High-Grade Magnetite Deposit Emerging at Remorse - Amended
Released
Released
Announcement PDF
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse (Amended)
TEM | Yalgoo Update - High-Grade Magnetite Deposit Emerging at Remorse
(Amended)
Tempest Minerals Limited (ASX: TEM “Tempest” or “the Company”) provides the following as an amendment
to the ASX Announcement released on 03 December 2024.
The announcement has been amended to include:
● Body
○ More detailed geological map included
○ Grades updated to include assay data not available at the time of the original announcement refer pages 2, 17 and 18 (Drillholes WARDH00171, 172, 173, 178 and 180)
● Appendix B JORC Table 1 and related information
● Appendix C Geological Data
● Appendix D Assumptions
This announcement has been authorised for release by the Board of the Company.
Contact
For more information, please contact:
Don Smith
Managing Director
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
Website
Instagram
LinkedIn
Twitter
Youtube
Facebook
+61 892000435
Tempest Minerals Ltd │ ACN 612 008 358
Phone: +61 8 9200 0435
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse
TEM | Yalgoo Update - High-Grade Magnetite Deposit Emerging at Remorse
Key Points
● Exciting High-Grade Magnetite Deposit Emerging at the Remorse Target
● Size estimate is considered robust and conservative
● Deposit strategically located beside world-class processing infrastructure
Summary
Tempest Minerals Ltd (TEM) is pleased to announce a significant new high-grade magnetite Exploration
Target at the Remorse Prospect, located within the Company’s 100% owned Yalgoo Project which has
multiple world-class iron ore operations nearby.
This is an exciting development following on from announcements that recently completed RC drilling at the
Remorse Target has identified the presence of thick, high-grade, magnetite-hosted iron in initial assays in
multiple drill holes over several kilometres of strike length.
The approximate Exploration Target is estimated at:
Table 1: Exploration Target Summary.
Tonnage Range
Fe Grade Range
Tonnes - Upper (mt)
Tonnes - Lower (mt)
%Fe - Upper
%Fe - Lower
110
50
32
30
Note: The potential quantity and grade of the Exploration Target is conceptual in nature and as such there has
been insufficient exploration drilling conducted to estimate a mineral resource. At this stage, it is not guaranteed
further exploration will result in the estimation of a mineral resource. The Exploration Target has been prepared
in accordance with the JORC Code (2012) and the Valmin Code (2015).
Remorse Project
Background
Tempest Minerals Ltd completed an exploration drilling program in October 2024 at the Remorse Target within the
Company’s 100% owned greater Yalgoo Project 1, 2. Although targeting base metal anomalism initially, the program
intersected thick high-grade magnetite in the ‘footwall’ of the target geological sequence.
Intercepts include:
WARDH00160 32m @ 30.0% Fe from 96m (including 7m @ 37% Fe) (Lab).
WARDH00180 17m @ 34.4% Fe from 134m (Lab)
WARDH00169 20m @ 32.3% Fe from 120m (pXRF)
and 11m @ 30.8% Fe from 182m (pXRF)
WARDH00166 7m @ 32.8% Fe from 96m (Lab)
WARDH00171 8m @ 30.5% Fe from 130m (Lab)
* Portable XRF (pxrf) results are not comparable in reliability to authorised laboratory results and should not be relied on for
quantitative purposes. However, the pXRF data has been compared with assays received to date (>800 samples) and the results
indicate the accuracy is considered acceptable for current exploration reporting purposes (<4.2% mean var. underestimation).
Page 2 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse
Exploration Target
Drilling intercepted multiple magnetite units (up to 6 mapped at the surface) with the northern-most zone
tested to date displaying the greatest economic potential with up to 27m true thickness and composite
grades in excess of 30% Iron with maximum grades of up to 39% Iron.
As a result of the original drill program design targeting the sequence immediately above the main magnetite
zone, only 4 drillholes to date have definitively intersected this sequence. This is considered inadequate to
generate a reportable resource estimate. In lieu of this, the assumptions and calculations in this document
are made in ‘exploration target’ format.
However, due to:
a) the consistency of results encountered during drilling in terms of geometry, thickness and grade;
b) the very strong correlation of the modelling present prior to drilling;
c) the extensive outcrop on site which the drilling and model match exceptionally well and is definable over
multiple kilometres;
the confidence in the deposit is already above that often considered for an ‘Exploration Target’ and, as such,
the lower ranges quoted in this exploration target are considered conservative.
The Exploration Targets presented above are based on the following information and assumptions:
Table 2: Exploration Target Assumptions Summary.
Upper Range
Lower Range
Length m
Depth m
Width m
%Fe
SG
Length m
Depth m
Width m
%Fe
SG
4700
300
15
32
3.8
4700
300
10
30
3.8
Detailed information and assumptions are supplied in Appendix DD of this document.
Figure 01: Remorse RC Drillholes and Main Iron Outcrop (red outline)
Page 3 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse
Figure 02: Geological Mapping (iron zone outcrops in blue) and Total Magnetic Intensity (warmer more magnetic)
Figure 03: 3D Model (Isometric View) Of The Remorse Magnetite Deposit With Drillholes
Page 4 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse
Figure 04: Remorse map in context to nearby iron ore mines and infrastructure
Next Steps
To further test the validity of the of the Exploration Targets presented, the Company proposes the following
works;
-
Metallurgical Test Work
-
Approvals for future works including environmental studies
-
Economics and Infrastructure studies
-
Planning for further drilling
This work is planned to commence in Q1 2025 and aiming for work to be carried out throughout 2025. The
Company will update the market and shareholders on progress as soon as it is able.
Page 5 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian-based mineral exploration company with a diversified portfolio of projects in
Western Australia considered highly prospective for precious, base and energy metals. The Company has an
experienced board and management team with a history of exploration, operational and corporate success.
Tempest leverages the team’s energy, technical and commercial acumen to execute the Company’s mission - to
maximise shareholder value through focused, data-driven, risk-weighted exploration and development of our
assets.
Investor Information
investorhub.tempestminerals.com
TEM welcomes direct engagement and encourages shareholders and interested parties to visit the TEM Investor
hub which provides additional background information, videos and a forum for stakeholders to communicate with
each other and with the company.
Contact
For more information, please contact:
Don Smith
Managing Director
Level 2, Suite 9
389 Oxford Street
Mt Hawthorn,
Western Australia
6016
Website
Instagram
LinkedIn
Twitter
Youtube
Facebook
+61 892000435
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on certain
assumptions and involve known and unknown risks, uncertainties and other factors, many of which are beyond the company’s
control. Actual events or results may differ materially from the events or results expected or implied in any forward-looking
statement. The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to
the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be fulfilled. Tempest
undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date of this
document (subject to securities exchange disclosure requirements). The information in this document does not take into
account the objectives, financial situation or particular needs of any person or organisation. Nothing contained in this document
constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results, Exploration Targets and general project comments is
based on information compiled by Don Smith is the Managing Director of Tempest Minerals Ltd. Don is a Member of AusIMM,
AIG and GSA and has sufficient experience relevant to the style of mineralisation under consideration and to the activities
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Don consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears.
Page 6 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse
Appendix A: References
1. TEM ASX Announcement dated 21 November 2024 “Yalgoo Update - Further Excellent Iron Results”
2. TEM ASX Announcement dated 24 October 2024 “Yalgoo Update - High-Grade Iron Intercepted In Early
Drilling At Remorse”
Page 7 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse.| JORC TABLE 1
Appendix B: JORC Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
●
●
●
●
Drilling
techniques
●
Commentary
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample
representativity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
●
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if
so, by what method, etc).
●
●
●
●
●
●
●
●
Information discussed in this announcement concerns exploratory Reverse Circulation (RC)
drillholes completed between September and October 2024.
Individual samples are collected from the rig on a 1m basis in each drillhole.
Each 1m sample is split directly off the cyclone using a rig-mounted, conical, dual shoot
splitter to deliver a 2-3kg primary split sample into a numbered calico bag and the bulk reject
is passed into a green plastic RC bag and stored at the drill site.
Sieved fines of each metre drilled are collected separately for first-pass geochemical analysis
on Boxscan™. Boxscan analysis facilitates rapid and early decision-making for assessing
which samples or composites are to be submitted for laboratory analysis and for timely
planning.
To ensure the quality of the RC samples collected, every effort was made to drill all samples
dry. Water incursion is noted in the drill logs. The sampling system, rods and cyclone were
cleaned at least every rod (6m).
Drilling was completed dry using dust suppression but without any water injection.
Metre delineation was controlled by means of visual marks on the mast chain on rig. The
metre marks were checked for accuracy at the start of the drilling project.
The sampling methodology is industry standard and considered both representative and
appropriate for both copper and iron mineralisation.
RC drilling was conducted using a track-mounted Hydco 1000H rig with an onboard
1150CFM/351psi air compressor and a similarly rated external compressor /booster
combined delivers 2400CFM/ 900psi to the bitface through 6 m rods (4 ½ inch) and a face
sampling percussion hammer (5 to 5 3/4 inch).
Page 8 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse.| JORC TABLE 1
Criteria
Drill sample
recovery
JORC Code explanation
●
●
●
Logging
●
●
●
Sub-sampling
techniques and
sample
preparation
●
●
●
●
●
●
Commentary
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
●
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
The total length and percentage of the relevant intersections
logged.
●
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness o
the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
Recoveries from each metre of drilling were not measured, but visual inspection and
monitoring of samples in the field indicate that recoveries were high, visually consistent, and
any variations were logged.
The drilling string shroud tolerance was monitored to minimise dust, and metre delineation
was kept in check by monitoring marks on the chain.
No material bias is expected in grade or recovery between the preferential loss/gain of
fine/coarse media.
All RC chip samples were geologically logged in the field to metre resolution, recording
information on rock type, mineralogy, mineralisation, fabrics, textures and alteration.
Representative sub-samples were collected and stored in chip trays for future reference.
All logging was qualitative for geological data collection and quantitative for geochemical data.
Samples were geologically logged to a sufficient level of detail to support a Mineral Resource
Estimation.
Summary geological logging is presented in Appendix C.
A rig-mounted, conical splitter was used for all drill samples delivered from the rig.
Composited-samples for analysis were collected where chosen, by means of a sampling spear
from metre-interval plastic bags..
At the laboratory, the samples are dried, crushed and pulverised (90% passing 75 microns). A
100g sample was retained from the pulverised sample for a four acid (complete) digest and
48 elements were read on ICPMS. Gold was assayed by 25g fire assay.
Quality control included inserting CRM samples into the sampling chain at a rate of
approximately 1 CRM sample for every 50 original samples.
Both blank and duplicate samples were each inserted at a rate of 1 in 50 samples.
The total population of control samples for soils and drilling was 5%.
None of the CRM types contain enough data points to carry out a statistically significant
analysis. A basic graphical assessment of the CRM assay results did not show significant
bias.
The laboratory blanks show no contamination.
The drilling sample size (2 - 3kg) and the soil sample size (<1kg) is regarded as appropriate for
the nature and type of material sampled.
Page 9 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse.| JORC TABLE 1
Criteria
Quality of assay
data and
laboratory tests
JORC Code explanation
●
●
●
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
Commentary
●
No studies have been undertaken to determine whether sample size was appropriate of the
material sampled.
●
Samples were assayed to accepted industry standards at nationally certified laboratories.
Multi-acid digestion of pulverised sample was followed by appropriate ICP-MS/ OES and/or
fire assay technique.
The RC drill samples were submitted into Intertek in Perth for analysis.
No check samples were sent to independent laboratories.
Boxscan analysis was conducted on the soil samples to determine mineralogy, geochemistry
and magnetic susceptibility. Boxscan is an innovative system integrating industry-standard
ASD, pXRF, and Magsus tools for automated data measurement and capture. Quality control is
ensured by proper calibration and check protocols.
pXRF and Labspec ASD analysis was conducted by Galt Mining Solutions personnel utilising
Geotek's Boxscan automated system.
The scanning of sieved RC drilling fines sample material utilised an Olympus Vanta M Series
portable XRF in Geochem mode (3 beam) and a 20-second read time for each beam
(Instrument_Serial = 840951).
The ASD data reader on Boxscan has a 3 nm VNIR, 6 nm SWIR spectral resolution of the
LabSpec 4 Hi-Res analytical instrument (Electronics serial number: 28191).
The pXRF and ASD are incorporated into Geotek's Boxscan machine to facilitate an automated
data collection process.
This includes periodic calibration and QAQC scans on
Geotek-supplied pucks and colour strips.
QAQC scans are verified and checked on Boxscan’s internal program datasheet against
expected results to ensure the analysers are conforming to Boxscan’s expected operating
parameters.
Readings were taken at room temperature and have dedicated cooling systems to ensure
consistent temperature within optimal operating conditions
A review of the pXRF and ASD sample results provided an acceptable level of analysis and the
data is appropriate for reporting the geochemistry results in the context of its use for
screening areas for indications of elevations in concentrations with elements of interest.
pXRF and ASD results should never be considered a proxy or substitute for laboratory analysis,
which is required to determine robust and accurate potential for mineralisation. The reporting
of pXRF and ASD results should not be described as an "assay" result as these are not of the
●
●
●
●
●
●
●
●
●
●
●
Page 10 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse.| JORC TABLE 1
Criteria
JORC Code explanation
Commentary
●
●
●
Verification of
sampling and
assaying
●
●
●
●
Location of data
points
●
●
●
Data spacing
and distribution
●
●
●
same level of accuracy or precision as that obtained from a certified laboratory. No results
were corrected.
The pXRF data is exploratory in nature and is used predominantly as an internal workflow to
assist in target prioritisation through an early phase of exploration investigation.
The analysis involved direct point counting on the raw surfaces of the supplied drill fines. The
fines are transferred from geochem packets to purpose-made scanning pucks with the
analysis taken from the middle of these pucks. The sample material was dry and collected and
analysed in ambient temperatures within the processing warehouse.
This provides only semi-quantitative information and is reported as raw data without
significant corrections, which is best interpreted as an abundant/present/absent classification
for most elements. This information provides useful trend analyses at an exploration target
scale.
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
●
●
●
No independent verification or hole twinning at this stage of the program.
No adjustments to primary data.
Data entry and storage procedures are documented as part of Warrigal Mining standard work
procedures.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
●
RC collars were initially positioned by means of a handheld android device using WGS84 Zone
50.
Accuracy of modern handheld devices is typically <4m horizontal and regarded as appropriate
for reconnaissance drill holes.
Down-hole survey data was collected on all angled and vertical drillholes at the time of drilling
using a gyro.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
●
●
●
●
●
Reconnaissance drilling was completed nominally on 500m line spacing and 100-200m hole
spacing.
4m composite sampling has been undertaken by the supervising geologist as appropriate by
spearing the bulk-reject sample.
All reported data from drilling analysed is 1m intervals. Laboratory assays reported and pXRF
results (using the boxscan pXRF and other sensors) are 1m samples. Although compositing
Page 11 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse.| JORC TABLE 1
Criteria
JORC Code explanation
Commentary
●
Orientation of
data in relation
to geological
structure
Sample security
Audits or reviews
was only conducted on intervals considered to be waste and sent for confirmation laboratory
analyses, no composites were reported.
Reported intercepts are an average of the 1m assays
●
●
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
●
The measures taken to ensure sample security.
●
RC samples were dispatched to the laboratory as soon as possible after collection. Chain of
custody is assumed to have been maintained throughout the sampling and dispatch process,
although not strictly documented.
●
The results of any audits or reviews of sampling techniques
and data.
●
Drilling data is reviewed and validated before loading to the database.
●
●
It is assumed that the orientation of sampling has achieved unbiased sampling of structures
or mineralisation, with reconnaissance drill holes targeting near vertical targets. Additional
work will outline the nature of the target horizons in more detail.
The relationship between the drilling orientation, and the orientation of key mineralised
structures is not considered to have introduced any material sampling bias.
Page 12 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse.| JORC TABLE 1
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness
or national park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
●
●
●
●
●
●
Drilling was conducted on E59/2465 and E59/2479.
Access and drilling earthworks were conducted on E59/2465, E59/2479 and E59/2786.
The tenements form part of the Ýalgoo Project’. Warrigal Mining PL owns 100% of the Yalgoo Project in
the Western Australia as a wholly owned subsidiary of listed entity Tempest Minerals Ltd.
All tenements are in good standing.
No overriding interests are present to the Company’s knowledge.
Native title has not been granted on the granted tenements.
●
Acknowledgment and appraisal of exploration by other
parties.
●
No known previous exploration has been conducted over the Remorse target area.
●
Deposit type, geological setting and style of
mineralisation.
●
There is no previously recorded mineralisation at the Remorse drilling Target however, stratigraphic soil
anomalism in conjunction with displaced feeder faults show hallmarks of a VMS system similar to
nearby Golden Grove.
Numerous iron-rich units have been mapped at Remorse and are coincident with geophysical
(magnetic) highs.
○ Units dip ~87o to the SW.
○ Are medium-grained and appear to be massive, rather than banded.
○ The medium-grained characteristic is likely to be due to recrystallisation during
metamorphism.
○ The magnetite units are generally internally consistent and are discrete with sharp
boundaries.
Developing the understanding of the geological characteristics of these magnetite units is a major part
of the focus of current work.
Besides fault displacement, the prospect appears to have a relatively simple ‘layer-cake’ morphology of
mineralised magnetite units, meta-sedimentary rocks and meta-mafic rocks.
●
●
Exploration
done by other
parties
Geology
Commentary
●
●
●
Page 13 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse.| JORC TABLE 1
Criteria
Drill hole
Information
Data
aggregation
methods
JORC Code explanation
Commentary
●
There are a number of significant magnetite projects in the region, including Karara, Sino and Mt
Gibson.
●
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
○ easting and northing of the drill hole collar
○ elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole colla
○ dip and azimuth of the hole
○ down hole length and interception depth
○ hole length.
○ If the exclusion of this information is justified
on the basis that the information is not Materia
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
●
A table of current drill holes is supplied in Appendix C of this document.
●
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
●
No aggregation has been used to the Company’s knowledge, all results are percussion quoted in
metres where simple averaging is utilised.
No metal equivalents have been used.
●
●
●
Page 14 | 27
ASX : TEM
2025-01-16 | Yalgoo Update - High Grade Magnetite Deposit Emerging At Remorse.| JORC TABLE 1
Criteria
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration dat
Further work
JORC Code explanation
Commentary
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
●
Holes were drilled at -60o at ~90o to the strike of the target. The magnetite units dip at 87o, i.e.
essentially vertical. Therefore,
Share your feedback
Discover