New Lithium Licenses Granted
Odzi West Hard Rock Lithium Project
Dominant Land position in Zimbabwe
•
9 new Licenses granted at the Odzi West and Chisuma lithium
projects in eastern Zimbabwe
•
New Licenses further consolidates our land position over the highly
prospective pegmatites and workings at the Odzi West Project
•
Dominant land position with 59 granted Licences, representing 8 hard
rock lithium projects in the Mutare Greenstone Belt in Zimbabwe
Lithium Consolidated Ltd (“Lithium Consolidated”, “Li3” or the “Company”) is
pleased to announce the grant of 9 new Prospecting Licenses (the “Licenses”) in
eastern Zimbabwe, to establish a dominant land position at the highly prospective Odzi
West project (Figure 1) and at the Chisuma project.
The Company has established a dominant land position in eastern Zimbabwe through a
total of 72 Licenses over an area of 2,958 ha (Figure 2), where 59 have been granted
(1,800 ha) and the remainder are pending grant.
Eight (8) additional licenses were granted in the Odzi West area to further consolidate
our land position, capturing the known lithium-bearing pegmatites which have been
identified from historical data, by field reconnaissance work and satellite imagery.
An additional license was granted over the Chisuma Project to consolidate our land
position.
1. Odzi West Lithium Project
The Odzi West Project now comprises 19 granted licenses within the MGB West
exploration area within the Mutare Greenstone Belt (the “MGB”) (see Figure 1).
There are at least seven (7) interpreted clusters of artisanal and historical workings on
distinct, separate pegmatites at the Odzi West Project, with historical reports
documenting the presence of spodumene in one area of moderately extensive workings.
Field reconnaissance and satellite imagery analysis indicates that the interpreted
pegmatites could be moderately extensive as several appear to be flat-lying, with near
surface sheet-like configurations. Sizes are estimated to be between 300 x 50 m and
500 x 150m. The artisanal and historical workings have produced beryl and tantalite in
the past and appear to be currently inactive.
There are encouraging indications of pegmatites worthy of further evaluation for lithium
and tantalum potential, within several of the clusters of artisanal and historical workings
in the newly granted licences.
Figure 1
Licenses over the Odzi West Project (shown over Google satellite imagery) –
see also figure 2
2. Chisuma Project
In addition to the eight (8) licenses granted at the Odzi West project, one (1) license
was granted at the Chisuma project (Figure 2) to further consolidate our land position.
3. Zimbabwe Licenses
The Company has a total of 72 Licenses covering an area 2,958 ha, with 59 granted
Licenses covering an area of 1,800 ha and 13 License applications which are pending
grant and cover an area of 1,158 ha.
Figure 2
Eastern Zimbabwe Lithium Exploration Projects including new licenses
granted at the Odzi West and Chisuma projects (shown over Google satellite
imagery)
4. Location of Zimbabwe Lithium Projects
The Company has secured eight (8) lithium exploration projects in the MGB (Figure 2),
located close to the border-town of Mutare in eastern Zimbabwe (the “Zimbabwe
Projects”) (Figure 3).
The Zimbabwe Projects are 300km from the port of Beira in Mozambique and
approximately 60km from the Mutare Railhead on the border between Zimbabwe and
Mozambique, which is connected to the port of Beira in Mozambique by the operating
Mutare-Beira railway line.
Figure 3
Zimbabwe Hard Rock Lithium Projects and Infrastructure (shown over
Google satellite imagery)
End
For more information, please contact:
Duncan Cornish
Company Secretary
Phone: +61 7 3212 6299
Please visit us at: http://www.li3limited.com
Cautionary Statements
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are
only predictions, based on certain assumptions and involve known and unknown risks,
uncertainties and other factors, many of which are beyond the company’s control.
Actual events or results may differ materially from the events or results expected or
implied in any forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty
or prediction with respect to the accuracy of the underlying assumptions or that any
forward-looking statements will be or are likely to be fulfilled. The Company undertakes
no obligation to update any forward-looking statement to reflect events or
circumstances after the date of this document (subject to securities exchange disclosure
requirements).
The information in this document does not take into account the objectives, financial
situation or particular needs of any person or organisation. Nothing contained in this
document constitutes investment, legal, tax or other advice.
Competent Person’s Statement:
The information in this announcement that relates to the geological descriptions of the
Zimbabwe Projects is based on information reviewed and compiled by Michael
Cronwright, a Competent Person who is a fellow of The Geological Society of South
Africa and Pr. Sci. Nat. (Geological Sciences) registered with the South African Council
for Natural Professions. Mr Cronwright is a Principal Consultant with CSA Global in South
African. Mr Cronwright has sufficient experience relevant to the style of mineralisation
and type of deposit under consideration and to the activity he is undertaking to qualify
as a Competent Person as defined in the 2012 Edition of “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Cronwright
consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
LITHIUM CONSOLIDATED LTD
ACN 612 008 358
Phone: +61 7 3212 6299
Fax: +61 7 3212 6250
Address: Level 6, 10 Market Street, Brisbane Q 4000
Appendix 1:
JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling techniques
Nature and quality of sampling
(eg cut channels, random
chips, or specific specialised
industry standard
measurement tools appropriate
to the minerals under
investigation, such as down
hole gamma sondes, or
handheld XRF instruments,
etc). These examples should
not be taken as limiting the
broad meaning of sampling.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Include reference to measures
taken to ensure sample
representivity and the
appropriate calibration of any
measurement tools or systems
used
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Aspects of the determination of
mineralisation that are Material
to the Public Report.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
In cases where ‘industry
standard’ work has been done
this would be relatively simple
(eg ‘reverse circulation drilling
was used to obtain 1 m
samples from which 3 kg was
pulverised to produce a 30 g
charge for fire assay’). In other
cases more explanation may
be required, such as where
there is coarse gold that has
inherent sampling problems.
Unusual commodities or
mineralisation types (eg
submarine nodules) may
warrant disclosure of detailed
information
Drilling techniques
Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger,
Bangka, sonic, etc) and details
(eg core diameter, triple or
standard tube, depth of
NA, no drilling has been
completed.
Criteria
JORC Code explanation
Commentary
diamond tails, face-sampling
bit or other type, whether core
is oriented and if so, by what
method, etc).
Drill sample recovery
Logging
Sub-sampling
techniques and sample
preparation
Method of recording and
assessing core and chip
sample recoveries and results
assessed.
NA, no drilling has been
completed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
NA, no drilling has been
completed.
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
NA, no drilling has been
completed.
Whether core and chip samples
have been geologically and
geotechnically logged to a level
of detail to support appropriate
Mineral Resource estimation,
mining studies and
metallurgical studies.
NA, no drilling has been
completed.
Whether logging is qualitative
or quantitative in nature. Core
(or costean, channel, etc)
photography.
NA, no drilling has been
completed.
The total length and
percentage of the relevant
intersections logged.
NA, no drilling has been
completed.
If core, whether cut or sawn
and whether quarter, half or all
core taken.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
If non-core, whether riffled,
tube sampled, rotary split, etc
and whether sampled wet or
dry.
For all sample types, the
nature, quality and
Criteria
JORC Code explanation
Commentary
appropriateness of the sample
preparation technique.
Quality of assay data
and laboratory tests
Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Measures taken to ensure that
the sampling is representative
of the in situ material
collected, including for
instance results for field
duplicate/second-half
sampling.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Whether sample sizes are
appropriate to the grain size of
the material being sampled
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and whether
the technique is considered
partial or total.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the
parameters used in
determining the analysis
including instrument make and
model, reading times,
calibrations factors applied and
their derivation, etc.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Nature of quality control
procedures adopted (eg
standards, blanks, duplicates,
external laboratory checks)
and whether acceptable levels
of accuracy (ie lack of bias)
and precision have been
established.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Criteria
JORC Code explanation
Commentary
Verification of sampling
and assaying
The verification of significant
intersections by either
independent or alternative
company personnel.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
The use of twinned holes.
Location of data points
Data spacing and
distribution
Documentation of primary
data, data entry procedures,
data verification, data storage
(physical and electronic)
protocols.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Discuss any adjustment to
assay data.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Accuracy and quality of
surveys used to locate drill
holes (collar and down-hole
surveys), trenches, mine
workings and other locations
used in Mineral Resource
estimation.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Specification of the grid
system used.
All coordinates are recorded in
the southern Africa ARC 1950
datum, UTM 36 South Zone,
unless otherwise specified.
Quality and adequacy of
topographic control
For the purposes of the
current exploration public
domain satellite imagery was
used and is considered
suitable
Data spacing for reporting of
Exploration Results.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Whether the data spacing and
distribution is sufficient to
establish the degree of
geological and grade continuity
appropriate for the Mineral
Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Whether sample compositing
has been applied.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Criteria
JORC Code explanation
Commentary
Orientation of data in
relation to geological
structure
Whether the orientation of
sampling achieves unbiased
sampling of possible structures
and the extent to which this is
known, considering the deposit
type.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to
have introduced a sampling
bias, this should be assessed
and reported if material.
N/A. No drilling has been
completed.
Sample security
The measures taken to ensure
sample security.
N/A, No samples have been
submitted for analysis from
Odzi West or Chisuma to date.
Audits or reviews
The results of any audits or
reviews of sampling techniques
and data.
No audits or reviews have
been done at this stage.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation Commentary
Mineral tenement and
land tenure status
Exploration done by
other parties
Type, reference
name/number, location and
ownership including
agreements or material
issues with third parties
such as joint ventures,
partnerships, overriding
royalties, native title
interests, historical sites,
wilderness or national park
and environmental settings.
See Appendix 2
The security of the tenure
held at the time of reporting
along with any known
impediments to obtaining a
licence to operate in the
area.
The granted Prospecting
Licenses have been secured
in compliance with the Laws
of Zimbabwe.
Acknowledgment and
appraisal of exploration by
other parties.
No systematic exploration
of the licences has taken
place in the past. The
licences do contain
historical and artisanal
workings that have
There are no known
impediments to securing
the Prospecting Licenses
which are pending grant.
Criteria
JORC Code explanation
Commentary
produced beryl and tantalite
in the past.
Geology
Deposit type, geological
setting and style of
mineralisation.
The pegmatites within the
project areas include Li-TaCs (LCT) type pegmatites
which may contain lithium
mineralisation in the form of
spodumene, petalite and/or
lepidolite which will need to
be confirmed through a
systematic exploration
programme.
These pegmatites are
Archaean in age and hosted
in slightly older Archean
greenstones and metasediments in the region.
Drill hole Information
A summary of all
information material to the
understanding of the
exploration results including
a tabulation of the following
information for all Material
drill holes:
easting and northing of
the drill hole collar
elevation or RL (Reduced
Level – elevation above
sea level in metres) of
the drill hole collar
dip and azimuth of the
hole
down hole length and
interception depth
hole length.
If the exclusion of this
information is justified on
the basis that the
information is not Material
and this exclusion does not
detract from the
understanding of the report,
the Competent Person
should clearly explain why
this is the case.
NA, no drilling has been
completed.
Criteria
JORC Code explanation
Commentary
Data aggregation
methods
In reporting Exploration
Results, weighting
averaging techniques,
maximum and/or minimum
grade truncations (eg
cutting of high grades) and
cut-off grades are usually
Material and should be
stated.
N/A, no weighting
techniques have been used.
Where aggregate intercepts
incorporate short lengths of
high grade results and
longer lengths of low grade
results, the procedure used
for such aggregation should
be stated and some typical
examples of such
aggregations should be
shown in detail.
N/A, no aggregations have
been used.
The assumptions used for
any reporting of metal
equivalent values should be
clearly stated.
N/A, no values have been
reported for Odzi West or
Chisuma.
These relationships are
particularly important in the
reporting of Exploration
Results.
N/A, no drilling has been
completed.
Relationship between
mineralisation widths
and intercept lengths
If the geometry of the
mineralisation with respect
to the drill hole angle is
known, its nature should be
reported.
If it is not known and only
the down hole lengths are
reported, there should be a
clear statement to this
effect (eg ‘down hole
length, true width not
known’).
Diagrams
Appropriate maps and
sections (with scales) and
tabulations of intercepts
should be included for any
significant discovery being
reported. These should
include, but not be limited
to a plan view of drill hole
See document for locality
maps of the licences.
Criteria
JORC Code explanation
Commentary
collar locations and
appropriate sectional views.
Balanced reporting
Where comprehensive
reporting of all Exploration
Results is not practicable,
representative reporting of
both low and high grades
and/or widths should be
practiced to avoid
misleading reporting of
Exploration Results.
N/A, nothing reported on
Odzi West or Chisuma to
date.
Other substantive
exploration data
Other exploration data, if
meaningful and material,
should be reported including
(but not limited to):
geological observations;
geophysical survey results;
geochemical survey results;
bulk samples – size and
method of treatment;
metallurgical test results;
bulk density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or
contaminating substances.
A high-level desktop study
has been done as well as
detailed interpretation of
satellite imagery was used
to determine old workings,
exposed and sub-cropping
pegmatites.
The nature and scale of
planned further work (eg
tests for lateral extensions
or depth extensions or
large-scale step-out
drilling).
LCME plans to undertake a
systematic exploration
programme on the projects
and is currently in the
planning phase of this work.
This includes a data review,
mapping and preliminary
rock chip and grab sampling
to establish the presence of
lithium bearing pegmatites.
Further work
Diagrams clearly
highlighting the areas of
possible extensions,
including the main
geological interpretations
and future drilling areas,
provided this information is
not commercially sensitive.
The CP has visited the
licences comprising the Tals
5 and Nels Luck and Bepe
projects. But has not
visited any of the other
licences comprising the
other projects
Appendix 2: Zimbabwe Prospecting Licenses
Project
Prospecting
Licence
(Claim No)
Area
(ha)
Status
1
Tals 5
018123A
140
Granted
2
Nels Luck
018121A
110
Granted
019060AA
23
Granted
019061AA
22
Granted
019062AA
17
Granted
019270 AA
24
Granted
019271 AA
12
Granted
3
4
5
6
Bepe
Magoda
Day Dawn
Chisuma
019272 AA
25
Granted
018151A
75
Granted
018152A
141
Granted
019037AA
25
Granted
019038AA
25
Granted
019039AA
25
Granted
019040AA
25
Granted
031978 AA
25
Granted
031979 AA
24
Granted
031980 AA
25
Granted
031981 AA
20
Granted
031982 AA
25
Granted
031983 AA
25
Granted
031984 AA
25
Granted
019258 AA
24
Granted
018207 A
17
Granted
018122 A
150
Granted
018153A
142
Pending
018154A
131
Pending
018155A
149
Pending
018156A
80
Pending
018157A
90
Pending
018158A
116
Pending
018159A
105
Pending
018160A
115
Pending
019126AA
19
Granted
019421AA
22
Granted
019422AA
20
Granted
019423AA
14
Granted
019118AA
25
Granted
019120AA
25
Granted
019121AA
25
Granted
019122AA
24
Granted
019123AA
25
Granted
Project
7
8
Grey Lady
Odzi West
Prospecting
Licence
(Claim No)
Area
(ha)
Status
019362AA
25
Granted
019119 AA
24
Granted
019124 AA
23
Granted
019125 AA
22
Granted
019255 AA
14
Granted
019256 AA
17
Granted
019257 AA
8
Granted
019292 AA
25
Granted
019293 AA
19
Granted
019294 AA
25
Granted
019295 AA
18
Granted
019296 AA
18
Granted
019297 AA
15
Granted
019298 AA
22
Granted
019299 AA
23
Granted
019300 AA
21
Granted
019301 AA
24
Granted
019302 AA
24
Granted
019686 AA
25
Granted
019687 AA
25
Granted
019688 AA
23
Granted
019689 AA
23
Granted
019690 AA
23
Granted
019691 AA
21
Granted
019692 AA
20
Granted
019693 AA
25
Granted
019694 AA
25
Pending
019695 AA
25
Pending
019696 AA
25
Pending
9
Chifamba
031623 AA
75
Pending
10
Sutswe
031624 AA
80
Pending
Share your feedback
Discover