Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX : TEM
2022-07-28 | Quarterly Report June 2022
TEM | Quarterly Report - Period Ending 30 June 2022
Key Points
●
Meleya Project:
○
○
Orion target:
■
■
EIS Funding for first drill holes into entirely new province
Data continues to be collected on the 2 drill holes
■
■
All samples now submitted to laboratory for analysis
First batches received confirmed presence of copper and other base metals
■ DHEM Survey conducted
Works in preparation:
●
■ Multiple geophysics programs
■ Multiple drilling programs across the mineralised belt
Euro Project
●
○ JV (non-binding) signed with Karara Mining to explore adjacent tenements
○ Gold and polymetallic mineralisation confirmed at Calais target
○ Further drilling and other works in progress
Rocky Hill Project
○
○
Multiple geochem anomalies detected
Application for Increase of tenure
Projects
Yalgoo Region
Tempest has 4 exciting project areas in the Yalgoo region of Western Australia totalling more than 900km2.
The projects are located within the prolific Yalgoo Greenstone Belt which hosts a number of world class
mines. Tempest has used data driven processes to identify poorly or unexplored areas of highly prospective
geology which includes multiple instances of proven mineralisation.
Figure 01: Overview of the TEM Yalgoo Projects
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Meleya
The Meleya project is a previously unrecognised part of the Warriedar Fold Belt
with outcropping supracrustal mafic and felsic ‘greenstone’ units wrapped around
felsic to intermediate intrusions known as the Walganna Suite. This setting is
considered highly favourable for the formation of high grade Volcanogenic Massive
Sulphide (VMS) and IRG deposits and Lode Hosted / Orogenic vein style gold.
Tempest has previously demonstrated the extensive prospectivity of this project
01
and extended its holding with additional tenure applications to the north and east.
Figure 02: Evolution of the Meleya Project (Legacy map, outcrop, 2021 interpreted geology and targets)
Tempest was successful in its application in round 24 of the Western Australian Government’s highly
competitive Exploration Incentive Scheme. The Exploration Incentive Scheme (EIS) is a Western Australia
Government initiative which has been providing a funding mechanism for research based geoscience
(including drilling) with aims to stimulate increased private sector resource exploration and new discoveries”.
This will allow up to $150,000 towards co-funded drilling at the Meleya Project
02
.
Tempest announced in March 2022 the granting of several tenements totalling approximately 204km2 which
essentially doubled the size of the Meleya Project
03
. This new tenure includes known outcrops of up to
59.6% Iron and anomalous gold in soils, neither of which have been followed up with exploration.
Page 2 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Figure 03: Overview of the Meleya Project
Orion Target
In February, Tempest commenced a
04, 05
drilling program at the Meleya Project, consisting of 2 x deep
diamond drill holes for a total of 1,730.5m. The purpose of the program was to drill a coherent cross section
of the newly identified extension of the Yalgoo Greenstone belt to develop a strong understanding of the
stratigraphy to assist with future exploration in the new mineral province. The two drill holes were also
designed to test a correlative geochemical and magnetic anomaly known as the Orion Target.
Drill holes WARDH72 and WARDH73 were drilled to a final depth of 709.1 metres and 1021.4 metres
respectively and both intersected multiple zones
06, 07
of mineralisation including copper and other metal
bearing sulphides.
Assay results reported in July 2022 confirmed the presence of copper and other base metals. TEM are
excited by these results as it proves the fertility of the region and the justification of extensive further
exploration across the entirely new unexplored mineral field.
A Downhole ElectroMagnetic (DHEM) geophysical survey on WARDH72 and WARDH73 was completed in
July 2022
08
and the results of this survey are expected to highlight any nearby offhole conductors to the drill
holes, confirm the presence of the logged mineralisation and provide a ‘signature’ that can be used for future
exploration and drilling.
Page 3 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Figure 04: Plan View of holes WARDH72 and WARDH73 at the Orion target shown on Geophysical
Aeromagnetic Survey (TMI-sun45)
Figure 05: Cross-section along WARDH072 and WARDH073 highlighting geology (hole trace) against
sulphide mineralisation intensity (cylinders)
Page 4 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Euro
Background
The Euro Project comprises four (4) 100% Tempest owned tenements (more
than 176km2) within the prospective Southern Yalgoo Greenstone Belt located
between the neighbouring Rothsay (Gold), Mt Mulgine (Tungsten/Gold) and the
Karara (Iron/Gold) Mines. The project has thick gold intercepts in legacy drilling,
however due to depressed metal prices at the time were never thoroughly
assessed by previous owners. While most of the greater Euro Project remains
unexplored or unexplored, significant gold mineralisation has been recorded
previously in the north of the project but not thoroughly tested for continuity.
Tempest had a strong flow of exploration activity at the Euro Project in 2021
including multiple fieldwork campaigns
09-11
, discovery of iron rich geology and
the recognition of lithium potential at the project
12
through the Company’s data
analysis. Tempest continues to evaluate methods to explore this phenomenon further.
Figure 06 Pegmatite outcrops at the Euro Project after Price et al 2020
Page 5 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Drilling
TEM completed an initial reconnaissance diamond drilling program in early 2022
13-15
which tested several
new targets, in addition to testing the historic thick, high grade intercepts previously drilled at the Calais
target.
Drilling at the project encountered broad zones of strong alteration (chlorite, biotite, albite and garnet with
visible mineralisation of quartz breccias) consistent with historic gold results in addition to zones which
included sulphides
16
as part of skarn or vms like alteration. In February 2022 Tempest announced that
further mineralisation including further sulphides had been encountered in drilling and that this was indicative
of a larger mineralised corridor
17
.
In May 2022, TEM announced the results from this initial drilling with an extensive array of results spanning
multiple commodities
18
including:
Gold
WARDH71:
0.6m @ 0.9gpt gold from 15.4m; and
1.0m @ 1.0gpt gold from 58m; and
2.9m @ 4.1gpt gold from 130m
Including 1.6m @ 6.9gpt gold from 131.3m
0.9m @ 3.2gpt gold from 144m
WARDH67:
1.2m @ 0.5gpt gold from 8m; and
0.8m @ 1.7gpt gold from 9.2m
WARDH66:
0.9m @ 0.7gpt gold from 19.1m
1.0m @ 0.8gpt gold from 54m
WARDH65:
1.4m @ 0.9gpt gold from 10.8m
Figure 07: WARDH71 Cross-section showing newly discovered high-grade gold shoot with 1.6m
intersection at 6.9g/t Au
Page 6 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Base Metals
WARDH71:
3.6m @ 0.16% arsenic from 12.4m; and
0.6m @ 0.12% copper from 15.4m
1.0m @ 0.14% copper from 153m
2.5m @ 0.15% copper from 163m:
WARDH70A:
0.5m @ 630ppm tungsten from 24.3m
WARDH69:
0.6m @ 640ppm tungsten from 77.4m
WARDH68:
0.1m @ 0.4% copper from 164.1m
WARDH67:
0.9m @ 0.11% copper from 10.8m
WARDH66:
1m @ 0.35% arsenic from 60m; and
3.3m @ 0.14% zinc from 68.7m
Figure 08: Cross-section through WARDH68-WARDH70A highlighting polymetallic mineralisation
Magnetite/Iron
WARDH71:
4.0m @ 29.3% Iron from 4.9m
Including 0.9m @ 38.6% Iron from 4.9m; and
9.15m @ 30.5% Iron from 52.85; and
9.30m @ 28.4% Iron from 125.7m
13.0m @ 27.8% Iron from 152.5m
WARDH67:
1.2m @ 38.7% Iron from 4m
0.4m @ 42.5% Iron from 23.2m
WARDH66:
0.9m @ 37.8% Iron from 3.5m; and
1.0m @ 30.3% Iron from 54m
WARDH65:
2.0m @ 26.1% Iron from 37m; and
4.8m @ 25.5% Iron from 45.2m
Page 7 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Figure 09: WARDH65 Cross-section showing multiple intercepts of gold and iron mineralisation
Figure 10: Drillholes completed at the Euro Project - Jan 2022 with magnetic (TMI) imagery
Page 8 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Karara JV
In June 2022, TEM announced it had signed a Non-binding memorandum of understanding to enter into a
joint venture (JV) with Karara Mining Limited
19
.
Upon completion of the agreement, the JV will allow TEM to explore 138km2 of highly prospective and
underexplored Yalgoo Greenstone Belt directly adjacent to the Euro Project.
TEM will have the exclusive right to earn up to a 70% legal and beneficial interest in the Assets over a 4 year
earn-in period. The JV is a staged agreement - subject to normal due diligence and other conditions being
met - will entail exploration expenditure of up to $1.2M and milestone payments totalling $50,000.
Figure 11: Map showing proposed KML JV ground and TEM Euro Project
Page 9 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Messenger
The Messenger Project comprises five granted tenements located adjacent to the
world class EMR Golden Grove base and precious metal mine. The Messenger
Project has outcrops of the key Golden Grove Unit and is prospective for VMS
and shear / lode hosted gold mineralisation.
The ‘Messengers Patch’ is a well known historic mining centre hosting numerous
high-grade mines (up to 10 ounces gold per ton ) and a state battery (government
built gold processing facility) in the early 1900s
20-21
.
During the June quarter, Tempest reviewed existing data for the northern part of
the project and commenced planning for field work to begin in the September
quarter.
Warriedar West
The Warriedar West Project is an exploration project targeting Intrusive Related
Gold (IRG) and orogenic gold mineralisation. Tempest has previously announced
large multi-kilometre scale indicator geochemical anomalies
22
within the
Warriedar Project. The discovery of gold at Warriedar West is within kilometres of
underutilised gold processing facilities with established haulage routes in place.
Previous drilling by Tempest focussed on several target areas of shallow,
outcropping zones of highly altered silica rich intrusive and previously mapped
large outcropping gold bearing quartz veins which confirmed the widespread
presence of shallow gold within the silica rich lithocap accompanied by zones of
quartz vein swarms with grades of up to 5g/t
23-24
.
In addition drilling in 2020 revealed major new extensions to the Yalgoo
greenstone belt under shallow cover throughout the Wee Lode area
25-26
. Much of the Warriedar West
Project is now being considered within the full context of the new greenstone belt at Meleya and may hold
similar prospectivity for gold and base metals undercover. This is currently being translated into fieldwork and
potential drilling plans over the next 12 months.
Page 10 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Mount Magnet Region
Mt Magnet is a prolific multi-million ounce gold mining centre with numerous large scale, long life open pit and
underground mines currently in operation. It has been operated by major resources companies such as
Western Mining Corporation and Harmony Gold Ltd as well as more contemporary successful mid-tier
companies such as Ramelius Resources Ltd and Westgold Ltd.
Figure 12: Overview of Mt Magnet and the Range Project
Range
Located in the heart of the Mount Magnet mineral field and 5km along strike of the prolific +6Moz Mount
Magnet Operations, the Range Project consists of 17 tenements for 20km2.
Work completed during the quarter included interpretation of data with respect to similarities to other nearby
gold occurrences to the East of the project. Additionally, a review of the potential for critical minerals on the
project, based on work performed by other companies in the area is underway.
Multiple drill targets have been identified within the project and are currently being ranked and scheduled into
future fieldwork planning.
Page 11 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
YLP
Rocky Hill
Reconnaissance field mapping and surface sampling
27
commenced in May 2022. Results of more than 60
surface samples taken across the project yielded
multiple anomalous geochemical zones with Lithium
grades in soil up to 60.3 ppm and strong signals from
Lithium–caesium–tantalum (‘LCT’) and pathfinder
elements
28
.
It is considered that these results warrant further
investigation. Also in support of this view, a new
application for an extension of the project which
substantially expands the footprint and takes in
potential new target zones is in progress.
Figure 13: LCT SnWNb assay data plotted upon total magnetic intensity
Australian Lithium
The YLP consists of 2 pending tenements (2 pending) for a total of approximately 65
km2 in the Yilgarn craton of Western Australia
29
.
Tempest has previously conducted a review of the projects and confirmed the
Company view that these are highly prospective for Lithium and other commodities
30
and are progressing the applications .
Page 12 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
International Lithium Exposure
Tempest maintains a strong de-risked position in the global lithium market which it has been developing since
2017
31
. Tempest’s interests are both in Australia through its portfolio of Western Australian exploration
projects as well as Internationally through holdings or interests in projects in Africa and the USA.
In addition to the Company’s Australian focussed assets, Tempest has strong
de-risked interests and exposure to the international Lithium which include hard rock
lithium exploration targets in Africa and lithium brine in the USA.
Africa
Through a divestment deal in 2020
32
, Tempest retains a sizable holding (65 million
shares) in London listed Premier African Minerals (AIM:PREM). PREM are enjoying
a significant premium to the deal price due to ongoing developments and potential
upside in the portfolio
33
.
USA
Argosy (ASX:AGY) are progressing
34
their headline Tonopah Lithium Project (TLP)
located in a world class mining jurisdiction of Nevada, United States of America.
Tempest retains an interest
35
in the project through a A$250,000 milestone based
cash payment entitlement.
Page 13 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Corporate
Growth
Tempest continues to actively investigate and evaluate new growth opportunities in a number of jurisdictions
and commodities which may bring added value to Tempest shareholders.
September 2022 Quarter Exploration
Exploration activities are continuing at the Company’s Projects with the following programs planned for the
period:
●
●
●
●
●
Geophysics both downhole and airborne at the Yalgoo Projects
Further field work to progress additional drill targets at the Euro Project
Further field work to progress additional drill targets at the Euro Project
Preparation for further drilling at the Meleya Project
Preparation for further drilling at the Euro Project
ASX Additional Information
1. ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure (excluding staff costs) during the
Quarter was $951,187. Full details of exploration activity during the Quarter are set out in this report.
2. ASX Listing Rule 5.3.2: $95,000 was paid to related parties during the quarter comprising the
Managing Director’s salary and Non-Executive Director fees. $299,434 was paid to Galt Mining
Solutions Pty Ltd, a company controlled by directors Don Smith and Owen Burchell for technical
consulting services regarding the exploration programs undertaken by the Company and for provision
of office space. Legal fees amounting to $68,531 was paid to Hopgood Ganim Lawyers, a legal firm
where director Brian Moller is a partner in their Brisbane office.
Page 14 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian based mineral exploration company with a diversified portfolio of projects in
Western Australia considered highly prospective for precious, base and energy metals.
The Company has an experienced board and management team with a history of exploration, operational and
corporate success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to
maximize shareholder value through focussed, data-driven, risk-weighted exploration and development of our
assets.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
www.tempestminerals.com
LinkedIn
Instagram
Twitter
+61 89200 0435
Facebook
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on
certain assumptions and involve known and unknown risks, uncertainties and other factors, many of which are
beyond the company’s control. Actual events or results may differ materially from the events or results expected or
implied in any forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to
the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be
fulfilled. Tempest undertakes no obligation to update any forward-looking statement to reflect events or
circumstances after the date of this document (subject to securities exchange disclosure requirements).
The information in this document does not take into account the objectives, financial situation or particular needs of
any person or organisation. Nothing contained in this document constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project comments is based
on information compiled by Don Smith who is a geologist and Managing Director of Tempest Minerals Ltd. Mr
Smith is a Member of the AusIMM and the AIG and has sufficient experience relevant to the style of mineralisation
under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Smith consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
Page 15 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Appendix A: References
1. LI3 ASX Announcement dated 06 August 2020 “Enhanced Prospectivity at the Meleya Zone”
2. TEM ASX Announcement dated 18 November 2021 “Meleya Exploration Update - EIS Co-funding
Grant”
3. TEM ASX Announcement dated 02 March 2022 “Meleya Update - Expansion of granted tenure”
4. TEM ASX Announcement dated 21 February 2022 “Meleya Update - Drilling Imminent”
5. TEM ASX Announcement dated 24 February 2022 “Meleya Update - Drilling Commencement”
6. TEM ASX Announcement dated 28 March 2022 “Meleya Update - Significant Discovery”
7. TEM ASX Announcement dated 02 April 2022 “Meleya Update - Further mineralisation”
8. TEM ASX Announcement dated 07 July 2022 “Meleya Update - DHEM Survey Compliments Initial
Assays Results At Orion”
9. TEM ASX Announcement dated 29 June 2021 “Multiple New Targets at the Euro Project”
10. TEM ASX Announcement dated 08 July 2021 “Iron rich formations at Euro”
11. TEM ASX Announcement dated 28 July 2021 “Additional Iron Targets at the Euro Project”
12. TEM ASX Announcement dated 10 March 2022 “Euro Update - Lithium Potential Identified”
13. TEM ASX Announcement dated 25 October 2021 “Euro Exploration Update - Drilling Approval”
14. TEM ASX Announcement dated 27 October 2021 “Euro Exploration Update - Drilling Contractor
Appointed”
15. TEM ASX Announcement dated 09 November 2021 “Euro Exploration Update - Drilling Commenced”
16. TEM ASX Announcement dated 25 January 2022 “Sulphides intersected in drilling”
17. TEM ASX Announcement dated 16 February 2022 “Euro Update - Further Sulphides intersected
within broader mineralised corridor”
18. TEM ASX Announcement dated 23 May 2022 “Euro Update - Encouraging Gold And Polymetallic
Results Confirm Potential”
19. TEM ASX Announcement dated 09 June 2022 “Tempest and Karara Mining Limited sign Joint Venture
MOU”
20. Geraldton Guardian (1908) Messenger’s Patch Gold Field
21. Department of Mines Western Australia (1909) Annual Report
22. TEM ASX Announcement dated 26 May 2021 “Broad Gold Mineralisation Intercepted at Messenger”
23. TEM ASX Announcement dated 29 March 2021 “Exploration Update – Messenger Drilling”
24. TEM ASX Announcement dated 22 April 2020 “Warriedar Exploration Update – Large gold anomaly
identified”
25. TEM ASX Announcement dated 21 December 2020 “Gold at OK Corral & 2020 Drilling Completion”
26. TEM ASX Announcement dated 23 December 2020 “Greenstone belt and sulphide intersected in
drilling at Warriedar”
27. TEM ASX Announcement dated 08 February 2022 “Rocky Hill Update - Fieldwork Commenced”
28. TEM ASX Announcement dated 13 May 2022 “Rocky Hill Update - Multiple geochemical anomalies in
initial fieldwork”
29. Li3 Initial Public Offering Documentation and Company Presentation dated April 2017
30. TEM Investor Presentation dated 3 September 2021
31. TEM ASX Announcement dated 03 November 2021 “Tempest Maintains Exposure To Global Lithium
Market”
32. Li3 Announcement dated 11 June 2020 “Li3 Enters Sale Agreement for Disposal of African Projects”
33. Premier Africa Minerals website https://www.premierafricanminerals.com/ (Accessed 29 January
2022)
34. Argosy Website https://www.argosyminerals.com.au/ (Accessed 29 January 2022)
35. Li3 Announcement dated 11 September 2020 “Argosy completes purchase of Tonopah Lithium
Project”
Page 16 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
Appendix B: Title Summary
Tempest provides the following addendum in relation to additional information required by Listing Rule
5.3.3. Mining Title, Beneficial Interests and agreements held as at the end of the quarter:
Australia
License
Status
TEM Interest %
Notes
E 5902350
Granted
100
-
E 5902381
Granted
100
-
M 5900495
Granted
50
JV with Michele Conti
P 5902276
Granted
100
-
E 5902507
Granted
100
-
E 5902689
Pending
100
Granted post quarter end on 8 July 2022
E 5902224
Granted
100
-
E 5902308
Granted
100
-
E 5902374
Granted
100
-
E 5902375
Granted
100
-
E 5902465
Granted
100
-
E 5902479
Granted
100
-
E 5902319
Granted
100
-
E 5902410
Granted
100
-
E 5902418
Granted
100
-
E 5902419
Granted
100
-
E 5902498
Granted
100
-
Yalgoo Region
Messenger
Warriedar
Meleya
Euro
Mount Magnet Region
Range
Page 17 | 18
ASX : Tempest
2022-07-28 | Quarterly Report June 2022
P 5801770
Granted
100
-
P 5801773
Granted
100
-
P 5801781
Granted
100
-
P 5801783
Granted
100
-
P 5801784
Granted
100
-
P 5801785
Granted
100
-
P 5801786
Granted
100
-
P 5801787
Granted
100
-
M 5800229
Granted
100
-
P 5801680
Granted
100
-
P 5801697
Granted
100
-
P 5801698
Granted
100
-
P 5801753
Granted
100
-
P 5801761
Granted
100
-
P 5801768
Granted
100
-
P 5801769
Granted
100
-
P 5801774
Granted
100
-
P 5801796
Granted
100
-
YLP (Yilgarn Lithium Project)
E 7005321
Granted
100
-
E 7006134
Pending
100
Application during reporting period
E 7702384
Pending
100
-
E 6301815
Pending
100
-
Page 18 | 18
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Tempest Minerals Limited
ABN
Quarter ended (“current quarter”)
32 612 008 358
30 June 2022
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (12
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs and board & senior
management fees
(111)
(534)
(e) administration and corporate costs
(231)
(531)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
8
14
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other
-
-
1.9
Net cash from / (used in) operating
activities
(334)
(1,051)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(16)
(966)
(1,964)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation including
applicable staff costs
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (12
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
74
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(966)
(1,906)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
8,441
10,584
-
-
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
227
227
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(611)
(749)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
8,057
10,062
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,133
785
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(334)
(1,051)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(966)
(1,906)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
8,057
10,062
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date (12
months)
$A’000
-
-
7,890
7,890
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,890
1,133
5.2
Call deposits
5,000
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
7,890
1,133
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
170
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
323
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(334)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(966)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,300)
8.4
Cash and cash equivalents at quarter end (item 4.6)
7,890
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
7,890
6.06
Note: if the entity has reported positive
Share your feedback
Discover