Euro Exploration Update - Sulphides intersected in drilling
Released
Released
Announcement PDF
ASX : TEM
2022-01-25 | Sulphides intersected in drilling
TEM | Euro Exploration Update - Sulphides intersected in drilling
Key Points
●
●
●
●
●
Sulphides visible in multiple holes including semi-massive zones
Thick zones of alteration and mineralisation intersected in all holes to date
Drilling to date aims to confirm historic drilling and extend known mineralisation
Drilling completed in two areas with a third in progress
Laboratory results due in Q1 2022
News Item
Tempest Minerals Ltd (TEM) is pleased to provide a market update on the drilling progress at the Euro Project.
Drilling has been completed at two of the three target areas. All holes to date have intersected zones of
significant alteration including hydrothermal quartz breccia consistent with historical gold intersects, but also
appreciable semi-massive sulphides beyond the tenor previously reported which may be associated with large
systems such as skarn or volcanic massive sulphides (VMS).
Figure 1: WARDH0065 a. Quartz+/-carbonate +/-pyrite vein in chlorite altered sedimentary rocks; b.
Garnet+pyroxene+chlorite skarn alteration (~58m); c. semi-massive sulfides (pyrrhotite dominant) associated
with skarn alteration of sedimentary rocks (~61m)
Figure 2: Quartz veins with chalcopyrite in WARDH0068
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 12
ASX : TEM
2022-01-25 | Sulphides intersected in drilling
Drilling Update
Two areas have been completed to date with a third in the final stages of drilling for a total of approximately
881m diamond drilling completed despite production being hampered by staffing issues associated with the
holiday period and Western Australian border restrictions.
All drill holes to date have encountered thick zones of alteration including: chlorite, biotite, albite and garnet
with visible mineralisation of quartz breccias and disseminated to semi massive sulphides.
In November 2021, Tempest announced the commencement of diamond drilling at the Euro Project primarily
focussing on confirmation and extension of historic results 1 which include:
nr017:
17m @ 1.2g/t Au from 20m
nr018:
15m @ 2.3 g/t Au (including 7m @ 3.4g/t Au) from 15m
mbrb021a:
9m @ 1.2g/t Au (including 2m @ 11.4g/t Au) from 0m (surface)
Historic drilling at the project indicated the presence of rare disseminated sulphides associated with zones of
gold mineralisation. The presence of significant sulphides including pyrrhotite and chalcopyrite indicate that
the project may be more fertile than previously thought and also prospective for base metals.
Figure 3: Pyrrhotite and chalcopyrite vein WARDH0068 (164.10m)
Figure 4: Euro project planned drilling areas with legacy drilling and TEM planned drill areas
Page 2 | 12
ASX : TEM
2022-01-25 | Sulphides intersected in drilling
Background
The Euro Project is 176 km2 of 100% owned tenements within the exciting
Warriedar exploration portfolio in the Yalgoo region of Western Australia
which totals more than 900 km2 (>604 km2 granted and 311 km2 of
pending). The Euro Project is an underexplored geological terrain located
between several in development or producing operations including Karara
(Iron), Shine (Iron), Mt Mulgine (Gold/Tungsten) and Rothsay
(Gold/Copper).
Parts of the project were explored in the 1990s and early 2000s for gold
and iron ore. Reconnaissance drilling in the north of the project area
encountered significant gold mineralisation. Due to depressed metal
prices, they were not considered priority and not followed up with targeted
drilling.
Tempest advised in November that drilling had commenced at the Euro
Project. The current program will test and extend new and previously
known zones of mineralisation with significant historic drill results 2.
Geology
The Euro Project comprises part of the southern Yalgoo Greenstone belt with primary host rock stratigraphy
of ultramafic, mafic and felsic volcanic and sedimentary sequences including banded iron-formations (BIF).
These are comparable to those that host major nearby deposits including Karara, Rothsay and Mount
Mulgine.
The region has multiple generations of deformation including folding and shearing which can be observed
clearly in geophysical models and in the field. The major folding system appears northwest–southeast with
remnants of a later phase of refolding striking north–south and east–west. Multiple generations of shearing
are also present, including offsets of fold axial planes. At least two of the shearing events appear relevant to
the presence of gold mineralisation at the nearby Rothsay Mine as well as the Euro Project.
The current drilling program is targeting areas known to host gold within quartz sulphide veins within a larger
associated alteration system.
Next Steps
●
●
●
Drilling to conclude at area C with further infill and extension drill planning in progress
Laboratory results due Q1 2022
Meleya Project fieldwork and siteworks for Exploration Incentive Scheme (EIS) confounded drill
program to begin in the imminent future
Page 3 | 12
ASX : TEM
2022-01-25 | Sulphides intersected in drilling
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian based mineral exploration company with a diversified portfolio of projects in
Western Australia considered highly prospective for precious, base and energy metals.
The Company has an experienced board and management team with a history of exploration, operational and
corporate success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to
maximize shareholder value through focussed, data-driven, risk-weighted exploration and development of our
assets.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
www.tempestminerals.com
LinkedIn
Instagram
Twitter
+61 892000435
Facebook
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on
certain assumptions and involve known and unknown risks, uncertainties and other factors, many of which are
beyond the company’s control. Actual events or results may differ materially from the events or results expected or
implied in any forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to
the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be
fulfilled. Tempest undertakes no obligation to update any forward-looking statement to reflect events or
circumstances after the date of this document (subject to securities exchange disclosure requirements).
The information in this document does not take into account the objectives, financial situation or particular needs
of any person or organisation. Nothing contained in this document constitutes investment, legal, tax or other
advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project comments is based
on information compiled by Don Smith who is the Managing Director of Tempest Minerals Ltd. Don is a Member of
AusIMM and AIG and has sufficient experience relevant to the style of mineralisation under consideration and to
the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Don consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
Page 4 | 12
ASX : TEM
2022-01-25 | Sulphides intersected in drilling
Appendix A: References
1. TEM ASX announcement dated 29 June 2021 “Multiple New Targets at the Euro Project”
2. TEM ASX announcement dated 09 November 2021 “Euro Exploration Update – Drilling Commenced”
Page 5 | 12
ASX : TEM
2022-01-25 | Sulphides intersected in drilling
Appendix B: Diamond Drill hole Data Summary
Hole
mE
mN
Actual
Depth
Azi
Dip
Geology
Area A
WARDH0065
483480
6769410
78
045
-60
Banded iron formation, hydrothermal quartz and altered sediments possible skarn alteration – garnets, pyroxene, magnetite, pyrrhotite,
pyrite.
WARDH0066
483490
6769390
75.5
045
-60
Banded iron formation, hydrothermal quartz and altered sediments possible skarn alteration – garnets, pyroxene, magnetite, pyrrhotite,
pyrite.
WARDH0067
483600
6769430
37.6
180
-60
Follow up on 0.7g/t Au intersects in MDR165 + 166.
Volcaniclastic/sedimentary sequence intersected. Hole aborted
within the oxide zone due to drill rig malfunction.
Area C
WARDH0068
483280
6770350
166.4
090
-60
Follow up on broad historical gold intersections in nr18 nr19 nr20.
Drilling intersected basalt overlying a volcaniclastic/sedimentary
rock sequence from 101m including siltstones and fine grained
sandstones.
Stringer veins of quartz±carbonate±sericite or
quartz±chlorite±biotite are associated with pyrrhotite, pyrite and
chalcopyrite.
WARDH0069
483250
6770350
18.3
090
-60
Drill hole aborted. Significant core loss within inferred mineralised
zone.
WARDH069A
483250
6770350
114.4
090
-60
Drill hole logging and sampling not yet complete. Follow up on broad
historical gold intersections in nr18 nr19 nr20. Metamorphosed,
sheared and fragmented basalt overlying sulphidic fine grained
sedimentary rocks.
WARDH0069B
483250
6770350
29.8
090
-60
Redrill of WARDH069A. Metamorphic, sheared and fragmented
basalt with stockwork of oxidised quartz±carbonate veins believed to
be a possible host to gold mineralisation in historical drill holes.
WARDH0070
483350
6770350
6
090
-50
Basalt and fine grained sediments. Hole aborted.
WARDH0070A
483350
6770350
207.1
090
-50
Reconnaissance drill hole in area of surface shearing and dilational
quartz veining. Sequence of basalt and fine grained sediments
intersected in top half of drillhole (to 110m) with chl+/- biotite altered
fine grained sulfidic sedimentary rocks from 110m to the end of hole.
Pyrrhotite and pyrite strongly associated with quartz-chlorite-biotite
veins and disseminated throughout the rock. Alteration is strongest
in sedimentary rocks, with minor sulfide seen within basalt.
Area B
WARDH0071
483270
6769675
156.4
270
-60
Drill hole in progress.
(anomalism 8-16m)
Notes: All drill holes are HQ or NQ triple tube. Co-ordinate grid is MGA94, Zone 50S
Page 6 | 12
Follow up on 12.4g/t Au in MBRB019
ASX : TEM
2022-01-25 | Sulphides intersected in drilling | JORC TABLE 1
Appendix C: JORC Table 1
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
●
●
●
●
Drilling
techniques
●
Commentary
Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public Report.
In cases where ‘industry standard’ work has been done this would be relatively simple
(eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may
be required, such as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
●
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc).
●
●
●
●
●
●
●
●
Drill sample
recovery
●
●
●
Method of recording and assessing core and chip sample recoveries and results
assessed.
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
●
●
●
●
●
Page 7 | 12
Diamond drilling - sawn HQ and NQ drill core with half the core cut by
diamond saw and bagged into calicos at intervals as determined by logged
geology.
No other measurement tools other than directional survey tools have been
used in the holes at this stage.
Diamond drilling used 3m length barrels which are then marked in one metre
intervals based on the core block measurement.
Drill core was measured, oriented and marked up in the field before being
transported to the company’s core processing facilities in West Leederville
for sampling.
Oriented core was placed in orientation rack with a line drawn along the core.
This was used to ensure representativeness of samples when cutting.
Samples will be dispatched to an accredited laboratory (Intertek) in Perth,
Western Australia for sample preparation and shipment to analysis
Diamond drilling using Custom build DDSR track mounted multipurpose rig
HQ triple tube drill string used from surface in all holes (WARDH0065-0071)
changing to NQ triple tube when in fresh rock.
All diamond drill core orientated using Reflex ACT III Orientation Tool.
Core measured using standard measuring tape. Length of core is then
compared to recorded interval drilled from core blocks placed in trays at end
of runs.
All care taken to obtain 100% core recovery (HQ & NQ triple tube); core trays
photographed wet and dry
Not known at this stage: more drilling is required to establish if there is any
sample bias.
Intermittent core loss was present in fracture zones
Core loss was recorded in several holes where drilling technique was
suboptimal
ASX : TEM
2022-01-25 | Sulphides intersected in drilling | JORC TABLE 1
Logging
●
●
●
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant intersections logged.
●
●
●
●
Sub-sampling
techniques and
sample
preparation
●
●
●
●
●
●
Quality of assay
data and
laboratory tests
●
●
●
Verification of
sampling and
assaying
●
●
●
●
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled.
●
The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and
precision have been established.
●
The verification of significant intersections by either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
●
Page 8 | 12
●
●
●
●
●
●
●
●
●
Diamond drilling - All HQ/NQ drill core is photographed, core recovery
calculated; core marked up along the orientation line, and logged by
experienced geologists familiar with the style of deposit and stratigraphy.
Magnetic susceptibility is measured as an average of each metre sample of
core.
The percentage of visible sulphide (pyrrhotite, pyrite, chalcopyrite) is
estimated for each significant geological unit. Specific gravity (S.G.)
collected for representative samples of each rock type.
Geological logging is both qualitative and quantitative. Lithology, alteration,
mineralisation, veins and structural data is captured digitally and stored in the
database.
Core cut to half core with repeat samples cut to quarter core using diamond
saw.
Diamond drill core half sawn by Sandvik blade, then sampled at 1m intervals,
or as determined by geological contacts by breaking with rock hammer into
standard calico bags (2-3kg sample) and submitted to Intertek, Perth, W.A..
Standard Western Australian sampling techniques applied. There has been no
statistical work carried out at this stage.
It is unknown whether the sample sizes are appropriated to the grain size of
the material being sampled.
Blanks, duplicate or standards are inserted, alternating, every 20th sample.
Duplicate samples are submitted as quarter core samples.
All diamond samples were prepared using standard crushing and pulverising
(to -75#) at Intertek, Perth, W.A.. From the 3-4kg pulp s subsample is then
subjected to four acid digest and these are assayed by method 4AMS48
(multi-element analysis) and 50g fire assay with ICP-AES finish
Standard Intertek protocols re blanks, standards and duplicates applied.
The use of hand held XRF, XRD, magnetometers and other tools are in
progress.
Referee sampling has not yet been carried out
Drill holes WARDH0068, 0069A and 0071 were positioned to intersect
historical gold intersects. No assays have been returned or reported to date
to verify historical data.
Geological logging is completed immediately into a locked spreadsheet. All
data entry is carried out by qualified personnel. Standard data entry is used
on site, and is backed up directly to a cloud based database.
ASX : TEM
2022-01-25 | Sulphides intersected in drilling | JORC TABLE 1
Location of data
points
●
●
●
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
●
●
●
●
Data spacing and
distribution
●
●
●
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
●
●
●
●
Orientation of
data in relation to
geological
structure
Sample security
Audits or reviews
Drill hole locations collected by hand held Garmin GPS (±3m horizontal, up to
12m vertical error). Down hole surveys have been carried out by DDSR
Australia using Reflex Multi Shot Survey Camera, and core orientation using
Reflex ACT III Orientation Tool.
Grid: MGA94 Datum UTM Zone 50S
A DEM topographic model of the Euro Project area was completed using a
drone in 2021,, with accuracy of less than ±2m for easting and northings and
less than ±1m vertically.
Elevation of drill holes was collected using the DGPS above for drill holes
WRC001-006 and by hand held GPS for all other drill holes. Those drill holes
which did not conform with the DEM model, were adjusted so the collar
position fit the DEM model.
Not relevant to the current drilling.
Drill holes were placed based on geological targeting and were spaced
according to geology and historical gold intersects of each target.
Sampling was undertaken through all potential mineralisation zones (banded
iron formation, skarn altered rock and structural zones) with contacts
determined by geological contacts or sulfide density. Sampling was usually
at 1m intervals.
No compositing was applied
●
●
Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.
●
The measures taken to ensure sample security.
●
Core was collected onsite and moved on scheduled weekly or fortnightly
collections to a processing facility in Perth where it is cut and transported
directly to Intertek laboratories by Tempest or contract personnel.
●
The results of any audits or reviews of sampling techniques and data.
●
No audits have been been completed at this time
●
Page 9 | 12
●
The understanding of the structure and geology intersected in drilling is in
progress and accurate true widths cannot be assumed at this time.
Several drill holes were drilled nearby historic percussion drilling and
intersected similar widths indicating possible continuity which may be used
to assist in inference of true thicknesses
ASX : TEM
2022-01-25 | Sulphides intersected in drilling | JORC TABLE 1
Section 2 Reporting of Exploration Results
Criteria
Mineral tenement and
land tenure status
JORC Code explanation
●
●
Commentary
Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
●
●
●
●
●
Exploration done by
other parties
Geology
All results quoted are from (what is now) E5902319. This lease is owned
100% by Warrigal Mining Pty Ltd which is a subsidiary of Tempest Minerals
Ltd.
No overriding interests are present to the Company’s knowledge.
Approval was given for the current drilling in November 2021 as reported by
Tempest TEM ASX announcement dated 25 October 2021 ”Euro Exploration
Update - Drilling Approval”
Tempest acknowledges the traditional owners of the land, the Widi Mob who
have performed heritage clearance surveys across the planned drill program
areas.
The project is on managed land and has been approved by DBCA and DMIRS
under Program of works (POW) #97237
●
Acknowledgment and appraisal of exploration by other parties.
●
Tempest acknowledges the significant work by previous explorers Normandy,
Aztec, Karara, Gindalbie, Minjar.
●
Deposit type, geological setting and style of mineralisation.
●
The Euro Project comprises primarily ultramafic, mafic and felsic stratigraphy
with banded iron-formations (BIF), which forms part of the southern Yalgoo
Greenstone belt. Both the mafic/ultramafic sequences – which include
Rothsay and Mount Mulgine deposits e.g. Black dog – and the BIF at Karara 3
are known to host gold throughout the region.
The stratigraphy has been disrupted by several generations of deformation as
evidenced by macro scale folding seen in geophysics and aerial imagery. The
major folding system appears northwest–southeast with remnants of a later
phase of refolding striking north–south and east–west. Multiple generations
of shearing are also present, including offsets of fold axial planes. At least
two of the shearing events appear relevant to the presence of gold
mineralisation at the nearby Rothsay Mine as well as the Euro Project.
The current drilling program is primarily targeting gold within quartz veins and
surrounding altered rocks, or associated with massive sulphides, 4 which
outcrop as weathered gossanous stock and boxwork.
●
●
Page 10 | 12
ASX : TEM
2022-01-25 | Sulphides intersected in drilling | JORC TABLE 1
Drill hole Information
Data
aggregation
methods
●
A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
○
easting and northing of the drill hole collar
○
elevation or RL (Reduced Level – elevation above sea level in metres) of the
drill hole collar
○
dip and azimuth of the hole
○
down hole length and interception depth
○
hole length.
○
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
●
The current drill program is incomplete and no assay results have been
received at this stage. However, a draft table of current drill holes with notes
regarding geology is supplied in Appendix B of this document.
●
In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be
stated and some typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be clearly
stated.
●
No aggregation has been used to the Company’s knowledge, all results are
percussion quoted in metres where simple averaging is utilised.
No metal equivalents have been used.
These relationships are particularly important in the reporting of Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length, true width not known’).
●
The geometry of the geology is not clearly definite at this stage of exploration.
Much of Tempest's current drilling program is designed to provide structural
data to augment the legacy drilling results.
●
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported. These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
●
See appended figure(s)
●
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
●
Approximately 400 holes (historical) have been drilled into the northern
section of the Euro Project. Reporting of all of these in entirety is not
practicable in this format. A selection of all results using a 0.5 gpt Au cutoff
are listed in the appendices of the TEM announcement dated Nov 09 2021
regarding this matter.
●
Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
●
The extensive records of legacy geological, geophysical and geochemical
work performed by previous explorers is impractical to list in this format but is
accessible publicly on the Western Australian State Government ‘WAMEX’
system.
●
●
Relationship between
mineralisation widths
and intercept lengths
Diagrams
Balanced reporting
Other
substantive
exploration data
●
●
●
Page 11 | 12
●
ASX : TEM
2022-01-25 | Sulphides intersected in drilling | JORC TABLE 1
Further work
●
●
The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
Page 12 | 12
●
The current program will consist of diamond drilling and will test and extend
areas of known mineralisation and test new drill targets.
Detailed
observations will provide improved geological understanding of these zones,
which can be used to further the project.
Share your feedback