Quarterly Activities Report
Released
Released
Announcement PDF
ASX: Li3
31 January 2020
DECEMBER 2019 QUARTERLY REPORT
•
Extensive Gold and Copper Portfolio Secured with the acquisition
of Warrigal Mining Pty Ltd
•
510km2 secured at the highly prospective Yalgoo & Mount Magnet
mining districts
•
High Grade and shallow targets being prioritised for follow up
including:
8g/t gold surface quartz vein chips reported at Warriedar
(Yalgoo)
15m @ 2.33 g/t (including 7m @ 3.4g/t) historical drill
results at Euro
•
Most permits located within 20km of established processing
facilities with capacity
•
High-quality projects being prioritised for 2020 programs
•
Company assets review completed
Lithium Consolidated Limited (ASX: LI3) (Li3 or Company) is pleased to report on its
activities in the December 2019 quarter.
Acquisition of Warrigal Mining Pty Ltd
In December 2019, Li3 completed its purchase of a 100% interest in the Western Australian
based exploration company Warrigal Mining Pty Ltd (Warrigal). (Refer previous ASX release
“Completion of Warrigal Mining Acquisition” dated 13 December 2019)
Li3 now has an extensive landholding of 510km2 in the Murchison Province of Western
Australia in the Mount Magnet and Yalgoo mineral fields, some 500km North-East of Perth.
LITHIUM CONSOLIDATED LTD │ ACN 612 008 358
Phone: +61 8 9380 6789
Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
1
Figure 1. Mt Magnet and Yalgoo tenement location map
Warriedar Project
The Warriedar Project is based on 333km2 of granted tenure located in the Warriedar Fold
Belt of the Yalgoo-Singleton greenstone belt and sits within 20km of two milling and
processing facilities – namely the Minjar Golden Dragon Mine and the EMR Capital Golden
Grove polymetallic mine. The Warriedar Project is flanked by greenstones and volcanics
and a significant intrusive related gold system (IRGS) at the Western prospect area has
been surface sampled with grades up to 8g/t.
The Eastern side has more than 25km of previously unrecognized (and unexplored)
greenstone and felsic volcanics - considered highly prospective for volcanogenic massive
sulphides (VMS) and gold.
2
Historical gold production at the Warriedar Mining Centre and State Battery occurred
between 1913-1935 reported an average grade of 10.7g/t Au. The Warriedar Mine produced
copper between 1958-1969 at a grade of 9.83% Cu.
Figure 2. Warriedar schematic geology
Field programs are being prioritised for commencement in the March 2020 Quarter.
Messenger Project
The Messenger project covers an area of 93m2 along the eastern margin of the Warriedar
fold belt and is adjacent to the EMR Golden Grove base and precious metal deposit.
The Messenger Project geology is primarily sedimentary and felsic volcanics including
outcrops of the highly desirable Golden Grove and Scuddles Units which host the major
VMS mineralization in the district. Large outcrops of underexplored greenstone hosted
quartz lodes are also present on the eastern portion of Messenger.
With the original discovery of gold in 1907, Messenger has had an extensive history of
artisanal gold production with minimal modern systematic exploration despite being proximal
to a world-class VMS camp. Messenger offers outstanding potential for the discovery of
greenstone hosted gold, shear hosted gold and VMS.
3
Figure 3: Messenger Project with magnetics and nearby mineral occurrences
Euro Project
The Euro Project is a single 63km2 tenement nestled in the hinge of a tightly folded
greenstone sequence of the south Yalgoo Greenstone belt. The project is centred upon a
number of cross-cutting shear zones known to host significant mineralisation including one
major operation and two high profile development projects.
The Karara Iron Ore Mine, Silver Lake Resources’ Rothsay Mine; and the Mt Mulgine
tungsten/molybdenum deposit are all located within 10km of the Euro Project. Historical drill
intercepts of near-surface gold (tabled below) combined with the recent discovery of
outcrops of large ultramafic units with spinifex textures (indicative of nickel mineralisation)
show the project has significant exploration potential in its own right.
4
Table 1: Historic drilling highlights
Hole ID
Depth
Interval
NR017
20m
15m @ 1.15g/t
NR020
20m
8m @ 0.87g/t (including 5m @ 1.3g/t)
NR018
15m
15m @ 2.33 g/t (including 7m @ 3.4g/t)
Figure 4: Euro Project with magnetics, structure and nearby operations
Range Project
Located 5km from the town of Mt Magnet which boasts a prolific >6Moz historical production
history, the Range Project consists of 20km2 of granted tenure covering a continuous 7km
long strike length of prime geological real estate.
The project hosts numerous shear hosted and orogenic quartz lodes (which make up the
bulk of historic production in the region). More recently the regional exploration focus has
been towards larger intrusive and porphyry-style mineralisation. The North East trending
Boogardie intrusive gold trend being exploited by Ramelius Resource Ltd (ASX:RMS) and
the east-west trending Barimaia porphyry discovery by Genesis Minerals Ltd (ASX:GMD)
intersect in the Range Project.
Mapping has outlined the presence of the same intrusives along with high-grade alteration
(indicators of high-grade mineralisation in porphyry systems) extending from the
neighbouring Britannia open pit and through historic shafts.
5
Figure 5: Range Project with neighbouring exploration success
Transaction terms
Under the share sale agreement, Li3 issued a total of 16,637,384 shares in satisfaction of
Tranche 1 and 2, with 15,250,672 issued to Warrigal shareholders and 1,386,712 shares
issued to Eastern Goldfields Pty Ltd.
Tranche 3 under the share sale agreement which required a cash payment of $200,089.56
was satisfied by the issue of 4,001,791 Ordinary Shares and 4,001,791 Unlisted Options
issued pursuant to the Additional Offer component of the prospectus issued in July 2019.
Tenement Update
The Company’s technical team reviewed the Yilgarn and African Lithium projects. Following
this review, Li3 retained 8 Permits and applications in Western Australia and surrendered 8
tenements. In addition, Li3 has applied for 1 new WA permit (ELA70/5321) selected for its
Lithium and industrial minerals potential.
The Rocky Hill Project is located approximately 100 kms south-east of Perth. Exploration
License application (ELA70/5321) covers an area of 30 km2 and is well located with nearby
to rail and all-weather roads supporting all weather access to container handling at the port
of Fremantle
6
Zimbabwe and Mozambique Hard Rock Lithium Projects
A field trip was undertaken to the five license areas during the quarter in Mozambique to
assess the Lithium potential of the identified prospects. Samples were collected where
outcrop was encountered and results are anticipated in the March 2020 quarter.
There was no exploration activity undertaken on the Zimbabwe projects during the quarter.
Corporate
Capital Raising
In December 2019, the Company completed a private placement of 1,318,221 at 2.7 cents
each to raise $35,592 for working capital.
Board Changes
In January 2020, the Company announced the appointment of Mr Don Smith and Mr Owen
Burchell as Non-Executive directors, pursuant to the acquisition of 100% of Warrigal.
Don Smith is a geologist and entrepreneur with over 20 years in the mining industry. He has
worked in operational, development, exploration and consultant roles for junior through to
multinational firms spanning over 10 countries and numerous commodities including: base
and precious metals and energy minerals.
Don has been involved with a number of private and public resource companies including as
a founding director of Platypus Resources and BK Gold Mines where he was involved in
project acquisition, development and corporate affairs and management. More recently, as a
director of Alderan Resources, he was involved in the development of the company’s assets
and successful IPO. He is currently involved with several start-ups and works as a
consultant.
Don has a Bachelor of Science from Newcastle University and a Master of Business
Administration from the Australian Institute of Business. Don is also a member of the
Australasian Institute of Mining and Metallurgy and a member of the Australian Institute of
Geoscientists.
Owen Burchell is a mining engineer with 20 years of technical, operational and corporate
experience including management positions at Rio Tinto, BHP and Barrick Gold through to
numerous mining start-ups, closures and operational turnaround projects.
Owen is currently a director of several private resource companies and draws on his
extensive industry knowledge consulting on numerous projects in the resources sector.
Owen holds several post graduate qualifications from the West Australian School of Mines
and is the holder of a First Class Mine Managers Certificate of Competency. Owen is also a
member of the Australasian Institute of Mining and Metallurgy.
In December 2019, the Company announced the appointment of Mr Paul Jurman as
Company Secretary. Mr Jurman is a CPA with more than 15 years' experience and has
been involved with a diverse range of Australian public listed companies in company
secretarial and financial roles. He has extensive experience including liaison with ASX and
ASIC, control and implementation of corporate governance, statutory financial reporting, and
shareholder relations. He is currently company secretary of Carnavale Resources Limited
and Platina Resources Limited.
7
Other
The Company continues to assess new lithium and other exploration opportunities.
Details of the Company’s financial activities during the quarter are set out in the Appendix 5B
cash flow report.
Capital structure
At the end of the quarter, there were 147,266,673 fully paid ordinary Shares, 41.4 million
unlisted Options and 0.7 million unlisted Performance Rights on issue.
The Board of the Company has authorised the release of this announcement to the market.
For more information, please contact:
Andrew Haythorpe
Managing Director
Phone: +61 (0) 8 9380 6789
Please visit us at: www.li3limited.com
Cautionary Statements
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only
predictions, based on certain assumptions and involve known and unknown risks,
uncertainties and other factors, many of which are beyond the company’s control. Actual
events or results may differ materially from the events or results expected or implied in any
forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or
prediction with respect to the accuracy of the underlying assumptions or that any
forward-looking statements will be or are likely to be fulfilled. Li3 undertakes no obligation to
update any forward-looking statement to reflect events or circumstances after the date of this
document (subject to securities exchange disclosure requirements).
The information in this document does not take into account the objectives, financial
situation or particular needs of any person or organisation. Nothing contained in this
document constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project
comments is based on information compiled by Nicholas Revell, a Competent Person who is
a Member of The Australian Institute of Geoscientists. Mr. Revell is a geologist consultant to
Lithium Consolidated. Mr. Revell has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr. Revell consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
8
Appendix 1 Exploration Tenements
Li3 provides the following addendum in relation to additional information required by Listing
Rule 5.3.3
Mining Tenements, Beneficial Interests and agreements held as at the end of the quarter:
Tenement Number
Li3 Interest
Location of
Tenements
WARRIEDAR PROJECT
E 59/2224
100% (Application)
Western Australia
WARRIEDAR PROJECT
E 59/2308
100% (Application)
Western Australia
WARRIEDAR PROJECT
E 59/2374
100% (Application)
Western Australia
WARRIEDAR PROJECT
E 59/2375
100%
Western Australia
MESSENGER
PROJECT
E 59/2350
100%
Western Australia
MESSENGER
PROJECT
E 59/2381
100%
Western Australia
EURO PROJECT
E 59/2319
100%
Western Australia
RANGE PROJECT
P 58/1770
100%
Western Australia
RANGE PROJECT
P 58/1773
100%
Western Australia
RANGE PROJECT
P 58/1781
100% (Granted)
Western Australia
RANGE PROJECT
P 58/1783
100% (Granted)
Western Australia
RANGE PROJECT
P 58/1784
100% (Granted)
Western Australia
RANGE PROJECT
P 58/1785
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1786
100% (Granted)
Western Australia
RANGE PROJECT
P 58/1787
100% (Granted)
Western Australia
RANGE PROJECT
P 58/1832
100% (Granted)
Western Australia
RANGE PROJECT
M 58/229
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1680
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1698
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1753
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1761
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1768
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1769
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1774
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1796
100% (Granted/apps)
Western Australia
Tenement Name
9
Tenement Number
Li3 Interest
Location of
Tenements
Caranning
E63/1815
100% (Application)
Western Australia
Windarling
E77/2384
100% (Application)
Western Australia
Rocky Hill
E70/5321
100% (Application)
Western Australia
Ten Mile South
E63/1862
100%
Western Australia
Wanoc
E15/1616
100%
Western Australia
Dundas Nth
E63/1877
100%
Western Australia
Esmond NE
E69/3540
100%
Western Australia
Salmon
E28/2743
100%
Western Australia
Tals 5
Various
100% (Granted)
Zimbabwe
Nels Luck
Various
100% (Granted)
Zimbabwe
Bepe
Various
100% (Granted)
Zimbabwe
Magoda and
Magoda North
Various
100% (Granted/apps)
Zimbabwe
Day Dawn
Various
100% (Granted)
Zimbabwe
Chisuma
Various
100% (Granted)
Zimbabwe
Grey Lady
Various
100% (Granted)
Zimbabwe
Odzi West
Various
100% (Granted/apps)
Zimbabwe
Tenement Name
Yilgarn Project
Zimbabwe Project*
*Note: the 8 Zimbabwe projects are comprised of a total 72 prospecting licences, of which 59
have been granted.
Mozambique Project
License 9167 L
9167L
100%
Mozambique
License 9190 L
9190L
100%
Mozambique
License 9166 L
9166L
100%
Mozambique
License 9168 L
9168L
100%
Mozambique
License 9188 L
9188L
100%
Mozambique
10
Mining Tenements, Beneficial Interests and agreements acquired during the quarter
Tenement Number
Li3 Interest
Location of
Tenements
WARRIEDAR PROJECT
E 59/2224
100% (Application)
Western Australia
WARRIEDAR PROJECT
E 59/2308
100% (Application)
Western Australia
WARRIEDAR PROJECT
E 59/2374
100% (Application)
Western Australia
WARRIEDAR PROJECT
E 59/2375
100%
Western Australia
MESSENGER
PROJECT
E 59/2350
100%
Western Australia
MESSENGER
PROJECT
E 59/2381
100%
Western Australia
EURO PROJECT
E 59/2319
100%
Western Australia
RANGE PROJECT
P 58/1770
100%
Western Australia
RANGE PROJECT
P 58/1773
100%
Western Australia
RANGE PROJECT
P 58/1781
100% (Granted)
Western Australia
RANGE PROJECT
P 58/1783
100% (Granted)
Western Australia
RANGE PROJECT
P 58/1784
100% (Granted)
Western Australia
RANGE PROJECT
P 58/1785
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1786
100% (Granted)
Western Australia
RANGE PROJECT
P 58/1787
100% (Granted)
Western Australia
RANGE PROJECT
P 58/1832
100% (Granted)
Western Australia
RANGE PROJECT
M 58/229
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1680
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1698
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1753
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1761
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1768
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1769
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1774
100% (Granted/apps)
Western Australia
RANGE PROJECT
P 58/1796
100% (Granted/apps)
Western Australia
Rocky Hill
E70/5321
100% (Application)
Western Australia
Tenement Name
11
Mining Tenements, Beneficial Interests and agreements disposed of during the quarter
Tenement
Number
Li3 Interest
Location of
Tenements
Bedonia
E63/1814
100%
Western Australia
Esmond
E69/3455
100%
Western Australia
Junction
E28/2631
100%
Western Australia
Snomys
E28/2632
100%
Western Australia
Ten Mile
E63/1813
100%
Western Australia
Nawoc
E15/1542
100%
Western Australia
Cool
E28/2651
100%
Western Australia
Dundas
E63/1826
100%
Western Australia
Junction North
E28/2732
100%
Western Australia
Tenement Name
Yilgarn Project
12
Share your feedback
Discover