2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
TEM | Euro Exploration Update - Further Sulphides Intersected Within Broader
Mineralised Corridor
Key Points
●
●
●
●
Further thick zones of sulphides intersected in remaining holes
Drilling completed with three areas tested and further drilling in planning
Historic and current drilling shows >1 kilometre mineralised corridor
Laboratory results due in Q1 2022
News Item
Tempest Minerals Ltd (TEM) is pleased to announce additional drillholes have intersected substantial
mineralisation at the Euro Project.
Downhole geology from the new drilling has been correlated with
historical work and has now been interpreted to be part of a larger mineralised zone which extends over
several kilometres. With the completion of drilling at the Euro Project, three areas were tested for a total of
approximately 890m of diamond drilling.
Figure 1: Semi-massive sulphides over approximately 1m in WARDH71 (64-65m)
Euro Project
Drilling Update
Drilling for this campaign at Euro has been concluded, with three target areas tested for a total of
approximately 890m of diamond drilling. The drillcore in the final holes (WARDH70 and 71) is currently being
logged and sampled and will be submitted for multi-element analysis shortly.
The extensive mineralisation and favourable geology encountered within the drilling to date is encouraging
and potentially correlates well with historical drilling results. The geology and alteration assemblages are
indicative of large mineralising systems such as skarn or volcanogenic massive sulphides (VMS).
TEM are awaiting assays from the current drilling and planning for follow up drilling is currently in progress.
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
Figure 2: Euro project drilling areas with mineralisation correlated over >1km
Geology
The Euro Project comprises part of the southern Yalgoo Greenstone belt with primary host rock stratigraphy
of ultramafic, mafic and felsic volcanic and sedimentary sequences including banded iron-formations (BIF).
These are comparable to those that host major nearby deposits including Karara, Rothsay and Mount
Mulgine.
The region has multiple generations of deformation including folding and shearing which can be observed
clearly in geophysical models and in the field. The major folding system appears northwest–southeast with
remnants of a later phase of refolding striking north–south and east–west. Multiple generations of shearing
are also present, including offsets of fold axial planes. At least two of the shearing events appear relevant to
the presence of gold mineralisation at the nearby Rothsay Mine as well as the Euro Project.
The recently completed drilling program is targeting areas known to host gold within quartz sulphide veins
within a larger associated alteration system.
Page 2 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
Background
The Euro Project is 176 km2 of 100% owned tenements within the exciting
Warriedar exploration portfolio in the Yalgoo region of Western Australia
which totals more than 900 km2 (>604 km2 granted and 311 km2 of
pending). The Euro Project is an underexplored geological terrain located
between several in development or producing operations including Karara
(Iron), Shine (Iron), Mt Mulgine (Gold/Tungsten) and Rothsay
(Gold/Copper).
Parts of the project were explored in the 1990s and early 2000s for gold
and iron ore. Reconnaissance drilling in the north of the project area
encountered significant gold mineralisation. Due to depressed metal
prices, they were not considered priority and not followed up with targeted
drilling.
The recent drilling at the Euro Project was aimed at extending new and
previously known zones of mineralisation with significant historic drill
results 1 including:
NR017:
17m @ 1.2g/t from 20m
NR018:
15m @ 2.3 g/t (including 7m @ 3.4g/t) from 15m
MBRB021A:
9m @ 1.2 (including 2m @11.4) from 0m (surface)
Next Steps
- Laboratory results due Q1 2022
- Further drilling planning and approvals in progress
- Siteworks for Exploration Incentive Scheme (EIS) co - funded drill program in progress
Page 3 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian based mineral exploration company with a diversified portfolio of projects in
Western Australia considered highly prospective for precious, base and energy metals.
The Company has an experienced board and management team with a history of exploration, operational and
corporate success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to
maximize shareholder value through focussed, data-driven, risk-weighted exploration and development of our
assets.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
www.tempestminerals.com
LinkedIn
Instagram
Twitter
+61 89200 0435
Facebook
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on
certain assumptions and involve known and unknown risks, uncertainties and other factors, many of which are
beyond the company’s control. Actual events or results may differ materially from the events or results expected or
implied in any forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to
the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be
fulfilled. Tempest undertakes no obligation to update any forward-looking statement to reflect events or
circumstances after the date of this document (subject to securities exchange disclosure requirements).
The information in this document does not take into account the objectives, financial situation or particular needs
of any person or organisation. Nothing contained in this document constitutes investment, legal, tax or other
advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project comments is based
on information compiled by Don Smith who is the Managing Director of Tempest Minerals Ltd. Mr Smith is a
Member of AusIMM and AIG and has sufficient experience relevant to the style of mineralisation under
consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Smith
consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
Page 4 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
Appendix A: References
1. TEM ASX announcement dated 24 January 2022 “Euro Exploration Update - Sulphides intersected in
drilling”
Page 5 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
Appendix B: Diamond Drill hole Data Summary
Hole
mE
mN
Actual
Depth
Azi
Dip
Geology
Area A
WARDH0065
483480
6769410
78
045
-60
Banded iron formation, hydrothermal quartz and altered sediments possible skarn alteration – garnets, pyroxene, magnetite, pyrrhotite, pyrite.
WARDH0066
483490
6769390
75.5
045
-60
Banded iron formation, hydrothermal quartz and altered sediments possible skarn alteration – garnets, pyroxene, magnetite, pyrrhotite, pyrite.
WARDH0067
483600
6769430
37.6
180
-60
Follow up on 0.7g/t Au intersects in MDR165 + 166.
Volcaniclastic/sedimentary sequence intersected. Hole aborted within the
oxide zone due to drill rig malfunction.
Area C
WARDH0068
483280
6770350
166.4
090
-60
Follow up on broad historical gold intersections in nr18 nr19 nr20. Drilling
intersected basalt overlying a volcaniclastic/sedimentary rock sequence
from 101m including siltstones and fine grained sandstones. Stringer
veins of quartz±carbonate±sericite or quartz±chlorite±biotite are
associated with pyrrhotite, pyrite and chalcopyrite.
WARDH0069
483250
6770350
18.3
090
-60
Drill hole aborted. Significant core loss within inferred mineralised zone.
WARDH069A
483250
6770350
114.4
090
-60
Drill hole logging and sampling not yet complete. Follow up on broad
historical gold intersections in nr18 nr19 nr20. Metamorphosed, sheared
and fragmented basalt overlying sulphidic fine grained sedimentary rocks.
WARDH0069B
483250
6770350
29.8
090
-60
Redrill of WARDH069A. Metamorphic, sheared and fragmented basalt with
stockwork of oxidised quartz±carbonate veins believed to be a possible
host to gold mineralisation in historical drill holes.
WARDH0070
483350
6770350
6
090
-50
Basalt and fine grained sediments. Hole aborted.
WARDH0070A
483350
6770350
207.1
090
-50
Reconnaissance drill hole in area of surface shearing and dilational quartz
veining. Sequence of basalt and fine grained sediments intersected in top
half of drillhole (to 110m) with chl+/- biotite altered fine grained sulfidic
sedimentary rocks from 110m to the end of hole. Pyrrhotite and pyrite
strongly associated with quartz-chlorite-biotite veins and disseminated
throughout the rock. Alteration is strongest in sedimentary rocks, with
minor sulfide seen within basalt.
Area B
WARDH0071
483270
6769675
156.4
270
-60
Follow up on 12.4g/t Au in MBRB019 (anomalism 8-16m).
Silicified banded iron formation, sediments and basalts with disseminated
sulphides (pyrite, pyrrhotite and arsenopyrite until end of hole. Intermittent
veins of semi massive sulphide sections including 1m of massive
pyrhhotite at 64m.
Notes: All drill holes are HQ or NQ triple tube. Co-ordinate grid is MGA94, Zone 50S
Page 6 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
Appendix C: JORC Table 1
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
●
●
●
●
Drilling
techniques
Drill sample
recovery
●
●
●
●
Commentary
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
●
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if
so, by what method, etc).
●
●
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
●
●
●
●
●
●
●
●
●
●
●
Diamond drilling - sawn HQ and NQ drill core with half the core cut by diamond saw and bagged into calicos at intervals
as determined by logged geology.
No other measurement tools other than directional survey tools have been used in the holes at this stage.
Diamond drilling used 3m length barrels which are then marked in one metre intervals based on the core block
measurement.
Drill core was measured, oriented and marked up in the field before being transported to the company’s core
processing facilities in West Leederville for sampling.
Oriented core was placed in an orientation rack with a line drawn along the core. This was used to ensure
representativeness of samples when cutting.
Samples will be dispatched to an accredited laboratory (Intertek) in Perth, Western Australia for sample preparation
and shipment to analysis
Diamond drilling using Custom build DDSR track mounted multipurpose rig
HQ triple tube drill string used from surface in all holes (WARDH0065-0071) changing to NQ triple tube when in fresh
rock.
All diamond drill core orientated using Reflex ACT III Orientation Tool.
Core measured using standard measuring tape. Length of core is then compared to recorded interval drilled from core
blocks placed in trays at end of runs.
All care taken to obtain 100% core recovery (HQ & NQ triple tube); core trays photographed wet and dry
Not known at this stage: more drilling is required to establish if there is any sample bias.
Intermittent core loss was present in fracture zones
Core loss was recorded in several holes where drilling technique was suboptimal
Page 7 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
Logging
●
●
●
Sub-samplin
g
techniques
and sample
preparation
●
●
●
●
●
●
Quality of
assay data
and
laboratory
tests
●
●
●
Verification
of sampling
and
assaying
●
●
●
●
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
The total length and percentage of the relevant intersections
logged.
●
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
●
●
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
●
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
●
●
●
●
●
●
●
●
●
●
●
●
Diamond drilling - All HQ/NQ drill core is photographed, core recovery calculated; core marked up along the orientation
line, and logged by experienced geologists familiar with the style of deposit and stratigraphy.
Magnetic susceptibility is measured as an average of each metre sample of core.
The percentage of visible sulphide (pyrrhotite, pyrite, chalcopyrite) is estimated for each significant geological unit.
Specific gravity (S.G.) collected for representative samples of each rock type.
Geological logging is both qualitative and quantitative. Lithology, alteration, mineralisation, veins and structural data is
captured digitally and stored in the database.
Core cut to half core with repeat samples cut to quarter core using diamond saw.
Diamond drill core half sawn by Sandvik blade, then sampled at 1m intervals, or as determined by geological contacts
by breaking with rock hammer into standard calico bags (2-3kg sample) and submitted to Intertek, Perth, W.A..
Standard Western Australian sampling techniques applied. There has been no statistical work carried out at this stage.
It is unknown whether the sample sizes are appropriated to the grain size of the material being sampled.
Blanks, duplicate or standards are inserted, alternating, every 20th sample.
Duplicate samples are submitted as quarter core samples.
All diamond samples were prepared using standard crushing and pulverising (to -75#) at Intertek, Perth, W.A.. From the
3-4kg pulp s subsample is then subjected to four acid digest and these are assayed by method 4AMS48 (multi-element
analysis) and 50g fire assay with ICP-AES finish
Standard Intertek protocols re blanks, standards and duplicates applied.
The use of hand held XRF, XRD, magnetometers and other tools are in progress.
Referee sampling has not yet been carried out
Drill holes WARDH0068, 0069A and 0071 were positioned to intersect historical gold intersects. No assays have been
returned or reported to date to verify historical data.
Geological logging is completed immediately into a locked spreadsheet. All data entry is carried out by qualified
personnel. Standard data entry is used on site, and is backed up directly to a cloud based database.
Page 8 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
Location of
data points
●
●
●
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
●
●
●
●
Data
spacing and
distribution
●
●
●
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
●
●
●
●
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
Drill hole locations collected by hand held Garmin GPS (±3m horizontal, up to 12m vertical error). Down hole surveys
have been carried out by DDSR Australia using Reflex Multi Shot Survey Camera, and core orientation using Reflex ACT
III Orientation Tool.
Grid: MGA94 Datum UTM Zone 50S
A DEM topographic model of the Euro Project area was completed using a drone in 2021,, with accuracy of less than
±2m for easting and northings and less than ±1m vertically.
Elevation of drill holes was collected using the DGPS above for drill holes WRC001-006 and by hand held GPS for all
other drill holes. Those drill holes which did not conform with the DEM model, were adjusted so the collar position fit
the DEM model.
Not relevant to the current drilling.
Drill holes were placed based on geological targeting and were spaced according to geology and historical gold
intersects of each target.
Sampling was undertaken through all potential mineralisation zones (banded iron formation, skarn altered rock and
structural zones) with contacts determined by geological contacts or sulfide density. Sampling was usually at 1m
intervals.
No compositing was applied
●
●
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed and
reported if material.
●
The measures taken to ensure sample security.
●
Core was collected onsite and moved on scheduled weekly or fortnightly collections to a processing facility in Perth
where it is cut and transported directly to Intertek laboratories by Tempest or contract personnel.
●
The results of any audits or reviews of sampling techniques
and data.
●
No audits have been been completed at this time
●
●
The understanding of the structure and geology intersected in drilling is in progress and accurate true widths cannot be
assumed at this time.
Several drill holes were drilled nearby historic percussion drilling and intersected similar widths indicating possible
continuity which may be used to assist in inference of true thicknesses
Page 9 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
Section 2 Reporting of Exploration Results
Criteria
Mineral
tenement and
land
tenure
status
JORC Code explanation
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
●
●
All results quoted are from (what is now) E5902319. This lease is owned 100% by Warrigal Mining Pty Ltd which is a
subsidiary of Tempest Minerals Ltd.
No overriding interests are present to the Company’s knowledge.
Approval was given for the current drilling in November 2021 as reported by Tempest TEM ASX announcement dated 25
October 2021 ”Euro Exploration Update - Drilling Approval”
Tempest acknowledges the traditional owners of the land, the Widi Mob who have performed heritage clearance surveys
across the planned drill program areas.
The project is on managed land and has been approved by DBCA and DMIRS under Program of works (POW) #97237
●
Acknowledgment and appraisal of exploration by other
parties.
●
Tempest acknowledges the significant work by previous explorers Normandy, Aztec, Karara, Gindalbie, Minjar.
●
Deposit type, geological setting and style of mineralisation.
●
The Euro Project comprises primarily ultramafic, mafic and felsic stratigraphy with banded iron-formations (BIF), which
forms part of the southern Yalgoo Greenstone belt. Both the mafic/ultramafic sequences – which include Rothsay and
Mount Mulgine deposits e.g. Black dog – and the BIF at Karara 3 are known to host gold throughout the region.
The stratigraphy has been disrupted by several generations of deformation as evidenced by macro scale folding seen in
geophysics and aerial imagery. The major folding system appears northwest–southeast with remnants of a later phase
of refolding striking north–south and east–west. Multiple generations of shearing are also present, including offsets of
fold axial planes. At least two of the shearing events appear relevant to the presence of gold mineralisation at the nearby
Rothsay Mine as well as the Euro Project.
The current drilling program primarily targetted gold within quartz veins and surrounding altered rocks, or associated
with massive sulphides, 4 which outcrop as weathered gossanous stock and boxwork.
●
●
Exploration
done by other
parties
Geology
Commentary
●
●
●
●
●
Page 10 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
Drill
hole
Information
Data
aggregation
methods
●
A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
○
easting and northing of the drill hole collar
○
elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
○
dip and azimuth of the hole
○
down hole length and interception depth
○
hole length.
○
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent Person
should clearly explain why this is the case.
●
No assay results have been received at this stage. However, a draft table of current drill holes with notes regarding
geology is supplied in Appendix B of this document.
●
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
●
No aggregation has been used to the Company’s knowledge, all results are percussion quoted in metres where simple
averaging is utilised.
No metal equivalents have been used.
These relationships are particularly important in the reporting
of Exploration Results.
If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect (eg
‘down hole length, true width not known’).
●
The geometry of the geology is not clearly definite at this stage of exploration. Much of Tempest's current drilling
program is designed to provide structural data to augment the legacy drilling results.
●
Appropriate maps and sections (with scales) and tabulations
of intercepts should be included for any significant discovery
being reported. These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
●
See appended figure(s)
●
Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and high
●
Approximately 400 holes (historical) have been drilled into the northern section of the Euro Project. Reporting of all of
these in entirety is not practicable in this format. A selection of all results using a 0.5 gpt Au cutoff are listed in the
appendices of the TEM announcement dated Nov 09 2021 regarding this matter.
●
●
Relationship
between
mineralisation
widths
and
intercept
lengths
Diagrams
Balanced
reporting
●
●
●
●
Page 11 | 12
ASX : TEM
2022-02-16 | Further Sulphides Intersected Within Broader Mineralised Corridor
grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
Other
substantive
exploration
data
Further work
●
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological
observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious
or contaminating substances.
●
The extensive records of legacy geological, geophysical and geochemical work performed by previous explorers is
impractical to list in this format but is accessible publicly on the Western Australian State Government ‘WAMEX’ system.
●
The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations and
future drilling areas, provided this information is not
commercially sensitive.
●
The planned program will consist of diamond drilling and will test and extend areas of known mineralisation and test
new drill targets. Detailed observations will provide improved geological understanding of these zones, which can be
used to further the project.
●
Page 12 | 12