Gold in Early RC Results beside Existing Open-Pit and Mill
Released
Released
Announcement PDF
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
TEM | Range - Gold in early drill results beside existing open-pit and mill
Key Points
● RC drilling extends gold mineralisation from surface
● Initial results exhibit encouraging grades including:
○ 3m @ 3.2g/t Au from 58m (MGTDH002)
■ Including 1m @ 5.9g/t Au from 59m
● Further assay results pending
● Mineralisation open along strike and down plunge
● Drill results adjacent to major planned mill expansion
Summary
Tempest Minerals Ltd (TEM) is pleased to announce the first assay results from recent Reverse
Circulation (RC) drilling at its Range Gold Project located near Mt Magnet in the Murchison
region of Western Australia.
Results presented in this release are from the inaugural RC drilling program completed in
October 2025 as part of a broader program to test the Range Project with drilling and
geochemical sampling. The recently completed drill program of 19 holes for 1,500m tested
multiple targets across the project area. 4 holes have been received, extending gold found at
surface to depth.
These results lie less than 10km from the planned Ramelius Resources (ASX:RMS) major
processing circuit expansion.
Figure 01: 3m @ 3.2g/t Au in silica/sericite/pyrite-altered felsic porphyry adjacent to BIF and quartz veining at a
sheared basalt contact; from hole MGTDH002.
Tempest Minerals Ltd │ ACN 612 008 358 Page 1 | 16
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
Range Project
Background
The Range project is 20km2
of highly prospective ground sitting within the greater Mt Magnet region, which is
a premier multi-million-ounce gold mining centre with numerous large-scale, long-life open pit and
underground mines currently in operation. The Range Project sits within 5km of major mining houses as well
as recent high-profile exploration successes 1 2 3 4
.
TEM has been exploring the Range project for some time, including analysing historical data, leading to a
number of exploration prospects being generated 5
and opened the possibility of further prospects along
strike to the south as outlined in the recent geological reinterpretation 6
. Fieldwork has identified a number of
gold-bearing exploration targets along a 7km strike length, including: the Wrangler Target adjacent to the
Britannia Open Pit 7
; the Cherokee Prospect yielding grades of up to 1g/t gold; and targets located in several
different geological settings along the multi-kilometre corridor 8
.
TEM has recently completed a number of field programs, including: a large auger-based geochemical
sampling program 9
; and the Company’s first drilling at the project 10 11
. This drill program tested multiple
targets and consisted of 19 holes for a total of 1,500m 12
.
The drilling results in this announcement lie less than 10km from the planned major processing circuit
expansion 13
of neighbouring Ramelius Resources (ASX:RMS), existing large-scale operations in Mount
Magnet.
Figure 02: Overview of project and drilling
Page 2 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
Geology
Geological observations from the current drilling completed at Range support an interpretation of the gold
mineralisation being hosted by a suite of felsic porphyry intrusions, which are visually similar to gold
mineralised porphyries that, in the Mount Magnet region, host gold mineralisation at Eridanus, Stellar, Milky
Way and other deposits.
Gold mineralisation in the Britannia Well gold mine (RMS), immediately north of the Range Project, is hosted
within vein stockworks within altered felsic porphyries. Felsic porphyries intersected in drilling at Range were
observed to be sericite-altered, foliated and sheared, and contain quartz vein networks with disseminated
pyrite. Gold mineralisation, from this initial assay batch, is concentrated along the contacts of porphyries in
zones of pyrite and quartz veining. Broader zones of low-grade (0.2-0.6 g/t Au) contain higher-grade zones of
+1g/t Au mineralisation. This is a similar arrangement to the porphyry deposits throughout the Mount Magnet
region.
TEM believes on this basis that, based on the similarities to date, and with further drilling, there is a good
probability of defining further zones of broad low-grade gold mineralisation, and within these, zones of
economic high-grade shoots within porphyry intrusions.
Figure 03: Geology map showing 2025 RC Drilling and trends of mineralisation at porphyry contacts.
Page 3 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
Drilling
Results presented in this release are from the inaugural RC drilling program completed in October 2025. 19
holes for 1,500m were drilled as part of a broader program to test the Range Project with drilling and
geochemical sampling. 4 holes have been received from this recently completed drill program, which tested
multiple targets.
Mineralisation is typically hosted in silica-sericite-pyrite altered felsic porphyry intrusions. The Range
porphyries are typical of the mineralised felsic porphyries in the Boogardie Basin. The drill holes in this
announcement extend gold mineralisation discovered by TEM at surface to depth.
Significant gold intercepts received to date include:
HOLE_ID FROM m To m Length m Au g/t Including Au g/t
MGTDH001 7 12 5 0.6 2m @ 1.2
MGTDH002 58 61 3 3.2 1m @ 5.9
MGTDH010 36 40 4 0.5 -
MGTDH010 113 118 5 0.7 2m @ 1.2
MGTDH010 127 129 2 1.3 1m @ 2.5
Figure 04: Section through N6889500 - MGDH01 and MGDH02
Next Steps
- Remaining RC assays pending
- Geochemical auger program assays pending
- Geological interpretation and targeting
- Potential phase 2 drilling
Page 4 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian-based mineral exploration company with a diversified portfolio of projects in Western
Australia, where its iron ore project is moving towards development in addition to exploring for precious, base and energy
metals. The Company has an experienced board and management team with a history of exploration, operational and corporate
success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to maximise
shareholder value through focused, data-driven, risk-weighted exploration and development of our assets.
Investor Information
investorhub.tempestminerals.com
TEM welcomes direct engagement and encourages shareholders and interested parties to visit the TEM Investor hub, which
provides additional background information, videos and a forum for stakeholders to communicate with each other and with the
company.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
Website Instagram
LinkedIn X Twitter
Youtube Facebook
+61 892000435
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on certain
assumptions and involve known and unknown risks, uncertainties and other factors, many of which are beyond the company’s
control. Actual events or results may differ materially from the events or results expected or implied in any forward-looking
statement. The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to
the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be fulfilled. Tempest
undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date of this
document (subject to securities exchange disclosure requirements). The information in this document does not take into
account the objectives, financial situation or particular needs of any person or organisation. Nothing contained in this document
constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project comments is based on information
compiled by Don Smith who is the Managing Director at Tempest Minerals Ltd. Don is a Member of AusIMM, AIG and GSA and
has sufficient experience relevant to the style of mineralisation under consideration and to the activities undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Don consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results
information included in this report from previous Company announcements as referenced in the body of this announcement and
further confirms that all material assumptions underpinning the exploration results contained in those market releases continue
to apply and have not materially changed.
Page 5 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
Appendix A: References
1. Ramelius Resources Ltd Website (accessed 2025-07-16) ➢
2. Ordell Minerals Ltd Website (accessed 2025-07-16) ➢
3. RMS ASX Announcement dated 13 May 2024 “Eridanus Resource up 64%” ➢
4. ORD ASX Announcement dated 19 May 2025 “Aircore Drilling Expands Prospective Barimaia Intrusion
to +7km Strike” ➢
5. TEM ASX Announcement dated 22 July 2025 “Exploration Work Commences at Mt Magnet” ➢
6. Gneiss Results “Mapping Stratigraphy and gold Targets, Wrangler Project, Mount Magnet” July 2025
7. TEM ASX Announcement dated 13 Nov 2023 “Mt Magnet - New Gold Bearing Structures At The Range
Project” ➢
8. TEM ASX Announcement dated 10 September 2025 “Gold In Rock Chips and Expanded Drilling” ➢
9. TEM ASX Announcement dated 25 September 2025 “Auger Sampling Commenced” ➢
10.TEM ASX Announcement dated 04 August 2025 “Drilling Imminent Targeting Gold In Mt Magnet” ➢
11.TEM ASX Announcement dated 29 September 2025 “Drilling Commenced Targeting Gold” ➢
12.TEM ASX Announcement dated 20 October 2025 “First Gold Drilling At Mt Magnet Completed” ➢
13.RMS ASX Announcement dated 28 October 2025 “Mt Magnet plant throughput up to 5Mtpa” ➢
Page 6 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
Appendix B: JORC Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
● Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
● Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
● Aspects of the determination of mineralisation that are
Material to the Public Report.
● In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
● Information discussed in this announcement concerns exploratory Reverse
Circulation (RC) drillholes completed between September and October 2025.
● Individual samples are collected from the rig on a 1m basis in each drillhole.
● Each 1m sample was split directly off the cyclone using a rig-mounted,
conical, dual shoot splitter to deliver a 2-3kg primary split sample into a
numbered calico bag and the bulk reject is passed into a green plastic RC bag
and stored at the drill site.
● Where composite sampling was undertaken, samples were primarily collected
as 4m composite samples. Each ~2-3kg composite sample was created using
a 50mm diameter ‘spear’ and spearing the relevant four, one-metre sample
piles to collect a sub-sample of approximate equal volume from each
one-metre sample pile, the speared sample was placed in a pre-numbered
calico bag to create the four-metre composite sample.
● To ensure the quality of the RC samples collected, every effort was made to
drill all samples dry. The sampling system, rods and cyclone were cleaned at
least every rod (6m).
● Drilling was completed dry using dust suppression.
● Metre delineation was controlled by means of visual marks on the mast chain
on rig. The metre marks were checked for accuracy at the start of the drilling
project.
● The sampling methodology is industry standard and considered both
representative and appropriate for gold mineralisation.
Page 7 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
Drilling
techniques
● Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and
if so, by what method, etc).
● RC drilling was conducted using a truck-mounted Schramm T450WS rig with
an onboard 900CFM/350psi air compressor and a 1800CFM/1000psi external
compressor/booster combined delivers 2700CFM/ 1350psi to the bitface
through 6 m rods (4 ½ inch) and a face sampling percussion hammer (5 to 5
3/4 inch).
Drill sample
recovery
● Method of recording and assessing core and chip sample
recoveries and results assessed.
● Measures taken to maximise sample recovery and ensure
representative nature of the samples.
● Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
● Recoveries from each metre of drilling were not measured, but visual
inspection and monitoring of samples in the field indicate that recoveries were
high, visually consistent, and any variations were logged.
● The drilling string shroud tolerance was monitored to minimise dust, and
metre delineation was kept in check by monitoring marks on the chain.
● No material bias is expected in grade or recovery between the preferential
loss/gain of fine/coarse media.
Logging
● Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
● Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
● The total length and percentage of the relevant intersections
logged.
● All RC chip samples were geologically logged in the field to metre resolution,
recording information on rock type, mineralogy, mineralisation, fabrics,
textures, weathering and alteration.
● Representative sub-samples were collected and stored in chip trays for future
reference.
● All logging was qualitative for geological data collection and quantitative for
geochemical data.
● Logging was conducted at the drill-site using ‘GRID’ software.
● Samples were geologically logged to a sufficient level of detail to support a
Mineral Resource Estimation.
Sub-sampling
techniques and
sample
preparation
● If core, whether cut or sawn and whether quarter, half or all
core taken.
● If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
● For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
● Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
● A rig-mounted, conical splitter was used for all drill samples delivered from the
rig.
● Composited samples for analysis were collected, where chosen, by means of
a sampling spear from metre-interval plastic bags.
● At the laboratory, the samples are dried, crushed and pulverised (90% passing
75 microns). A 100g sample was retained from the pulverised sample for a
four acid (complete) digest and 48 elements were read on ICPMS (4A/MS48).
Gold was reported by 25g fire assay (FA250E04).
● Quality control included inserting CRM samples into the sampling chain at a
Page 8 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
● Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
● Whether sample sizes are appropriate to the grain size of the
material being sampled.
rate of approximately 1 CRM sample for every 50 original samples.
● Both blank and duplicate samples were each inserted at a rate of 1 in 50
samples.
● The total population of control samples for soils and drilling was 5%.
● None of the CRM types contain enough data points to carry out a statistically
significant analysis. A basic graphical assessment of the CRM assay results
did not show significant bias.
● The laboratory blanks show no contamination.
● The drilling sample size (2 - 3kg) and the composite sample size (2 - 3kg) is
regarded as appropriate for the nature and type of material sampled.
● No studies have been undertaken to determine whether sample size was
appropriate of the material sampled.
Quality of assay
data and
laboratory tests
● The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
● For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
● Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
● Samples were assayed to accepted industry standards at nationally certified
laboratories. Multi-acid digestion of pulverised samples was followed by
appropriate ICP-MS/ OES and fire assay technique.
● The RC drill samples were submitted into Intertek in Perth for analysis.
● No check samples were sent to independent laboratories.
Verification of
sampling and
assaying
● The verification of significant intersections by either
independent or alternative company personnel.
● The use of twinned holes.
● Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
● Discuss any adjustment to assay data.
● No independent verification or hole twinning at this stage of the program.
● No adjustments to primary data.
● Data entry and storage procedures are documented as part of Warrigal Mining
standard work procedures.
● Data is collected at the drill-site using ‘GRID’ software.
● Data is stored in the Tempest Micromine Geobank database.
Location of data
points
● Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
● RC collars were initially positioned by means of a handheld android device
using WGS84 Zone 50.
● Accuracy of modern handheld devices is typically <4m horizontal and regarded
Page 9 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
● Specification of the grid system used.
● Quality and adequacy of topographic control.
as appropriate for reconnaissance drill holes.
● Down-hole survey data was collected on all drillholes at the time of drilling
using a gyro.
Data spacing
and distribution
● Data spacing for reporting of Exploration Results.
● Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
● Whether sample compositing has been applied.
● The first-pass drilling program was not completed using a set hole spacing;
rather, holes were located and oriented based on the expected location of
mineralised targets using geological field observations of the structures and
lithologies being tested.
● Where composite sampling was undertaken, samples were primarily collected
as 4m composite samples. Each ~2-3kg composite sample was created using
a 50mm ‘diameter ‘spear’ and spearing the relevant four, one-metre sample
piles to collect a sub-sample of approximate equal volume from each
one-metre sample pile, the speared sample was placed in a pre-numbered
calico bag to create the four-metre composite sample.
Orientation of
data in relation
to geological
structure
● Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
● If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
● It is assumed that the orientation of sampling has achieved unbiased
sampling of structures or mineralisation, with reconnaissance drill holes
targeting moderately steeply dipping (~70o
) structurally controlled lithological
contacts. Additional work will define the nature of the target horizons more
accurately.
● The relationship between the drilling orientation, and the orientation of key
mineralised structures is not considered to have introduced any material
sampling bias. Drilling was designed to perpendicularly intersect mineralised
structures so as to minimise sampling bias.
Sample security
● The measures taken to ensure sample security. ● RC samples were dispatched to the laboratory as soon as possible after
collection. Chain of custody is assumed to have been maintained throughout
the sampling and dispatch process, although not strictly documented.
Audits or
reviews
● The results of any audits or reviews of sampling techniques
and data.
● The program was completed and data collected by experienced staff.
● Drilling data is reviewed before loading to the database.
Page 10 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
● Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
● The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
● All rock information quoted is from tenure held 100% by Warrigal Mining Pty Ltd
which is a subsidiary of Tempest Minerals Ltd.
● Drilling was conducted on P58/1774, M58/229, M58/373 and P58/1770.
● No overriding interests are present to the Company’s knowledge.
● Tempest acknowledges the traditional owners of the land.
● All tenements are in good standing.
Exploration done by
other parties
● Acknowledgment and appraisal of exploration by other
parties.
● Tempest acknowledges the work by previous explorers including Harmony Gold and
Ramelius Resources.
● Tempest and Gneiss Results have identified drilling by historical explorers which is
not comprehensively reported to WAMEX and for which records are not available.
● Prior small holders of Prospecting Licenses have held portions of the tenure in the
past and have not reported all exploration activity.
Geology
● Deposit type, geological setting and style of mineralisation. ● The Range Project lies within the Murchison Domain greenstone stratigraphy.
● Geology observed to date places the Project geology into the lower greenstone
formations of the Murchison Domain.
● Lithology observed during the mapping includes komatiitic basalts, basalts,
gabbros, banded iron formations and porphyritic rocks consistent with the
sequences observed in the Mount Magnet and Boogardie Basin, adjoining the
Project Area.
● NNW (and also NNE) trending foliations, faults and shear zones are visible
throughout the outcrops at the project with the former appearing to be related to
localised mineralisation.
● The N-S oriented, gold mineralised Britannia Well Shear also passes through the
Project.
Page 11 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
Drill hole
Information
● A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
○ easting and northing of the drill hole collar
○ elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
○ dip and azimuth of the hole
○ down hole length and interception depth
○ hole length.
○ If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding
of the report, the Competent Person should clearly
explain why this is the case.
● A table of current drill holes with gold assays and notes regarding geology
is supplied in Appendix C of this document.
Data aggregation
methods
● In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
● Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.
● The assumptions used for any reporting of metal equivalent
values should be clearly stated.
● No aggregation has been used to the Company’s knowledge, all results are
percussion quoted in metres where simple averaging is utilised.
● No metal equivalents have been used.
Relationship
between
mineralisation
widths and
intercept lengths
● These relationships are particularly important in the reporting
of Exploration Results.
● If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
● If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
● The geometry of the geology is not clearly definite at this stage of
exploration. The current exploration program is designed to provide
structural and morphological data.
● Drill hole intercepts are reported as downhole intercepts.
Diagrams
● Appropriate maps and sections (with scales) and tabulations
of intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
● Diagrams are presented to provide as much context as possible to the
location and nature of the work completed.
Page 12 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and mill
plan view of drill hole collar locations and appropriate
sectional views.
Balanced reporting
● Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and high
grades and/or widths should be practised to avoid misleading
reporting of Exploration Results.
● All data from the drill program that has been received to date is provided in
this announcement.
● Representative reporting of both low and high grades and widths is
practised.
Other substantive
exploration data
● Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological
observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
● All meaningful and material information has been included in the body of
the announcement.
● The reporting of previous exploration work performed by Warrigal Mining
not discussed above can be found in Tempest Minerals ASX
announcements in Appendix A and WAMEX statutory reports.
Further work
● The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
● Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations and
future drilling areas, provided this information is not
commercially sensitive.
● Further work is contingent on data interpretation and mapping to better
target drilling. Detailed observations will provide improved geological
understanding of potential target zones, which can be used to further the
project.
● Targeting will focus on identifying additional altered porphyry contact
zones.
● Further work is expected to include systematic infill and extensional
drilling.
Page 13 | 16
ASX : TEM
2025-11-06 | Gold in early drill results beside existing open-pit and millt
Appendix C: Drillhole Data
D
Share your feedback
Discover