SEPTEMBER 2017 QUARTERLY REPORT
HIG HL IG HT S:
•
Gravity infill data acquisition and data remodeling completed at south TLP, Nevada, USA
•
3 lithium brine trap targets identified in south TLP from remodeled gravity data
•
South TLP evaluated as the most prospective part of the Nevada projects
•
Western Australia drilling program of 114 drill holes into inferred spodumene bearing
pegmatite zones to commence in November 2017
•
Detailed 1350 line-km airborne magnetic survey to be acquired over the E 69/3455
(Edmond) license in Western Australia
•
Botswana 5-hole RAB drill program to commence in November 2017
Lithium Consolidated Mineral Exploration Limited (ASX: LI3) (“Lithium Consolidated” or the
“Company”) is pleased to report on activities during the September quarter, including the
advancement of our exploration projects.
The Company is now in position to commence significant exploration activities across our key
projects in Western Australia, Botswana and Nevada, USA.
PROJECTS
1. Ne vada, US A
The Tonopah Lithium Project (“TLP”) is in the Clayton Valley, in West Central Nevada, in the United
States of America.
TLP consist of 471 placer claims over an area of 8,674 acres.
1.1.
Land Ma nage ment
Lithium Consolidated undertook an extensive evaluation and obtained an independent opinion from
SRK Consulting (U.S.), Inc. (“SRK”) to determine the most prospective part of the Nevada projects.
The southern part of TLP was evaluated to be the most prospective and it is the only part of the
Nevada projects where we will be carrying out exploration activities in the next 12 months.
Further to our own evaluation and SRK’s opinion, we have relinquished a total of 1,587 claims
through a relinquishment process which commenced in August 2017.
439 claims in the southern part of TLP were renewed and a further 32 additional claims were staked.
There will be a considerable saving on claims holding costs, from the claims which will be
relinquished.
LITHIUM CONSOLIDATED MINERAL EXPLORATION LTD ACN 612 008 358
Phone: +61 7 3212 6299 Fax: +61 7 3212 6250 Address: Level 10, 110 Mary Street, Brisbane Q 4000
Figure 1: TLP placer claims
Source: Mineral Exploration Services, Ltd
1.2.
Exploration
A gravity infill data survey was acquired over South TLP in August 2017. The newly acquired infill
gravity data was merged with the existing gravity data and re-modeled in August 2017.
3 lithium brine trap targets (see Figure 2) were identified from the 3D inversion modelling.
The re-modeled gravity data has been used to precisely locate 4 lines of magnetotelluric(“MT”)
resistivity survey lines covering a total of 25 line-km (see Figure 2).
The MT resistivity survey will be postponed until 2018.
page 2
Figure 2: Image of Basin Depth based on Gravity Data 3D Inversion Modelling
Source: Ellis Geophysical Consulting Inc.
2. Yilgarn Lithium Project (“YLP”), Western Australia, Australia
YLP is a hard-rock lithium project located in the Yilgarn Province of Western Australia.
YLP consists of 12 Exploration Licenses, including 8 granted Exploration Licenses and 4 pending
Exploration License Applications, covering 557 km2 (see Figure 3).
Spodumene-bearing pegmatite deposits, which have been discovered in the Yilgarn Craton, lie
within exposed lithium-fertile “belts”. Geophysics and geological mapping indicate that these belts
also trend “undercover” into areas where older host basement rocks are covered by younger rocks
and recent sediments.
page 3
Figure 3: YLP Exploration Licenses
Source: West Resources Pty Ltd
2.1.
Exploration Progra m
2.1.1.
Fie ld Reconna issance Progra m
LCME has contracted Newexco Services Pty Ltd, an award-winning WA based geological and
geophysical group to execute the exploration program.
The Newexco team has won numerous awards including “Discovery of the Year” at the 2008 Annual
Excellence in Mining conference and the 2009 AMEC “Prospector of the Year”.
Newexco completed an initial field reconnaissance program in September 2017 to:
prepare for the Phase 1 Drill Program;
identify access to drill sites; and
investigate occurrences of outcropping bedrock geology in areas with inferred pegmatites.
Drilling spoil (old drill chips) from historical RAB/ Aircore drilling was sampled (where possible).
7 of the 10 licenses were visited and rock chip and historical drilling spoil samples were collected
and have been sent for geochemical assaying.
page 4
2.1.2.
Phase 1 Drill Program
A total of 114 Air-core holes will be drilled for an estimated 4,220m on 7 licenses (see Figure 1).
Drilling will be on 14 E-W drill traverses with 200m hole spacing.
Inferred spodumene bearing pegmatite zones, interpreted from an assessment of open file data, are
being targeted through the drill program.
The Phase 1 Drill Program will commence in November 2017.
2.1.3.
Air bor ne Mag net ic Sur ve y
A detailed, 50m line spaced, airborne magnetic survey for an estimated 1350 line-km will be acquired
over the remote E 69/3455 (Edmond) license.
Figure 4: Phase 1 Exploration Program – drilling locations
Source: West Resources Pty Ltd
3. Eucla Projects (South Australia)
LCME’s South Australian Lithium brine tenement portfolio consists of 5 Exploration License
Applications which cover a total of 5,680 km2 of the Eucla Basin.
The license applications have been placed over a series of partially exposed salt-bearing playa lakes
(salt lakes) and their concealed extensions in the Lake Maurice area of the Eucla Basin.
The formal grant of these licenses is subject to completion of the native title process in South
Australia.
There was no material activity at the Eucla Basin Project in the September 2017 Quarter.
page 5
4. Botswana (80% ownership interest)
Lithium Consolidated Mineral Exploration Ltd (“LCME”) completed an initial reconnaissance and
shallow pit sampling program at the 6 Prospecting Licences in Botswana in September 2017.
7 pits were dug using handheld tools to investigate sub-surface conditions. A hard silicified layer at
<1 metre could not be penetrated by digging shallow pits with handheld tools or by auguring, in a
reasonable timeframe.
All evidence suggests that the brines are deeper than can be reached by pitting or auguring.
The 6 water samples collected have been sent to X-LAB Earth, Johannesburg, South Africa (Pty)
Ltd for analysis for major ions, density measurements and TDS (total dissolved solids)
determinations.
The shallow pit sampling program has shown that further investigation of the brines should be done
by rotary air blast (“RAB”) drilling.
4.1.
RAB Dr illing Pro gra m
A limited, 5-hole RAB drill program to commence in November 2017.
The drilling will be to the base of the Kalahari Group, which is expected to be to depths of 50 – 60
meters.
The deeper brine reservoirs will be drilled and separately sampled (by casing off the near surface
fresh water aquifers).
C O R P O R AT E
The Company continues to review corporate development opportunities as they arise.
Details of the Company’s financial activities during the quarter are set out in the Appendix 5B cash
flow report.
Capita l structure
At the end of the quarter, there were 89,972,122 fully paid ordinary Shares, 5.0 million unlisted
Options and 7.5 million unlisted Performance Rights on issue.
For more information, please contact:
Duncan Cornish
Company Secretary
Phone: +61 7 3212 6299
Email: investors@lithiumconsolidated.com
Please visit us at: www.lithiumconsolidated.com
page 6
C AU T IO N AR Y S T AT E ME NT S
Forward -look ing sta te ments
This document may contain certain forward-looking statements. Such statements are only
predictions, based on certain assumptions and involve known and unknown risks, uncertainties and
other factors, many of which are beyond the company’s control. Actual events or results may differ
materially from the events or results expected or implied in any forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or prediction
with respect to the accuracy of the underlying assumptions or that any forward-looking statements
will be or are likely to be fulfilled. Lithium Consolidated undertakes no obligation to update any
forward-looking statement to reflect events or circumstances after the date of this document (subject
to securities exchange disclosure requirements).
The information in this document does not take into account the objectives, financial situation or
particular needs of any person or organisation. Nothing contained in this document constitutes
investment, legal, tax or other advice.
Compe tent Person Sta te ment
The information in this release that relates to Exploration Results has been reviewed and approved
by Jerry Aiken, who is a Registered Member of the Society for Mining, Metallurgy and Exploration
(SME). Jerry Aiken is a geologic consultant to the Company, and has extensive experience relevant
to the styles of mineralisation and type of deposit under consideration. Mr Aiken is a Competent
Person (CP) as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC). Jerry Aiken consents to the inclusion in the
release of the concepts and geologic principles expressed in this press release, based on his review
in the form and context in which it appears.
page 7
Exploration Tenements
Lithium Consolidated held the following interests in claims and tenements at the end of the quarter:
Project Name
Number of Claims
Lithium
Consolidated
Interest
Location of
Claims
471
80%
Nevada, USA
TLP
Tenement Number
Lithium Consolidated
Interest
Location of Tenements
Bedonia
E 63/1814
100%
Western Australia
Caranning
E 63/1815 (Application)
100%
Western Australia
Windarling
E 77/2384 (Application)
100%
Western Australia
Esmond
E 69/3455
100%
Western Australia
Junction
E 28/2631
100%
Western Australia
Snomys
E 28/2632
100%
Western Australia
Ten Mile
E 63/1813
100%
Western Australia
Nawoc
E 15/1542
100%
Western Australia
Cool
E 28/2651
100%
Western Australia
Dundas
E 63/1826
100%
Western Australia
Ten Mile South
E 63/1862 (Application)
100%
Western Australia
Wanoc
E 15/1616 (Application)
100%
Western Australia
Lake Dey Dey
2016/00127 (Application)
100%
South Australia
Lake Maurice
2016/00128 (Application)
100%
South Australia
Nurrari
2016/00129 (Application)
100%
South Australia
Wyola North
2016/00130 (Application)
100%
South Australia
Wyola South
2016/00131 (Application)
100%
South Australia
-
263/2016
80%
Botswana
-
264/2016
80%
Botswana
-
265/2016
80%
Botswana
-
266/2016
80%
Botswana
-
267/2016
80%
Botswana
-
268/2016
80%
Botswana
-
269/2016
80%
Botswana
-
270/2016
80%
Botswana
Tenement Name
Yilgarn Project
Eucla Basin Project
Botswana Project
page 8
Share your feedback
Discover