Euro - Precious Metal Rock Chips & Change Of Footprint
Released
Released
Announcement PDF
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint
TEM | Euro Update - Precious Metal Rock Chips & Change Of Footprint
Key Points
High grade silver rock chips at Budapest target
New geological zone emerging near existing drilling
Change in project footprint including new leases and termination of JV discussions with KML
●
●
●
Summary
Tempest Minerals Ltd (TEM) is pleased to provide information to the market on new developments at the Euro
Project - part of the Company’s flagship holdings in the Yalgoo region. A recent review of samples collected for
mineralogical mapping at the Budapest target has highlighted the presence of silver (up to 63ppm*) in pXRF
measurements. Silver is commonly present with gold and base metals and its presence along with other alteration
minerals indicates an extension of known mineralisation previously recognised at the Calais target. Changes have
also been made to the project footprint with extensions of the Euro project to the south and the cessation of JV
discussions with Karara Mining Ltd (KML).
* Portable XRF (pxrf) results are not comparable in reliability to authorised laboratory results and should be not relied on for
quantitative purposes outside indicative demonstrations of potential order of magnitude of enrichments.
Euro Project
Background
The Euro Project is part of TEM’s exciting exploration portfolio in the Yalgoo
region of Western Australia which totals more than 900 km2. Euro covers over
300 km2 of tenements (167 km2 granted / 152 km2 application) that form part
of unexplored or underexplored geological terrains located between several
major operations including: Karara (Iron), Rothsay (Gold/Copper) and Mt
Mulgine (Gold/Tungsten).
Parts of the project have been cursorily explored for gold and iron ore in the
1990s and early 2000s. Shallow reconnaissance drilling in the north of the
project area encountered substantial gold mineralisation but was not
thoroughly tested due to depressed metal prices and other economic
1, 2, 3
challenges present during those campaigns
.
TEM have been actively exploring at the project since 2020, with a major data
compilation of the combined area for the first time unravelling numerous
exciting opportunities for a number of commodities including iron, lithium and
4
base metals .
Fieldwork at the Euro project in 2021 included mapping, interpretation and
critically, rock chips and soil geochemistry, which provided multi element
geochemistry for the first time (the areas of historic exploration and drilling
5
were explored for gold only) . This culminated in TEM announcing the presence of a number of exploration targets
6
and the presence of numerous iron rich formations widely mapped across the project
7, 8
.
9
With polymetallic mineralisation and gold in focus, in late 2021, TEM announced the commencement of drilling at
the Calais Target with the intention of confirming historical drilling and also testing several new targets. TEM
subsequently followed up with announcements regarding the presence of sulphides in several of the drillholes
completed
10
and the presence of a kilometre scale mineralised corridor defined by mapping and existing drilling
11
. This corridor is now understood to contain wide spread gold with results remaining open in multiple directions
and at depth. Confirming the presence of widespread polymetallic mineralisation is an exciting addition to the
project geology and the current work indicates that this mineralisation is even further widespread than previously
indicated.
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 16
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint
Geology
The Euro Project comprises primarily ultramafic, mafic and felsic stratigraphy with banded iron-formations
(BIF), which forms part of the southern Yalgoo Greenstone belt. Both the mafic/ultramafic sequences –
which include Rothsay and Mount Mulgine pits e.g. Black dog – and the BIF at Karara 3 are known to host
gold throughout the region.
Drilling completed at Euro in early 2022 also intersected thick zones of a previously undocumented
sedimentary package in the south of the Calais target which is possibly related to the extensive iron
formations present across the terrain.
These sediments (and to a lesser extent the iron formations themselves) hosted not only hydrothermal
quartz, but also multiple zones of mineralised gossan which is possibly VMS (volcanogenic massive sulphide)
or skarn related.
Field mapping by geologists adjacent to the Calais program discovered outcrops, now known as the Budapest
Target. Rocks observed at this location were heavily altered with minerals such as fuchsite and potentially
silica and iron gossan. One of these rocks produced pXRF measurements of up to 63ppm silver (Ag) in
portable x-ray fluorescence (pxrf) *. A limited soil geochemistry program was conducted in the Budapest
locality as a result. Legacy sampling did not analyse for multi- elements and TEM are currently awaiting
several samples assays and will integrate these with the legacy data and report in due course.
These outcomes are highly anomalous and further reinforced the prospectivity of the project alongside
Tempest drill results at the proximal to the Calais target. Further surface geochemistry has been conducted
in the immediate surrounds and is currently being reviewed.
* Portable XRF (pxrf) results are not comparable in reliability to authorised laboratory results and should be not
relied on for quantitative purposes outside indicative demonstrations of potential order of magnitude of
enrichments.
Figure 02: TEM Euro Project Showing Total Magnetic Intensity & Target Areas
Page 2 | 16
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint
Change In Footprint
Karara JV
In June 2022 TEM announced the signing of an MOU with a view to commence a Joint Venture with Karara
Mining Ltd (KML) on tenements nearby the TEM Euro Project
12
. The MOU was subject to various conditions
which have not been met by the agreed timeline and subsequently KML have informed TEM that they have
elected to terminate the MOU.
Additional lease applications
In response to new geological interpretations, TEM have applied for a number of new tenements adjoining the
Euro Project. This was in conjunction with a larger regional landholding change for a total increase of
tenements in the Yalgoo Region of ~195km2
13
announced in February. TEM believe that this extended area is
prospective for gold and other minerals within orogenic, intrusion and skarn related systems.
Figure 03: TEM Euro Project Tenure Overview
Next Steps
- (Euro) Follow up fieldwork to further understand the controls at the Budapest target (Q3)
- (Meleya) Extension of geochemistry survey at Remorse
14, 15
and nearby new targets (Q3)
- (Meleya/War West) Results of recent Aerial Electromagnetic Survey
Page 3 | 16
16
results pending (late Q3)
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian based mineral exploration company with a diversified portfolio of projects in
Western Australia considered highly prospective for precious, base and energy metals. The Company has an
experienced board and management team with a history of exploration, operational and corporate success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to
maximise shareholder value through focussed, data-driven, risk-weighted exploration and development of our
assets.
Investor Information
investorhub.tempestminerals.com
TEM welcomes direct engagement and encourages shareholders and interested parties to visit the TEM
Investor hub which provides additional background information, videos and a forum for stakeholders to
communicate with each other and with the company.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
Website
Instagram
LinkedIn
Twitter
Youtube
Facebook
+61 892000435
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on certain
assumptions and involve known and unknown risks, uncertainties and other factors, many of which are beyond the company’s
control. Actual events or results may differ materially from the events or results expected or implied in any forward-looking
statement. The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to
the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be fulfilled. Tempest
undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date of this
document (subject to securities exchange disclosure requirements). The information in this document does not take into
account the objectives, financial situation or particular needs of any person or organisation. Nothing contained in this document
constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project comments is based on information
compiled by Don Smith who is the Managing Director of Tempest Minerals Ltd. Don is a Member of AusIMM, AIG and GSA and
has sufficient experience relevant to the style of mineralisation under consideration and to the activities undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Don consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
Page 4 | 16
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint
Appendix A: References
1. DMIRS WAMEX report A82655 and preceding reports which are compiled by these
2. DMIRS WAMEX report A48951 and preceding reports which are compiled by these
3. DMIRS WAMEX report A48951, A52007, A117165, A48951, A65803, A56083 and preceding reports
which are compiled by these
4. TEM ASX announcement dated 10 March 2022 “Euro Update - Lithium Potential Identified”
5. Various DMIRS WAMEX Reports and compiled datasets from previous operators
6. TEM ASX announcement dated 29 June 2021 "Multiple New Targets at the Euro"
7. TEM ASX announcement dated 8 July 2021 "Iron rich formations identified at the Euro Project"
8. TEM ASX announcement dated 28 July 2021 "Additional Iron Targets At Euro"
9. TEM ASX announcement dated 9 November 2021 ”Euro Exploration Update - Drilling Commenced"
10. TEM ASX announcement dated 24 January 2022 "Euro Exploration Update - Sulphides intersected in
drilling"
11. TEM ASX announcement dated 16 February 2022 "Euro Exploration Update - Further Sulphides Within
Broader Mineralised Corridor"
12. TEM ASX announcement dated 08 June 2022 “Tempest and Karara Mining Limited sign Joint Venture
MOU”
13. TEM ASX announcement dated 15 June 2023 “Increase In Yalgoo Landholding”
14. TEM ASX announcement dated 15 March 2023 “Meleya Update - Meleya Update - 4km copper
anomaly at Remorse Target”
15. TEM ASX announcement dated 19 April 2023 “Meleya Update - Geochem anomaly extended with
Nickel and Rare Earths”
16. TEM ASX announcement dated 21 June 2023 “Yalgoo Update - Regional ElectroMagnetic Survey
Commenced”
Page 5 | 16
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint | JORC TABLE 1
Appendix B: JORC Table 1
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
●
●
●
●
Commentary
Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has been done this would be relatively
simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or mineralisation
types (eg submarine nodules) may warrant disclosure of detailed information.
●
●
●
●
●
Drilling
techniques
Drill
sample
recovery
QAQC entailed a revolving Blank/Standard/Duplicate at every 20th
sample. The field duplicate was acquired by the sampler from the
same soil profile as the original sample.
300g sample collected from the top of the B horizon and placed into
pulp bag for assay. A separate 1kg sample collected from the top of
the B horizon in the same profile collected for potential future testing
using different lab analysis. Both samples were unsieved as per lab
analysis requirements.
Sample bags were collected onsite and delivered to LabWest
Minerals Analysis in Perth by Tempest or contract personnel, and
were tested via UltraFine+ gold and multielement (50 elements)
assay method.
Soil samples are only used to determine the presence of gold plus
50 elements and are not used to determine mineral resources or
reserves.
Rock chip samples were collected in calico bags and delivered to the
West Perth facility for further scrutiny
●
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
●
N/A
●
Method of recording and assessing core and chip sample recoveries and
results assessed.
Measures taken to maximise sample recovery and ensure representative
nature of the samples.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
●
N/A
●
●
Page 6 | 16
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint | JORC TABLE 1
Logging
●
●
●
Sub-sampling
techniques and
sample
preparation
●
●
●
●
●
●
Quality of assay
data
and
laboratory tests
●
●
●
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the relevant intersections logged.
●
●
Soils were qualitatively logged, including colour and texture.
Rock chips were logged digitally using Grid software and other
online systems
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled
wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
●
N/A
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack
of bias) and precision have been established.
●
UltraFine+ analysis was used to determine gold and multi-element
content, this method was chosen as it detects low levels of Au and
multi-elements within ultrafine (< 2 μm) fraction of soil samples.
UltraFine+ Leachwell is considered a partial method as only gold
recoverable from cyanide will be reported.
Laboratory and company QAQC results were used to determine the
quality of data.
All samples were submitted to LabWest Minerals Analysis in Perth
and were multielement (50 elements) tested via UltraFine+ analysis
UFF-PE.
Rock chips were selectively kept for reference purposes or sent for
analysis at ALS for 4 acid digest ICP multi-element analysis
●
●
●
●
Page 7 | 16
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint | JORC TABLE 1
Verification of
sampling and
assaying
The verification of significant intersections by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
●
N/A
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
●
Sample point locations collected by handheld android based devices
(maximum ±4m horizontal, 12m vertical error).
Grid: Datum WGS84 UTM Zone 50S
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree
of geological and grade continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
●
Samples were located on a number of grid oriented and geologically
reasoned locations.
●
●
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Soil sample points were located perpendicular to the general strike
of geological formations when they were encountered. Most
samples were acquired in areas with little to no surface geology (soil
only, few proximal outcrops which were predominantly bedrock).
●
The measures taken to ensure sample security.
●
Sample bags were collected onsite and moved on scheduled weekly
or collections directly to the laboratory in Perth by contract
personnel.
●
The results of any audits or reviews of sampling techniques and data.
●
Results were confirmed using company-led QA/QC, with standards,
blanks and duplicates inserted every 20th sample.
●
●
●
●
Location
data points
of
●
●
●
Data
spacing
and distribution
●
●
●
Orientation of
data in relation
to
geological
structure
Sample security
Audits
reviews
or
●
Page 8 | 16
●
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint | JORC TABLE 1
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral tenement
and land tenure
status
Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites, wilderness or
national park and environmental settings.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
●
●
●
●
All soil and rock information quoted is from 100% by Warrigal Mining
Pty Ltd which is a subsidiary of Tempest Minerals Ltd.
Sampling was conducted on E5902319
No overriding interests are present to the Company’s knowledge.
Tempest acknowledges the traditional owners of the land.
●
Acknowledgment and appraisal of exploration by other parties.
●
Tempest acknowledges the work by previous explorers.
●
Deposit type, geological setting and style of mineralisation.
●
The Warriedar Fold Belt is known to comprise a folded sequence of
dolerite and gabbro intercalated with basalt, Banded Iron Formation
(BIF), sediments, and ultramafics.
●
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
○ easting and northing of the drill hole collar
○ elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
○ dip and azimuth of the hole
○ down hole length and interception depth
○ hole length.
○ If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should
clearly explain why this is the case.
●
N/A
●
●
Exploration done
by other parties
Geology
Drill
Information
hole
Commentary
Page 9 | 16
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint | JORC TABLE 1
Data aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
●
N/A
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (eg ‘down hole length, true width not
known’).
●
N/A
●
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported. These
should include, but not be limited to a plan view of drill hole collar locations
and appropriate sectional views.
●
N/A
●
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
●
N/A
●
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or contaminating substances.
●
N/A
●
The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
●
Tempest Minerals will progress further geological investigation
which may include further geochemistry, geophysics and regulatory
approvals to develop an initial drill program for the resultant target
areas.
●
●
●
Relationship
between
mineralisation
widths
and
intercept lengths
Diagrams
Balanced reporting
Other substantive
exploration data
Further work
●
●
●
●
Page 10 | 16
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint | JORC TABLE 1
Appendix C: Samples
Legacy sampling
east
nth
Alti
DEPTH
LITH1
SAMPLE_ID Sample_Type Ag_ppm As_ppm Au_ppm Cd_ppm Cu_ppm Fe_ppm Hg_ppm Li_ppm Mo_ppm Ni_ppm P_ppm
Pb_ppm Pt_ppm S_ppm
Sb_ppm Sn_ppm W_ppm Zn_ppm
484846
6769192
360
0.1
33644 SOIL
0.015
0
0.00045 0
0.99
0
0
0
0
0
0
0
0
0
0
0
0
0
485293
6769093
360
0.1
33645 SOIL
0.0205
0
0.0024
0
2.22
0
0
0
0
0
0
0
0
0
0
0
0
0
485954
6769083
360
0.1
33646 SOIL
0.0685
0
0.0308
0
5.24
0
0
0
0
0
0
0
0
0
0
0
0
0
485341
6769049
389
0.2 NR
GS01054
soil
-0.1
-5.005
0.001
0
52
0
0
0
0
55
0
9
0
0
0
0
0
27.027
485390
6769049
385
0.2 NR
GS01055
soil
-0.1
0.011
0.003
0
54
0
0
0
0
54
0
9
0
0
0
0
0
17.5175
485439
6769049
384
0.2 NR
GS01056
soil
-0.1
-5.005
0.001
0
29
0
0
0
0
28
0
7
0
0
0
0
0
9.009
485487
6769049
383
0.2 NR
GS01057
soil
-0.1
-5.005
0.003
0
30
0
0
0
0
35
0
8
0
0
0
0
0
12.5125
485536
6769049
386
0.2 NR
GS01058
soil
-0.1
-5.005
0.001
0
31
0
0
0
0
32
0
8
0
0
0
0
0
15.015
485584
6769049
389
0.2 NR
GS01059
soil
-0.1
-5.005
-0.001
0
20
0
0
0
0
20
0
8
0
0
0
0
0
13.013
485643
6769049
397
0.2 NR
GS01060
soil
-0.1
-5.005
-0.001
0
17
0
0
0
0
20
0
8
0
0
0
0
0
14.5145
485691
6769049
400
0.2 NR
GS01061
soil
-0.1
-5.005
-0.001
0
17
0
0
0
0
29
0
8
0
0
0
0
0
14.014
485740
6769049
403
0.2 NR
GS01062
soil
-0.1
-5.005
-0.001
0
12
0
0
0
0
21
0
5
0
0
0
0
0
7.5075
485789
6769049
403
0.2 NR
GS01063
soil
-0.1
-5.005
-0.001
0
11
0
0
0
0
25
0
6
0
0
0
0
0
7.5075
485837
6769049
401
0.2 NR
GS01064
soil
-0.1
-5.005
-0.001
0
14
0
0
0
0
34
0
6
0
0
0
0
0
14.5145
485886
6769049
402
0.2 NR
GS01065
soil
-0.1
-5.005
-0.001
0
18
0
0
0
0
34
0
6
0
0
0
0
0
13.5135
485934
6769049
402
0.2 NR
GS01066
soil
-0.1
-5.005
0.001
0
21
0
0
0
0
38
0
6
0
0
0
0
0
10.01
484739
6769148
376
0.2 NR
GS01083
soil
-0.1
0.01
-0.001
0
43
0
0
0
0
66
0
9
0
0
0
0
0
33.033
484787
6769148
380
0.2 NR
GS01084
soil
-0.1
-5.005
0.001
0
65
0
0
0
0
77
0
13
0
0
0
0
0
34.034
484836
6769148
384
0.2 NR
GS01085
soil
-0.1
-5.005
0.001
0
70
0
0
0
0
106
0
13
0
0
0
0
0
39.5395
484884
6769148
389
0.2 NR
GS01086
soil
-0.1
-5.005
0.002
0
67
0
0
0
0
91
0
13
0
0
0
0
0
53.053
484943
6769148
397
0.2 NR
GS01087
soil
-0.1
-5.005
0.003
0
78
0
0
0
0
72
0
11
0
0
0
0
0
46.5465
484991
6769148
401
0.2 NR
GS01088
soil
-0.1
-5.005
0.004
0
89
0
0
0
0
64
0
12
0
0
0
0
0
21.021
485040
6769148
403
0.2 NR
GS01089
soil
-0.1
-5.005
0.003
0
76
0
0
0
0
53
0
12
0
0
0
0
0
23.5235
485089
6769148
405
0.2 NR
GS01090
soil
-0.1
-5.005
-0.001
0
57
0
0
0
0
51
0
11
0
0
0
0
0
25.025
485137
6769148
406
0.2 NR
GS01091
soil
-0.1
-5.005
0.005
0
80
0
0
0
0
41
0
11
0
0
0
0
0
15.015
485186
6769148
407
0.2 NR
GS01092
soil
-0.1
-5.005
0.003
0
67
0
0
0
0
41
0
8
0
0
0
0
0
20.02
485234
6769148
405
0.2 NR
GS01093
soil
-0.1
-5.005
0.002
0
75
0
0
0
0
30
0
11
0
0
0
0
0
29.5295
485293
6769148
406
0.2 NR
GS01094
soil
-0.1
-5.005
0.001
0
71
0
0
0
0
28
0
10
0
0
0
0
0
20.5205
485341
6769148
407
0.2 NR
GS01095
soil
-0.1
-5.005
0.002
0
73
0
0
0
0
22
0
11
0
0
0
0
0
16.5165
485390
6769148
402
0.2 NR
GS01096
soil
-0.1
-5.005
0.002
0
81
0
0
0
0
25
0
10
0
0
0
0
0
19.5195
485439
6769148
396
0.2 NR
GS01097
soil
-0.1
-5.005
0.001
0
78
0
0
0
0
25
0
9
0
0
0
0
0
21.5215
485487
6769149
384
0.2 NR
GS01098
soil
-0.1
-5.005
-0.001
0
54
0
0
0
0
42
0
9
0
0
0
0
0
20.5205
485536
6769149
385
0.2 NR
GS01099
soil
-0.1
-5.005
-0.001
0
22
0
0
0
0
64
0
4
0
0
0
0
0
15.015
485584
6769149
388
0.2 NR
GS01100
soil
-0.1
-5.005
-0.001
0
9
0
0
0
0
34
0
3
0
0
0
0
0
7.5075
Page 11 | 16
ASX : TEM
2023-07-17 | Euro Precious Metal Rock Chips & Change Of Footprint | JORC TABLE 1
east
SAMPLE_ID Sample_Type Ag_ppm As_ppm Au_ppm Cd_ppm Cu_ppm Fe_ppm Hg_ppm Li_ppm Mo_ppm Ni_ppm P_ppm
Pb_ppm Pt_ppm S_ppm
Sb_ppm Sn_ppm W_ppm Zn_ppm
485643
nth
6769149
Alti
397
DEPTH
0.2 NR
LITH1
GS01101
soil
-0.1
-5.005
0.002
0
37
0
0
0
0
41
0
6
0
0
0
0
0
18.5185
485691
6769149
403
0.2 NR
GS01102
soil
-0.1
-5.005
-0.001
0
18
0
0
0
0
94
0
5
0
0
0
0
0
18.5185
485740
6769149
404
0.2 NR
GS01103
soil
-0.1
0.073
0.004
0
153
0
0
0
0
160
0
9
0
0
0
0
0
52.052
485788
6769149
406
0.2 NR
GS01104
soil
-0.1
0.182
0.007
0
46
0
0
0
0
557
0
4
0
0
0
0
0
20.5205
485837
6769149
408
0.2 NR
GS01105
soil
-0.1
0.066
0.003
0
78
0
0
0
0
411
0
5
0
0
0
0
0
27.027
485886
6769149
408
0.2 NR
GS01106
soil
-0.1
0.011
0.001
0
90
0
0
0
0
83
0
6
0
0
0
0
0
20.02
485934
6769149
407
0.2 NR
GS01107
soil
-0.1
-5.005
0.003
0
129
0
0
0
0
46
0
11
0
0
0
0
0
45.5455
485341
6769248
408
0.2 NR
GS01132
soil
0.1001
-5.005
0.003
0
123
0
0
0
0
29
0
8
0
0
0
0
0
21.5215
485390
6769
Share your feedback
Discover