Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
TEM | Quarterly Report - Period Ending 31 December 2023
Key Points
●
Projects
○ Yalgoo - Results of regional EM survey highlights multiple high-priority targets
○ Yalgoo - Gold and base metals identified in surface geochem program at Sanity Target
○ Range - Gold in surface geochem uncovered along strike from existing open pit
○ FiveWheels - Initial work commences
Projects
Yalgoo Region
Tempest’s flagship project is the Company’s holding in the Yalgoo region of Western Australia. Totalling more
than 1,000km2 and located near high profile neighbours including: 29 Metals Ltd (ASX:29M) - Golden Grove
Copper, Zinc, Gold, Silver Mine; Spartan Resources Ltd (ASX:SPR) - Yalgoo Gold Project; Silverlake (ASX:SLK) Deflector and Rothsay Gold Mines, Capricorn Metals Ltd (ASX:CMM) Gold, EMU NL (ASX:EMU) - Gnows Nest
Gold Project; Tungsten Mining (ASX:TGN) - Mt Mulgine Project; Fenix (ASX:FEX) - Iron Ore Operations, and
Karara and Sino Iron ore operations and more.
Figure 1: Overview of the TEM Yalgoo Projects
Tempest has used data-driven processes to identify poorly or unexplored areas of highly prospective geology.
This approach has had considerable success and includes the discovery of multiple instances of new
mineralisation.
The project contains different geological domains referred to by four different areas – namely: Messenger,
Meleya, War West, Euro - though much of these have considerable geological overlap.
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Regional Geophysical Survey
Results from the regional electromagnetic (EM) survey were announced during the period. EM surveys are
extensively utilised in the industry for identifying mineralisation and the aim for this survey was delineating
high priority exploration targets including potential VMS (volcanogenic massive sulphide) style mineralisation
as seen at the nearby Golden Grove Mine Camp.
The survey included over 300 lines of 200m spacing for more than 2,000 kilometres of line survey
measurements.
Figure 2: Schematic map of survey area and anomalies
Result
The survey was successful with high-quality data generated across the entire project. The newly reprocessed
data during the quarter includes numerous zones of interest for exploration and several potential high priority
drill targets. Notably, among the zones detected, an appreciable EM anomaly exists directly coincident with
the exciting previously announced 4km long base metal ‘Remorse’ target.
Sanity Target
The Sanity Targets sits in the eastern portion of the project area and is 2 km south of the Remorse Target.
Geochemical surveys have delineated strong coherent zones for multiple elements with particular respect to
Gold, having soil peaks of up to 80ppb and individual rock chips within the same geology trends have returned
results of up to 7gpt gold and 0.2% copper and >60% Iron and are along strike from and likely part of a
broader mineralised system as the Barron Rothchild deposit.
Page 2 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Figure 3: Sanity Target surface sampling results (gold)
Page 3 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Figure 4: Sanity Target surface sampling results (copper)
Figure 5: Sanity Target surface sampling results (zinc)
Page 4 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Mount Magnet
Mt Magnet is a prolific multi-million ounce gold mining centre with numerous large scale, long life open pit
and underground mines currently in operation. It has been operated by major resources companies such as
Western Mining Corporation and Harmony Gold Ltd as well as more contemporary successful mid-tier
companies such as Ramelius Resources Ltd and Westgold Ltd.
Figure 6: Overview of Mt Magnet and the Range Project
Range
Located in the heart of the Mount Magnet mineral field and 5km along strike of
the prolific +6Moz Mount Magnet Operations, the Range Project consists of 17
tenements for 20km2.
Page 5 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Reconnaissance Mapping
A review and re-interpretation of the project based on new information resulted in a hypothesis that key
geology found in the mineralised zone of the Britannia Well pit and other mining centres in Mount Magnet
may continue in a newly recognised orientation. Field verification saw rock chip samples from multiple
outcrops yielding anomalous gold results. Highlights include:
●
●
●
●
●
Wrangler Target: 1gpt Gold. 170m along strike of the Brittania Well pit and a likely extension of the
pit’s mineralised zone. Found in heavily jointed smokey coloured tourmaline bearing, brecciated
Boogardie Formation chert and meta intrusives.
Cherokee Target: 0.5gpt Gold. New gold-bearing mineralisation zone, 1.5km along strike from the
Brittania Well Pit and a cluster of historic shafts and trenches. Heavily tourmalinised and brecciated
volcanics and felsic intrusive nearby outcropping interpreted Boogardie Formation.
Greenstone assemblage and felsic lithologies, many of which demonstrate strong brecciation and
tourmalinisation believed to be associated with gold mineralisation.
Extensive tourmalinisation across the project with 6 distal tourmaline-bearing samples containing
elevated gold and gold pathfinder elements (Sb and As).
Continuation of the key regional economic gold mineralisation hosting metasedimentary/ultramafic
volcanics that correspond to a feature present in magnetic geophysical datasets.
Figure 7: Wrangler Target relative to existing Open Pit (TEM tenure in red)
Page 6 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Five Wheels
In July 2023, TEM announced the acquisition of the FiveWheels Project in Western Australia which is
proximal (~36km) to the high-profile world-class Rumble Resources Ltd (ASX:RTR) and the emerging
Strickland Metals Ltd (ASX:STR) zinc-lead-copper discoveries.
The Project is located in the Earaheedy Basin where key geology at the edge hosts the mineralisation and
potentially more widespread regionally.
Consideration for the FiveWheels Project was 4,561,828 ordinary fully paid shares in TEM and payment
of $36,000 cash as consideration for the purchase of 100% of the issued capital of Five Wheels Pty Ltd,
which owns the FiveWheels Project.
TEM commenced initial setup work at the project in October, which included project setup, initial
reconnaissance and geological mapping and sampling at selected areas.
Figure 8: Five Wheels Simplified Project Geology Map With RTR
Page 7 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Elephant Project
TEM previously announced it had entered into a conditional non-binding term sheet to acquire the Elephant
Project.
The Elephant Project comprises 194km2 (135km2 granted - 59km2 application) of highly prospective
exploration leases. The location on the edge of a geological block with (the suture between the Yilgarn and
Albany-Fraser) is a favourable location for major discoveries as evidenced by the presence of multiple world
class deposits in similar environments along this trend.
The project was pegged primarily due to a strong geophysical anomaly and coincident geochemical data from
nearby previous exploration. The large scale and nature of the anomaly bear similarities to other world class
deposits in the regions such as Tropicana of which Tropicana peak soil was 31pbb with 0-15m cover while the
Elephant Target is 5-10pbb with 100-150m of cover.
The acquisition was completed subsequent to quarter end in January 2024, with TEM paying $36,000 cash
and issuing 7,740,957 TEM Shares to MAC3 (or its nominee) for 80% of Lusture Pty Ltd which holds the
Elephant Project.
Figure 9: Project Location within regional exploration context
Page 8 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Tolu Investment (PNG)
Tolu Minerals Ltd (Tolu) successfully completed their Initial Public Offering (IPO) on the ASX on 9 November
2023. Tolu highlight assets are the Tolukuma Gold Mine and Mt Penck Projects in Papua New Guinea.
TEM previously subscribed for 2,702,703 Shares at an issue price of A$0.37 for a total investment of A$1
million which assisted in the final stage of acquisition of the Tolukuma Gold mine and brings exciting
exposure to high grade pre-production projects into TEM’s portfolio.
Figure 10: Overview of Lole Mining Projects
Page 9 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Australian Lithium
Electra Minerals
Tempest is currently considering options to enable the company to unlock the value of its WA lithium
projects.
Rocky Hill
The Rocky Hill Project is 100% TEM owned tenure, located approximately 100 km from Perth within the
exciting new exploration front known as the South West Terrane and includes neighbours such as Newmont
Corporation.
The project is primarily a lithium exploration target however and there is potential for other minerals including
gold, magnesium and high purity alumina (HPA).
TEM previously completed reconnaissance field mapping and surface sampling with multiple anomalous
geochemical zones of lithium and pathfinder element signals.
Tenement E7006134 was granted during the reporting period.
YLP
The YLP consists of 2 pending tenements for a total of approximately 65 km2 in the
Yilgarn craton of Western Australia.
Tempest has previously conducted a review of the projects and confirmed the
Company view that these are highly prospective for Lithium and other commodities.
Work this quarter was focussed on progressing tenement applications.
International Lithium
In addition to the Company’s Australian focussed assets, Tempest has strong de-risked interests and
exposure to the international Lithium which include hard rock lithium exploration
targets in Africa and lithium brine in the USA.
Africa
Through a divestment deal in 2020, Tempest retains a sizable holding (25 million
shares) in London listed Premier African Minerals (AIM:PREM). PREM have
significant market upside through development of their portfolio.
USA
Argosy (ASX:AGY) is progressing their headline Tonopah Lithium Project (TLP)
located in a world class mining jurisdiction of Nevada, United States of America.
Tempest retains an interest in the project through a A$250,000 milestone based
cash payment entitlement.
Page 10 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Corporate
Growth
Tempest continues to actively investigate and evaluate new growth opportunities in a number of jurisdictions
and commodities which may bring added value to Tempest shareholders.
March 2024 Quarter Exploration
●
●
●
Progressing approvals for potential drilling in Yalgoo
Onsite geological mapping at Yalgoo
Progressing approvals for potential drilling in Mt Magnet
ASX Additional Information
1. ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure (excluding staff costs) during the
Quarter was $266,851. Full details of exploration activity during the Quarter are set out in this report.
2. ASX Listing Rule 5.3.2: There were no substantive mining production and development activities
during the Quarter.
3. ASX Listing Rule 5.3.2: $95,000 was paid to related parties during the quarter comprising the
Managing Director’s salary and Non-Executive Director fees. $136,319 was paid to Galt Mining
Solutions Pty Ltd, a company controlled by directors Don Smith and Owen Burchell for technical
consulting services regarding the exploration programs undertaken by the Company and for provision
of office space and storage. Legal fees amounting to $32,954 was paid to Hopgood Ganim Lawyers, a
legal firm where director Brian Moller is a partner in their Brisbane office.
Page 11 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian based mineral exploration company with a diversified portfolio of projects in
Western Australia considered highly prospective for precious, base and energy metals. The Company has an
experienced board and management team with a history of exploration, operational and corporate success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to
maximise shareholder value through focussed, data-driven, risk-weighted exploration and development of our
assets.
Investor Information
investorhub.tempestminerals.com
TEM welcomes direct engagement and encourages shareholders and interested parties to visit the TEM
Investor hub which provides additional background information, videos and a forum for stakeholders to
communicate with each other and with the company.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
Website
Instagram
LinkedIn
Twitter
Youtube
Facebook
+61 892000435
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on certain
assumptions and involve known and unknown risks, uncertainties and other factors, many of which are beyond the company’s
control. Actual events or results may differ materially from the events or results expected or implied in any forward-looking
statement. The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to
the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be fulfilled. Tempest
undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date of this
document (subject to securities exchange disclosure requirements). The information in this document does not take into
account the objectives, financial situation or particular needs of any person or organisation. Nothing contained in this document
constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project comments is based on information
compiled by Don Smith who is the Managing director of Tempest Minerals Ltd. Don is a Member of AusIMM, AIG and GSA and
has sufficient experience relevant to the style of mineralisation under consideration and to the activities undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Don consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
Page 12 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Appendix A: Title Summary
Tempest provides the following addendum in relation to additional information required by Listing Rule 5.3.3.
Mining Title, Beneficial Interests and agreements held as at the end of the quarter:
Australia
License
Status
TEM Interest %
Notes
E 5902308
Granted
100
-
E 5902319
Granted
100
-
E 5902350
Granted
100
-
E 5902374
Granted
100
-
E 5902375
Granted
100
-
E 5902381
Granted
100
-
E 5902410
Granted
100
-
E 5902418
Granted
100
-
E 5902419
Granted
100
-
E 5902465
Granted
100
-
E 5902479
Granted
100
-
E 5902493
Granted
100
-
E 5902498
Granted
100
-
E 5902507
Granted
100
-
E 5902689
Granted
100
-
E 5902785
Granted
100
-
E 5902786
Granted
100
-
E 5902787
Pending
100
-
E 5902803
Pending
100
-
E 5902805
Granted
100
-
E 5902809
Pending
100
-
M 5900495
Granted
50
-
P 5902276
Granted
100
P 5902366
Pending
100
Yalgoo Region
-
Page 13 | 14
ASX : TEM
2024-01-30 | Quarterly Report Dec 2023
Mount Magnet Region
P 5801770
Granted
100
-
P 5801773
Granted
100
-
P 5801781
Granted
100
-
P 5801783
Granted
100
-
P 5801784
Granted
100
-
P 5801785
Granted
100
-
P 5801786
Granted
100
-
P 5801787
Granted
100
-
M 5800229
Granted
100
-
P 5801680
Granted
100
-
P 5801697
Granted
100
-
P 5801698
Granted
100
-
P 5801753
Granted
100
-
P 5801761
Granted
100
-
P 5801768
Granted
100
-
P 5801769
Granted
100
-
P 5801774
Granted
100
-
P 5801796
Granted
100
-
100
-
Five Wheels Project
E 6903884
Granted
YLP (Yilgarn Lithium Project)
E 7005321
Granted
100
-
E 7006134
Granted
100
-
E 7702384
Pending
100
-
E 6301815
Pending
100
-
Page 14 | 14
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Tempest Minerals Limited
ABN
Quarter ended (“current quarter”)
32 612 008 358
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (6
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs and board & senior
management fees
(95)
(190)
(e) administration and corporate costs
(183)
(378)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
8
17
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other – due diligence costs
-
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(270)
(551)
(a) entities
-
-
(b) tenements
-
(36)
(c) property, plant and equipment
-
-
(267)
(556)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation including
applicable staff costs
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (6
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other –
-
-
2.6
Net cash from / (used in) investing
activities
(267)
(592)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(1)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
(1)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,037
2,644
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(270)
(551)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(267)
(592)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
(1)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date (6
months)
$A’000
-
-
1,500
1,500
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,500
2,037
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,500
2,037
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
134
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
130
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(270)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(267)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(537)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,500
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,500
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.79
-
$A’000
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 January 2024
Authorised by: The Board of Directors
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover