face through 6 m rods (41⁄2 inch diameter) and a face sampling percussion hammer (5
to 53/4 inch diameter).
●
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
●
Recoveries from each metre of drilling were not measured, but visual inspection and monitoring of
samples in the field indicated that recoveries were high, visually consistent, and any variations were
recorded. The drill string was monitored to minimise dust, and metre delineation was kept in check by
monitoring marks on the chain. No material bias is expected in grade or recovery between the
preferential loss/gain of fine/coarse media.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to suppor
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
●
All drill hole data including geological logging was captured in GRID data acquisition software in real time
on logging laptop or field phones and sent to the company SQL database. Data collected included:
metadata, location data, downhole surveys, lithology, mineralogy, structures, groundwater information and
photography.
The logging process enables a thorough understanding of the geological features present in the drill holes
This information is critical for making informed decisions regarding exploration, resource estimation,
mining and metallurgical studies.
100% logging coverage ensures a thorough dataset, supporting accurate and reliable assessments in
subsequent studies.
Reverse circulation chip samples were sieved and placed into chip trays and are logged to a degree that
facilitates robust resource estimation and comprehensive study.
Drill holes were logged to a level of detail to support this Mineral Resource Estimation. Any
inconsistencies in logging or log availability is reflected in the Mineral Resource classification.
Summary geological logging is presented in Appendix C.
●
●
Logging
●
●
●
●
●
●
●
●
Page 10 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource |
Criteria
Sub-sampling
techniques and
sample
preparation
JORC Code explanation
●
●
●
●
●
●
If core, whether cut or sawn and whether quarter, half
or all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
Commentary
●
●
●
●
●
●
●
●
●
●
Quality of
assay data and
laboratory tests
●
●
●
The nature, quality and appropriateness of the
assaying and laboratory procedures used and whether
the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie
lack of bias) and precision have been established.
●
●
●
●
●
●
A rig-mounted, conical splitter was used for all drill samples delivered from the rig.
Composited-samples for analysis were collected where chosen, by means of a sampling spear from
metre-interval plastic bags..
At the laboratory, the samples are dried, crushed and pulverised (90% passing 75 microns). A 100g
sample was retained from the pulverised sample for a four acid (complete) digest and 48 elements
were read on ICPMS. Gold was assayed by 25g fire assay.
Quality control included inserting CRM samples into the sampling chain at a rate of approximately 1
CRM sample for every 50 original samples.
Both blank and duplicate samples were each inserted at a rate of 1 in 50 samples.
The total population of control samples for soils and drilling was 5%.
None of the CRM types contain enough data points to carry out a statistically significant analysis. A
basic graphical assessment of the CRM assay results did not show significant bias.
The laboratory blanks show no contamination.
The drilling sample size (2 - 3kg) and the soil sample size (<1kg) is regarded as appropriate for the
nature and type of material sampled.
No studies have been undertaken to determine whether sample size was appropriate of the material
sampled.
Assay methods are considered appropriate for mineral resource estimation of the style and type of
mineralisation.
Quality Assurance and Quality Control (QA/QC) procedures included insertion of field duplicates
collected as a second split (field duplicate) direct from the drill rig at a rate of 1 in 75 samples.
Samples were analysed following four acid digest by Inductively Coupled Plasma Mass Spectrometry.
No check samples were submitted to independent laboratories.
Fe certified reference materials or blanks were not utilised.
Assessment of the field duplicate assay results did not show significant bias.
Page 11 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource |
Criteria
Verification of
sampling and
assaying
JORC Code explanation
●
●
●
●
Location of
data points
●
●
●
Data spacing
and distribution
●
●
●
Orientation of
data in relation
to geological
structure
●
●
Commentary
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
●
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
●
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
●
●
●
●
Most holes were angled at 60 degrees and drilled towards 030 degrees.
Mean length of recorded samples is 1 m.
All samples were one (1) metre samples.
Extensive typically continuous banded iron formation outcrop and the drill spacing provides evidence
of mineralised zone continuity for the purposes of resource estimation and is reflected in the
classification level.
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to
which this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
●
The units and lenses have a near-vertical dip and so drill holes were orientated to ensure drill
intersections were approximately perpendicular to the strike of the ore lenses and overall geological
sequence. Due to the capabilities of the RC drilling rig holes were drilled at 60o giving typical dip
intersections to the plane of mineralisation of 33°.
Objective of drilling was directly to intercept mineralised lenses and structures.
Drill spacing is considered regular.
No potential sampling bias is expected. The drilling pattern and orientation is deemed to have
appropriately intercepted the ore lenses and stratigraphy.
●
●
●
●
●
●
●
All drill hole data including geological logging was captured in GRID data acquisition software in real
time on logging laptop or field phones and sent to the company SQL database.
Leapfrog Geo Version 2024.1.2 upon importing the assays into the software, employs algorithms to
detect and highlight any errors, overlaps, or duplications in intervals, ensuring an accurate dataset.
Assay files are received electronically from the laboratory and securely filed on the company's server.
These files are then provided to the database manager who loads the data into the company's
database. Rigorous validation checks are performed at this stage, ensuring that the integrity and
accuracy of the assay data are maintained throughout the entire process.
All drill hole collar locations were determined by conventional GPS and/or accuracy improvements
from hybrid techniques native to the Android operating system.
The grid system applied is WGS84 zone 50.
Down-hole survey data was collected on all angled and vertical drillholes at the time of drilling using a
gyro.
Page 12 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource |
Criteria
Sample
security
Audits or
reviews
JORC Code explanation
Commentary
●
The measures taken to ensure sample security.
●
Samples were acquired on-site by competent geologists, each labelled with a unique sample ID, with
five (5) samples grouped into a labelled polyweave bag and transported securely to Intertek Genalysis
Laboratory in Perth establishing a rigorous chain of custody in accordance with industry standards.
●
The results of any audits or reviews of sampling
techniques and data.
●
Sampling techniques and data processes of Tempest Minerals Limited have been reviewed by
Measured Group in 2025.
Page 13 | 24
ASX : TEM
2025-05-01 | Remorse Inaugural Resource |
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
●
●
Commentary
Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness
or national park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
●
Tempest Minerals Limited Exploration Permits for Minerals are: EPMs E 590/2465, E 59/2479 and
E59/2486 for a total of 224.9 km2. The tenements are in good standing and no known impediments
exist. These leases are held in their
Share your feedback
Discover